Table of Contents
Investigating the Effect of Account Receivable & Delivery
Delay on the Profitability of a Medical Department
-Siemens Case-
A.llker Soydan
Siemens San. ve Tic. A.S.
Corporate Strategies and Consulting
Yakacik Y olu No:111
34861 Kartal Istanbul- TURKEY
Phone: +90 216 459 3865
Fax : +90 216 459 3915
E-mail _ : ilker.soydan@ siemens.com
URL : http:/Awww.siemens.com
Yusuf Sire
Bogazici University
Sair Nedim Cad. N0:110 Daire:10
Besiktas Istanbul TURKEY
Phone : +90 532 2373869
Fax : +90 216 4593915
Email —: ysire@ yahoo.com
Abstract
This study focuses on the problem of getting Account Receivables and delivering
products/ systems on time for the Medical Department of Siemens Turkey. The
Balanced Scorecard approach was used as a base platform which served as a
decomplexifying element for the initial modeling tangle. In the department, there
are salespeople who does the sales via monthly visits to customers. After
collecting the orders, they follow some processes. When the order is delivered, the
payment does not occur immediately, especially for the state customers and there
exists an oscillating delivery time. This simulation model achieves giving the
knowledge and ability to the managers to make plans accordingly. Having seen the
outputs, they organize their plans pre-active, but not reactive in the long term. The
project had one more tenet which is launching the system dynamics approach
intemally and making managers use it as their regular thinking style.
1, System Dynamics Methodology
Despite the growth and acceptance of System Dynamics, it is far from being well-known as
a field itself or as a contribution to the fields in whichitis used.
When we look at a group of individual parts, as well as the connections or interactions
among those parts, we are viewing a “system”. A system is a collection of parts that work together
in order to function as a whole. In all systems the relationship between the parts determine what the
system does and how it functions as a whole. Therefore the relationships are often more important
than the individual parts.
Many of the systems we are part of are dynamic rather than static. They tend to change
throughout the passage of time. It is referred to the way a system changes over time as the
systems behavior. And when a system's development follows a typical pattern, we say the system
has a behavior pattern. Effective decision making and learning in a world of growing dynamic
complexity requires us to become systems thinkers. Whether a system is dynamic or static depends
on which time horizon you choose and which variables you concentrate on. The time horizon is the
time period over which you study the system and a variable is a changeable value in a system. [9]
1.1 Application Areas of System Dynamics
The field of system dynamics is thriving. Over the past decade, many top companies,
consulting firms or NGOs have used system dynamics to address critical issues. Tools and
methods of it and the library of applications and insights into the effective use of the tools with
senior executives and organizations are all expanding rapidly.
Since its publication, the span of applications has grown extensively ranging in a very large
spectrum. To name some of them:
+ Business
* Biological problems
* Corporate and business planning and policy design
* Medical modelling
* Strategic quality management
* Long-term water planning
* Strategic insurance management
° Education
2. Balanced Scorecard Approach
The Balanced Scorecard is a popular concept which focuses on management’ attention to
few measures and bridges between different functional areas. [8] In other words the Balanced
Scorecard (BSC) is a proven approach to strategic management that imbeds long-term strategy
into the management system through the mechanism of measurement. For years, senior leaders
have struggled to use financial-driven performance management systems to achieve operational
and strategic goals such as adjusting the workforce level, reducing the delivery delay or
increasing/decreasing the capacity.
In essence, a corporate scorecard is a sophisticated business model that helps a company
or a department understand what's really driving its success. We can only get success on the
drives that we can actually measure. Unfortunately, the things most companies measure (short-
term financial performance and local productivity) don’t determine long-term success in a
competitive marketplace, in other words sustainable success on the metrics.
BSC structure is chosen as it is among the most famous performance management
systems and tried to be the main thinking base of the model that we have created and shown in the
next sections.In Fig.1 lies the general fram ework for Balanced Scorecard (BSC).
Business Scorecard
Finance
Customers/ Business Internal
market strategy processes
¥
Employees/
innovation
Figure.1 Business Scorecard View [1]
In order to achieve and sustain strategic success via operational excellence, the corporate
/department performance management system must balance on the basis of the following
measures:
* Customer metrics
How the customers view the corporate (for e.g. in terms of satissfaction and loyalty)
+ Business process metrics
How well the core processes of the corporate produce value
* Internal development metrics
How your company learns and g rows
* Financial metrics
How well your company meets shareholder needs
The performance managementsystems _ follow an approach as described in Figure.2
DESIGN
(what, when and
how to measure?)
IMPLEMENT MEASURE
(what happened?)
on ANALYSE
(why did it happen?)
(what-if
actions to adopt?)
Figure.2 DMAPI Cycle [10]
What is actually desired to achieve In this project is to use BSC as a basis platform for the model.
The model comprises of three main compartments:
* Employees
* Market and Finance
* Internal Processes
By the help of these segments, we come up with a model that is formed on basic business
As the Figure.2 shows, the model had basic 5 phases. We designed the relations and internal
structure that gives the dynamic behavior of the system. We have carried out base runs to see what
goes on with the current structure and validated the model with the real life. Then we have analysed
what to change and how to change. After the model has been completed, implementation has been
activated by launching the model to the senior managers’ PCs.
3. Problem Environment & Definition
Siemens Turkey provides complete health care solutions and support diagnoses and
therapy in hospitals. Today, Siemens Turkey Medical Solutions (MED) is considered to be the
market leader in the domestic market. The department offers the medical profession and its
patients, the medical systems, devices and services in Turkey and all over the world. They have a
wide range of products from xray, angiography and ultrasound systems to computerised
tomography, magnetic resonance, nuclear medicine, echocardiography and radiotherapy. The field
of expertise is in imaging techniques, elaborate artificial respiration, anaesthesia equipment and
patient monitors.
Among all, Ultrasound (US) is the most common diagnostic procedure in medical industry
and most innovative modality/product. Ultrasound is a very fast business and has a 5bn $ total
worldwide market.
Siemens TR-MED constitutes of several departments which serve different needs of the
market on the basis of both product and service. MED-US is one of them and they handle the
product business of Ultrasound section. They just do the sales transactions and service part is
carried on with the help of another department.
Roughly speaking, MED-US have sales people who handle the sales of the product. They
have monthly on-call visits to customers and take the orders. Then these orders are transferred to
the department's ordering section and they order the product from Siemens-Germany. There is no
domestic production of US machines and there is very little inventory. The receiving time of the
product from Germany has some time periods. The product's coming to the customs, waiting in the
customs and receiving of the product to the department Having got the order, MED-US starts
installing the machine locally. After that, the order is fulfilled and sent to the customer. After some
start-up procedures and tests carried out in the customer's place, itis claimed to be ready for use.
After getting the order, they sign up a contract with the customer which says that the
payment would be done within a specified time length. They have a various type of customer
structure. Briefly, we can separate them as private and public customers. They have different
contract options for the customers based on private or public. Public customers do not make
agreements on foreign currency which is described by the law. They just sign up Turkish Lira
figures and this creates currency costs. However, the private customers can have agreements on €.
Their customers are mainly the hospitals which can be classified as:
1. University Hospitals
2. Private Hospitals
3. Military Hospitals
4. Social Security Hospitals (SSK)
5. Ministry of Health Hospitals
They have 3 or 4 big competitors in the market and MED-US thinks that they would create
value added by their pre-defined processes which covers technology, marketing, cost/ price,
services and time/ logistics.
In order to sustain and even enlarge their market share, they ltink they have to overcome
their basic two problems. They complain about their long receiving time of the Account Receivables
and current long delivery delays which reveal problems in managing cash flow and sustaining EVA
for the profitability of the department. This requires continuous monitoring of the account
receivables and delivery delays. As they owe debt to the firm's cash for their all kinds of costs, they
desire to be profitable throughout the fiscal year. As a matter of fact, they need to make strategic
plans for the upcoming years and for these plans they need to monitor their future Account
Receivable and delivery delay figures. Delivery delay is also the second most important criteria
evaluated in the “Customer Satisfaction” questionnaire which dictates that it is among the
differentiating factors of competitiveness.
By making plans, they would be able to arrange their sales employment levels, contract
options and fulfilling capacity. Having seen the outputs, we plan to make their plans pre-active, but
not reactive.
4. Conceptual Model
After having carried out 2 interviews with MED-US, the general structure of the department
has been explained in details. The conceptual model has been drawn after arranging these
interviews and synthesizing the articles that are listed in the references part. These papers helped
much in forming a mental model for us. (Please see Fig.3)
The deliver delay affects the incoming order efficiency which is in fact the sales efficiency of
the sales people. Orders in Process (OIP) is the current amount of orders that is in process and it is
affected by the order fulfilling and order entering. Delivery delay is also used in finding Perceived
delivery delay which in turn affects order efficiency.
We have also Possible target delivery rate which affects the fulfilling capacity. Fulfilling
capacity is thought to be an importing and fulfilling capacity. It is different than a production
capacity.
Account Receivables’ (AR) outflow is affected by Deliver delay (the receiving rate of AR)
and orders fulfilling affects the incoming rate of AR. AR and monthly interest rates give feedback to
the profitability which gives us an insight about hiring decision of Sales Experts.
+ average order
a. es ret + se ora entering penerpett
expert Gc
p a ex] ‘\ retiring () Sa
ofhiicnny
Orders in Process
estimated
retiring T DD
a delay
target sales ra
a orders sittings |
i target ()
7 rate (-) +
total market ol
\ Seam Capacity
market value per
salesmen
A i, ccount
incoming rate Receivables, receiving rate Perceived
fi DD
price
Figure.3 Model Causal Loop Diagram [2],[3],[4],[5],[6](71,[8],[9](101,[11],[12],[13][14],
Throughout the modeling process, Balanced Scorecard (BSC) approach has been applied as the
basic constructing material. The main 4 compartments of BSC constituted the content of the model.
You can see the conceptual model in Figure.3 with the articles | have benefited from.
5. Stock & Flow Structure
Having completed the conceptual model, we completed the stock flow structure of the model. You
may find the stock-flow definitions below.
5.1 Stock Variables
Account Receivables: This variable represents the amount of account receivables of company
(department). It is obvious that this variable must be a stock variable. Related flow variables are
incoming rate and receiving rate.
Unit: Euros (€)
Fulfilling Capacity: This is the order fulling capacity of the department. It has the unit “piece per
time”, Related flow variable is capacity change rate.
Unit: piece/month
Orders In Process: This variable represents the number of orders received but not fulfilled yet.
Related flow variables are orders coming and orders fulfilling.
Unit: Item
Percieved DelDek This is the perceived delivery delay of the company. It was added in order to
represent an information delay between the actual and perceived values of delivery delay. Related
flow variable is adjustment flow.
Unit: months
Sales Experts: This variable represents the number of sales person working for the department.
Note that it can have non-integer values. One may think that this is unrealistic, since number of
sales experts hardly exceeds 10. However at Siemens, when a personnel assists more than one
task, his/her is shared among these tasks. For example, 2.35 sales persons means that in addition
to 2 employees who spent full of their time on the sales, another person spends 35% of his time
assisting sales. So, such non-integer values of employees are completely realistic. Related flow
variables are expectedly hiring and retiring.
Unit: Persons
Ultrasound machines are not domestically manufactured. They are imported from Germany. In a
way we can say that, TR-MED department works import-to-order. There is very little or negligible
side product inventory. In this model, we assumed no inventory.
5.2 Flow Variables
Hiring: Number of sales persons hired per month (person/month)
Retiring: Number of sales persons retired per month (person/month)
Incoming rate : Receivables are expanded by the fulfilled orders in the month. (Euro/month)
Receiving rate : Amount of receivables collected in the month. (Euro/month)
Orders coming: Amount of orders taken in the month (piece/month)
Orders fulfilling: Amount of orders fulfilled in the month. (piece/month)
Capacity change rate: Amount of capacity change in the month. (piece/month)
Adjustment flow: Change in perceived delivery delay in the month. (1/month*month)
5.3 Some Important Auxilary Variables
Prof=prof margin* receiving rate- monthly interest rate* Account Receivables.
This is a measure for efficiency of the department. Note that it does not reflect the exact profit of
the department. First term represents the cash generated by the sales activity and the second term
represents the opportunity cost of not receiving the money on time. (Euro/month)
Order Fulling Time: This is the average time needed for an order to be fulfilled
One can see the details of the equations and input functions in the Appendix.
Figure.4 Stock Flow Diagram
6. Simulation and Validation
Simulations are done for 10 years of which 7 years are to the future. In other words the simulation
ends up on 2010. In addition simulations are done on a monthly basis. Here are the most relevant
results:
Ss 1: Account Receivables 2: Fulfilling Capacity 3: Orders in Process 4: Sales Experts
490001
5 ae
4 ‘i a
Peal
5.
a
a
aestag é a
- a per?
an Lancet
100000
1
1
Pi
60.00 90.00 120.00
Pagel Months 1:40PM Paz, Oca 06, 200:
aaée ? Untitled
Figure.5 Account Receivables, Capacity, Orders (OIP) and Sales Experts
Expectedly fulfilling capacity gets enlarged because of the enlargement of the sales expert And the
market for Ultrasound seems to be growing in real life. This is reflected to the model and Account
Receivables enlarge accordingly due to the enlargement of the market. OIP also gets high at the
end of the 10" year. Delivery delay shows a damping oscillatory behaviour after the 30” month
Delivery delay seems to be oscillating much in the first 60 months. Perceived Delivery Delay follows
delivery delay with a lag which was designed to get this result. The simulation results in fact
coincide with the real observations because delivery suspends somewhere among 1-1.5 month. As
the graph shows below, it mostly oscillates in the range of 1.25-1.31 month. In other words the
oscillation in fact does not indicate that much significance because the range is 1 or 1.5 days
which can be tolerated.
10
Ss 1: delivery delay 2: Percieved DelDel
1.49
2.00
Wing
1 12s | UV MAA Aine
2 1264 2: —
0.00 30.00 60.00 90.00 120.00
Pagel Months 1:40PM Paz, Oca 06, 2003
XN aaF ? Untitled
Figure.6 Delivery delay & Perceived delivery delay
& 1: orders tutfting 2: orders coming 3: Fulfilling Capacity 4; Orders in Process
ell
a
0.00 30.00 60.00 90.00 120.00
Months 1:40PM Paz, Oca 06, 2003
bd Untitled
Figure.7 Orders fulfilling and coming, capacity and orders in process
Orders coming and orders fulfilling are also increasing through time which depends on the sales
experts and internal business processes like setup and start up.
11
Perceived deliver delay follows a goal seeking behaviour whereas the deliver delay follows an
damping oscillatory type of behaviour. Likewise the OIP, Experts, Capacity and Account
Receivables follow goal-seeking behaviour with litte oscillatory movements. Profitability and prof
ratio also tries to reach a value and stay there.
One should keep in mind that validation was done mostly on a structural basis because the
department does not have archival data for the model's parameters to validate. They have been
using SAP since 1995 and from that time SAP did not keep record of every thing that we desired to
find. Two years’ data were on hand and with this amount of real data we could not carry out a
behavioural validation.
One will be able to find the structural validity tests carried out for specially chosen variables:
1) Monthly interest rate: Sensitivity runs for a range of monthly interest rate are performed.
Run: Monthly Interest Rate
1 0.01
2 0.06
3 0.11
4 0.16
Account Receivables (Euros) 2/Olx)
B® recoure Receivables: 1-2-9-4-
t 000005
fh 100000-F Tr T T 7
0.00 30.00 60.00 90.00 120.00
Page 2 Moreh 10:21 07 Oca 2003 Sat
| aaf ? Account Receivables (Euros) 7)
Figure.8 Effect of monthly interest rate on Account Receivables
Expected fact
As interest rate increases, holding account receivables becomes even more undesired for the
company. Company is ready to sacrifice its market share in such an environment. However, in
order to stay in the market it can tolerate some degree of loss.
Results of simulation:
12
Results of simulation match with the expected results. As it can be seen , when interest rate
increases, orders fulfilling considerably drops. This leads to drop in accounts receivables. However,
drastic fall in profitability is unavoidable. Loss is expected after nearly 10% of monthly interest. Also
it can be seen that after some level, interest rate is not so effective on order fulfilling rate. We
should remember that strategic decisions such as leaving the market are not considered here.
Delivery Delay & Percieve livery Delay (Oo x)
® 1: delivery delay 2: Percieved DelDel
2.505 ee Gis ieee
i
1,754
24 1,00 T r r 1
0.00 30.00 60.00 90.00 120.00
Page 1 Months 10:56 07 Oca 2003 Sal
NX] aear 2? Delivery Delay & Percieved Delivery Delay ey
Figure.9 Target Delivery Delay =1.25 months
For small target DD values delivery delay sticks to 1.25 months and when target DD>=1.25
behaviour pattern of delivery delay suddenly changes into oscillating. What is the importance of
1.25? It may be easy to see for an expert but it took a long time to understand that this was not due
to any structural mistake.1.25 is the order fulfilling time. In reality, this is the minimum time required
to fulfill an order (5 weeks). Remember that UltraSounds are imported and this requires time. So
even the target delay is set below this physical limitation, it is impossible to respond quicker to
orders. Expected behaviour patterns of delivery delay and perceived delivery delay can be
observed when target DD>=1.25.
13
2000004
3
&® 1: Account Receivables 2: Orders in Process 3: delivery delay
1
2
3 1
1 100000
2 2
3 1
1 0
2 0
4 Hq a |
0.00 30.00 60.00 90:00 120.00
Page 1 Months 11:04 PM. Sal, Oca 07, 200
aeFe 2? Untitled
Figure.10 order per expert per month =0
We expect to come up with zero Accounts Receivables, Orders in Process and delivery delay and
what we find as an outcome for extreme condition test as order per expert per month = 0 coincides
with our prior expectations.
Gradually as we increase the value of orders per expert per month we come up with increasing
Accounts Receivables and Orders in Process. Delivery delay oscillates. This is in fact a very good
enough representation of the department's delivery process.
SD 1: account Receivables 2: Orders in Process 3: delivery delay
a 30000004
2 30 I eT
3 2 bl
ee
4 a
2
1
1 1500000 2
2 154
3 2
A
1 3
3
3 4 3 sas 3 ata
0.00 30.00 60.00 90.00 120.00
Page 1 Months 11:18 PM Sal, Oca 07, 2003
a aF 9 Untitled
Figure. 11 order per expert per month =7
14
Ss 1: prof 2: TARGET PERSONNEL 3: Sales Experts
a
0
0
0 SSE
0.00 3.75 7.50 11.25 15.00
Page 1 Months 12:47AM Car, Oca 08, 2003
eee ? Untited
Figure.12 Profitability and Target Personnel when order per expert / month =0
Expectedly we see that when our profitability drops to zero due to zero order level, our target
personnel drops to zero and likewise experts’ trend goes with the target level of personnel. After
some period (around 7) sales experts get zero as experts trigger the growth of the orders and as
there are no experts, there would be zero experts afterwards with zero profitability. Experts do not
get zero immediately, in other words at a considerable amount of profitability, experts do not get
zero. This reflects a management policy.
15
8. Conclusion & Future Work
What actually achieved in this project is that a vision into the future of Account Receivables
and delivery delay of a Medical Solutions (Ultrasound) department is created and with the help of
this vision they would be monitoring their delivery delay and Account Receivables in order to
sustain profitability. The department has some decision points such as order rate per expert per
month, price, order fulfilling time, cap time, target DD, interest rate etc. These decision points we
think have sensitive effects on the outcomes.
We have analyzed model in terms of changing variable values and tried to give insight
about what goes on when something is changed. We have tried to emphasize what is really
sensitive for decision making.
We knew that the department was the second to market leader in its branch and we have
assumed that the total market for Turkey would be growing until the end of the simulation. Maybe
that’s why it may seem doubtful that the Account Receivables increase till the end of simulation, but
one must keep the mentioned assumption above in mind. Although Account Receivables increase,
we should also have a look at the profitability variable. It is also increasing and for this reason, as
we expect a bigger market, the department seems to be hiring 3 or 4 more sales experts till the end
of the simulation.
One can find our assumptions in the model. We reflected them to our equations. For
instance, if we would have a divisibility by zero error, we defined the lower level close to zero. Price
is an approximate value because they do not have a fixed price, as it changes from customer to
customer. Likewise, market value per salesmen, desired profitability, profitability margin and total
market figures are external estimations.
For future work, the model may be enlarged by adding more details and also the model
may be applied for the whole Medical Solutions Group by forming pseudo terms such as pseudo
price, pseudo costs etc. The group has many operating units (devices) and they may form data for
pseudo product. This project may be accepted as a pilot project in which the main focus was on a
unit of the department. However, modeling the same problems for the whole department should be
the goal.
One extra remark about future study is that a draft simulation game is prepared for the
department so that management policies can be simulated among the department’ s managers
whom would decide better which variable to change how much. In addition, the simulation will be
carried out for the whole Medical Department, not only ultrasound section.
16
10.
11.
12;
13.
14,
REFERENCES
Siemens Intranet, “Business Scorecard: Overview by top+Team”, Munich, May 1999
Kameyama, S., Kobayashi, H., Suetake, T., “Micro-macro Finance Structure Modeling”, 19"
International System Dynamics Proceedings, Atlanta, 2001
Ritchie-Dunham, James L., “Informing Mental Models for Strategic Decision Making with
ERPs and the Balanced Scorecard: A Simulation-Based Experiment”, 19" International
System Dynamics Proceedings, Atlanta, 2001
VENSIM 4 Sofware Modeling Guide, Ventana Systems Inc., USA, 1999
Linard, K., Fleming, C., Dvorsky, L., “System Dynamics as the Link Between Corporate
Vision and Key Performance Indicators”, 19" International System Dynamics Proceedings,
Atlanta, 2001
Linard, K., Bassett, M., Yoon, J., Dvorsky, L., “A Dynamic Balanced Scorecard Template for
Public Sector Agencies”, 20" International System Dynamics Proceedings, Bergen, 2000
Neely, A., Richards, H., Mills, J., Platts, K., Bourne, M., “Designing performance measures:
A Structured Approach”, International Journal of Operations & Productions Management,
Vol.17 No .11, pp.1131-1152, MCB University Press, 1997
Akkermans, H., Oorschot, K. v., “Developing a Balanced Scorecard with System
Dynamics”, J ournal of the Operational Research Society, May 2002
Sterman, J.S., Business Dynamics: Systems Thinking and Modeling for a Complex World.
McGraw-Hill, New York, 2000
Santos, Sergio P., Belton, V., Howick, S., “Integrating System Dynamics and Multicriteria
Analysis: Towards Organisational Learning for Performance Improvement”, 19"
International System Dynamics Proceedings, Atlanta, 2001
Richmond, B, “A New Language for Leveraging Scorecard-Driven Learning”, Balanced
Scorecard: Insight, Experience & Ideas for Strategy-Focused Organizations Report Article
Reprint No.B0101D, Harvard Business School Publishing, http://www.bscreport.com/
Todd, D., Palmer, E., “Development and Design of a ‘Dynamic’ Balanced Scorecard in
Local Government ", Proceedings of European Operations Management Association 8th
International Annual Conference, Bath, United Kingdom, 2001
Warren, K., “Strategy Dynamics and Scenarios of Industry Evolution (DRAFT)", 19
International System Dynamics Proceedings, Atlanta, 2001
Norton, D., “SAP Strategic Enterprise Management Translating Strategy into Action”,
Germany, 1999
th
17
APPENDIX FINPUT FUNCTIONS
Figure.14 Effect of profitability ratio on target personnel
18
APPENDIX IFEQUATIONS
Account_Receivables(t) =Account_R eceivables(t - dt) +(incoming_rate - receiving_rate) * dt
INIT Account_Receivables = 100000
INFLOWS:
incoming_rate =price_per_order*orders_fulfilling
OUTFLOWS:
receiving_rate =Account_Receivables/receiving_lag_time
Fulfilling_Capacity(t) =F ulfilling_Capacity(t- dt) +(capacity_change_rate) * dt
INIT Fulfilling Capacity =5
INFLOWS:
capacity_change_rate =discrepancy/cap_time
Orders_in_Process(t) =Orders_in_Process(t- dt) + (orders_coming- orders_fulfilling) * dt
INIT Orders_in_Process =3
INFLOWS:
orders_coming =
(Sales__Experts*average_order_per_expert_per_month*order_efficiency)/order_adjustment_ti
me
OUTFLOWS:
orders_fulfilling =
min(F ulfilling_Capacity*capacity_usage,Orders_in_Process/order_fulfilling_time)
Percieved_DelDel(t) =Percieved_DelDel(t- dt) +(Adjustment_Flow) * dt
INIT Percieved_DelDel =2
INFLOWS:
Adjustment_Flow =Discrep_BetweenAct&P erc/ATforDelDel
Sales__Experts(t)=Sales__Experts(t- dt) + (hiring - retiring) * dt
INIT Sales__ Experts =2
INFLOWS:
hiring =estimated__retiring+((Personnel_Discrepancy)/sales_hiring__adj_time)
OUTFLOWS:
retiring =Sales__Experts/average_expert_turnover_period
ATforDelDel =6
average_expert_turnover_period =60
average_order_per_expert_per_month =3
capacity_usage =min(1.5,F ulfilling_Capacity/possible_target_delivery_rate)
19
cap_time =1.2
customer_delay=0.25
delivery_delay =Orders_in_Process/orders_fulfilling
discrepancy =possible_target_delivery_rate-Fulfilling_Capacity
Discrep_BetweenAct&P erc =delivery_delayPercieved_DelDel
estimated__retiring =SMTH1(retiring,est_time)
est_time =48
market_value_per_salesmen =5000000
monthly _Interest_rate =0.01
order_adjustment_time =2
order_fulfilling_time =1.25
Personnel_Discrepancy =TARGET__PERSONNEL-Sales__Experts
possible_target_delivery_rate =Orders_in_Process/target_DD
price_per_order =100000
prof =receiving_rate*prof_margin-Account_Receivables*monthly_Interest_rate
prof_margin =0.1
prof_ratio = prof/desired_prof
receiving_lag_time =customer_delay+delivery_delay
sales_hiring__adj_time =1
target_DD =1.25
TARGET__PERSONNEL =
(Total_Market/market_value_per_salesmen)*eff_of_prof_ratio_target_personnel
desired_prof =GRAPH(time)
(0.00, 35000), (12.0, 36250), (24.0, 38250), (36.0, 40000), (48.0, 42500), (60.0, 44750), (72.0,
47000), (84.0, 48250), (96.0, 49250), (108, 49750), (120, 50000)
eff_of_prof_ratio_target_personnel =GRAPH(prof_ratio)
(-1.00, 0.5), (-0.75, 0.55), (-0.5, 0.65), (-0.25, 0.72), (0.00, 0.00), (0.25, 1.10), (0.5, 1.27), (0.75,
1.41), (1.00, 1.49), (1.25, 1.53), (1.50, 1.56), (1.75, 1.56), (2.00, 1.56)
order_efficiency =GRAPH(Percieved_DelDel)
(0.00, 1.60), (0.333, 1.44), (0.667, 1.27), (1.00, 1.00), (1.33, 0.68), (1.67, 0.47), (2.00, 0.33),
(2.33, 0.23), (2.67, 0.17), (3.00, 0.14)
Total_Market =GRAPH(time)
(0.00, 1.9e+007), (12.0, 1.5e+007), (24.0, 1.4e+007), (36.0, 1.6e+007), (48.0, 1.8e+007), (60.0,
2e+007), (72.0, 2.1e+007), (84.0, 2.2e+007), (96.0, 2.3e+007), (108, 2.4e+007), (120,
2.4e+007)
Back to the
20