Kim, Amy with Vahid Faghihi, Amir R. Hessami and David Ford, "Designing Perpetual Sustainability Improvement Programs for Built Infrastructures", 2012 July 22-2012 July 26

Online content

Fullscreen
Designing Perpetual Sustainability Improvement Programs
for Built Infrastructures

Amy Kim, LEED AP (BD+C)!
Amir Hessami~
Vahid Faghihi?
David Ford, Ph.D., P.E., LEED GA*

Abstract

The impacts on energy generation and use on sustainability, increasing energy demand, and
declining natural resources have made energy improvements a top priority for many
organizations. But adequate financing for sustainability improvement projects for built
infrastructures is not available. The Paid-From-Savings approach can leverage savings to pay for
energy improvements. Although well established and adopted by many organizations, an
incomplete understanding of the dynamics of these revolving fund programs hinders their
effective and efficient use. In the current work the Harvard Green Campus Initiative and a Texas
A&M University sustainability improvement programs were used to develop a dynamic model of
a revolving sustainability fund. The validated model is used to test the effectiveness of three
project planning strategies and two financing alternatives. Results indicate that with adequate
funding it was most advantageous to proceed with all projects as quickly as possible and that
with insufficient initial funding the best strategy depended upon the program objectives (e.g.
earliest completion, largest fund, minimum negative fund balance). Contributions to
sustainability and system dynamics modeling and future research opportunities are discussed.

Keywords: Sustainability, Financing, Project Scheduling, System Dynamics, University Fund

Introduction

Limited resources and increasing human activities that damage the environmental, social, and
economic well-being of societies require the development of sustainable infrastructures and
practices. The undesirable impacts of the exploration, production, and use of fossil fuels make
energy conservation a major component of improving sustainability. Built infrastructure is
critical to energy sustainability improvements. In 2008, the building sector (e.g. single and multi-
family residential buildings and commercial buildings) consumed 40% of primary energy and

+ Ph.D. Candidate, Zachry Department of Civil Engineering, Texas A&M University. ahimkim@tamu.edu

> Ph.D. Candidate, Zachry Department of Civil Engineering, Texas A&M University. hessami_amir@tamu.edu

3 Ph.D. Candidate, Zachry Department of Civil Engineering, Texas A&M University. savafa@tamu.edu

* Associate Professor and Urban/Beaver Development Professor, Zachry Department of Civil Engineering, Texas
A&M University. DavidFord@tamu.edu
nearly 70 percent of all U.S. electricity consumption and was responsible for 40 percent of total
U.S. greenhouse gas emissions (Chapter!. Building Sector; Hendricks, Goldstein, Detchon, &
Shickman, 2009). Consequently, reducing energy consumption in built infrastructure can provide
both operational savings for the owners and improve the environment by improving air and water
quality. The current work investigates an innovative approach to improving the sustainability of
buildings and other built infrastructures.

Many new building construction projects are incorporating improved sustainability features.
Programs such as the Leadership in Energy and Environmental Design (LEED) in the United
States (An Introduction to LEED, 2011) have established standards for such work. However,
improving the sustainability of infrastructures built prior to such standardizations is also critical
to improved overall sustainability efforts. This is due to the long lifespan of most built
infrastructures which creates a stock of existing buildings that far exceeds the rate of new
construction. According to Department of Energy’s Annual Energy Outlook, only about 2
percent of new floor space is added to the commercial building stock each year (Energy
Information Administration, 2010). This results in large negative environmental impacts, such as
the production of 35% of the carbon emissions in the North America (Cascadia Region Green
Building Council, 2011). Improved energy use in existing buildings can drastically reduce the
negative impacts on the environment and occupants. As will be shown, some sustainability
improvements can also improve the economic viability of the facilities.

However, improving the energy efficiency and therefore sustainability of existing built
infrastructure is difficult. For example, owners and tenants of rented building spaces may not
share incentives to improve the facility if the tenants are directly responsible for utility costs.
Decision makers may be unaware of the quantifiable benefits and opportunities from improved
building energy systems. Funds for improvements may be, or appear to be, unavailable or
payback periods too long compared to other uses of limited funds (BASF The Chemical
Company, 2009). The financial barriers are particularly challenging and the focus of the current
work.

Public agency policies have been used to address the financial challenges of improving the
sustainability of existing built infrastructure, including energy performance. At the federal level
the National Energy Policy Act of 2005 and Emergency Economic Stabilization Act of 2008, and
the American Recovery Reinvestment Act of 2009 have had major impacts on green building.
These policies provided tax incentives or grants for constructing new facilities that exceed the
current energy standard or for renovating existing facilities that exceed the ASHRAE 90.1
standard (Tax Incentives Assistance Project, 2012).

However, despite the general information and recommendations available in the literature, the
operational design, funding, and management of projects sustainability improvement projects for
built infrastructure remain unclear. The current work investigates the features of paid-from-
savings concept by using systems dynamic. The concept is illustrated through a case study
project. The next section describes the specific problem that is investigated. This is followed by a
brief description of the research methodology and then a description of the case study and how
data was collected. A description of the model structure is followed by validation and calibration
information. We then describe how the model was used to investigate the two research questions
and the results. Finally, conclusions are drawn concerning the contributions of the work and
potential future work.

Problem Description

Project planning and financing are two critical aspects of sustainability improvement projects.
Project planning includes flexibility and creative thinking. For example, one of challenges of
energy retrofit projects is the phasing of the project around existing equipment locations,
occupants and hours of operations. A recent energy improvement project for a federal courthouse
required relocating occupants to reduce disrupting the facility activities. Due to the sensitivity of
the documents in the facility work could only proceed in the evening from 6pm to 4am. This
affected the labor cost and required detailed planning prior to engaging in the improvement
activities (Kumar, 2011).

Project financing is a second critical aspect of sustainability improvement projects for existing
infrastructure. Financial metrics are a common standard for evaluating project performance.
Organizations typically assess projects based on net present value and benefit cost ratios.
Different project financing structures can create different returns on investment. Given that most
owner lack the full amount of investment capital to self-invest in the energy improvement
projects, project planners and managers are faced with tough decisions when evaluating
alternative financing methods. Several financing structures are available. For example, the US
Department of Energy has partnered with Rebuild America to encourage energy efficiency
enhancement in built infrastructures. A publication by Rebuild America, “The Energy Smart
Guide to Campus Cost Savings” helps organizations achieve energy savings goals by identifying
energy savings opportunities, possible solutions and by suggesting various methods of financing
(National Renewable Energy Laboratory (NREL), 2003). The guide proposes several options for
financing energy improvement projects including internal financing, debt financing, tax-exempt
lease, energy performance contracting. Table 1 summarizes these financing options.
Table 1- Financing Options for Energy Projects (U.S. Environmental Protection Agency, 2010)

Internal Funds

Debts (Bonds)

Tax-Exempt Leases

Energy Performance
Contracts

Interest If applicable, flexible
and left to the discretion

IMA of the institution

Financing If applicable, flexible
and left to the

Term discretion of the
institution

Other Costs = N/A

Approval Internal

Process

Approval Current bud-get period

Time

Varies by institution

Lowest tax-exempt rate

May be 20 years or more

Underwriting, egal
opinion, insurance, ete.

May have to be approved
by voters via
referendum

May be lengthy ~ process
may take over a year

Very difficult to go above

Low tax-exempt rate

Up to 10 years is common and
up to 12-15 years is possible for
large pr

None
Internal approvals needed
Simple attorney __ letter
required

Generally within one week

Can set up a master lease, which

Can be taxable or tax-exempt

Typically up to 10 years, but
may be as long as 15 years

May have to pay engineering
costs if contract not executed

RFP — usually required;
internal approvals needed

Generally within 1-2 weeks
once the award is made.

Relatively flexible. An

the dollar allows you to draw down funds — underlying municipal lease is
ceiling as needed often used
Budget Used Either Capital Operating Operating
Greatest Direct access Low interest rate because Allows you to buy capital Provides performance
Benefit if included init is a general obligation equipment using operating guarantees that help approval
budget of the public entity dollars proces
Greatest Never seems to be Very time consuming and Identifying the project to Identifying the project to be
Hurdle enough money available energy project not always __be financed financed, selecting the
for projects a priority energy service provider

Many types of sustainability improvement to existing built infrastructure can generate cost
savings. This is particularly true of energy conservation projects. Private industry has used this
benefit to respond to the need for financing sustainability improvement projects. For example,
engaging in a Energy Performance Contract (EPC) with Energy Service Companies (ESCOs)
reduce the need for upfront capital by owners and provide the cost and expertise needed to
efficiently manage energy performance improvements. ESCOs are large energy service providers
with the capability to audit, design, install, manage and arrange the financing for the project.
Energy performance contract (EPC) projects may be financed by ESCOs or third-party financial
institutions. When ESCOs arrange the financing the savings are usually shared between the host
facilities and the ESCO. ESPCs allow Federal agencies to accomplish energy savings projects
without up-front capital costs and without special Congressional appropriations. In FY2006, the
total investment in Energy Savings Performance Contracts by various federal agencies (including
the DOE Super-ESPC program, Army, Navy, and Air Force) was $321 million (ICF
International, 2007). Although this model has been around since the early 1970s, it wasn’t until
the mid-1980s that companies began to recognize the realized savings from these endeavors.
There are many types of third-party financing options that are available (tax-exempt lease
purchase, state or local government leasing, state or local government bonds, revolving loan,
power purchase agreement).

A revolving loan is a type of third-party financing vehicle that is available and is the focus of this
study. A revolving loan fund is a loan established for a specific purpose in which interest and
principal payments are used to issue new loans with the same purpose (Barlow & Putman, 2009).
Revolving fund strategies for financing sustainability improvements are sometimes called Paid-
From-Savings strategies because the reduced costs of the (successful) improvements are used to
pay back the load and fund future improvements. Typically, when the host facility obtains the
loan from a third-party, the ESCOs guarantee a minimum energy cost savings. If at any time
during the contract the verified energy cost savings produced by facilities improvements are less
than the guaranteed amount, the ESCO is required to pay the difference.

Several universities use revolving funds in combination with energy performance contracts
(ESPC) to leverage savings to pay for energy improvements in existing buildings. If designed
properly and operated efficiently revolving funds can create perpetual, self-funding,
sustainability improvement programs. As an example, 32 institutions including Harvard,
Stanford, Arizona State universities are committed to invest $65 million in green revolving funds
through a program called $1 Billion Green Challenge (Billion Dollar Green Challenge).
However, due to their relatively large initial capital investments and intensity of resources to
manage projects, revolving loan fund may not be a feasible solution for all campuses.

The dynamic aspects of revolving fund sustainability programs can determine their success or
failure. Meeting financial obligations and providing adequate funds for future projects require
careful planning of cash flows and investments, as well as predictions of cost savings, from
sustainability improvement. Expensive sustainability improvement projects or those with low
Benefit-Cost ratios may severely limit improvements. Inadequate total savings can greatly delay
future improvements and threaten repaying initial funding sources. The misallocation of savings
among stakeholders or aggressive loan repayment requirements can have similar effects.

Despite the availability of general guidance and success stories, planners of revolving fund
sustainability programs have little program planning advice as it relates to the sustainability fund.
The guidelines published by USGBC and Rebuild America do not provide a transparent structure
that allows quantitatively comparing programmatic design alternatives. Therefore, to improve the
understanding of revolving fund sustainability programs, this study seeks to answer the
following questions:

e What is the impact of project scheduling on the performance of sustainability fund?
e What is the impact of financing structure on the performance of sustainability fund?

Both of these questions will help decision makers to develop improved sustainability programs
for existing infrastructure.
Methodology

Systems dynamics was used to model a sustainability fund and the planning of its associated
sustainability improvement projects. In particular, this research focused on how the performance
of a sustainability fund evolved in response to different management strategies and under
different financing structures. In the past, system dynamics has been successfully applied to a
variety of project management issues, including failures in project fast track implementation
(Ford & Sterman, 1998) poor schedule performance (Abdel-Hamid, 1988) and the impacts of
changes (Rodrigues & Williams, 1997; Cooper, 1980) and concealing rework requirements (Ford
& Sterman, 2003)on project performance. System dynamics has also been applied to various
financial issues. Therefore, the method can be useful for the current investigation.

The traditional system dynamics modeling method was applied (Sterman, 2000). This study
focused on impacts of project scheduling and financing structure on project performance, where
performance was measured by the size of the sustainability fund. To address project scheduling
three different project sequencing scenarios were investigated. These scenarios prioritized
projects based on the amount of saving, benefit-cost ratio and the size of the projects. Project
financing was investigated to determine the impact of the initial investment in the sustainability
funds on program performance.

The Case Study Sustainability Improvement Program

Facility Improvements

The model was partially formulated and calibrated with data used from an energy conservation
project which Texas A&M University implemented in the beginning of 2011. The overall
improvement effort consisted of two loans (aka two phases); one for $10 million to upgrade 17
existing facilities and second for $5.1 million to upgrade seven additional facilities. This study
investigated the 17 facilities that were part of the Phase I improvements. The case study program
included improving five parking garages and 13 teaching and research facilities. The TAMU
Utilities Energy Management department (UEM) led the effort, which primarily improved the
HVAC and building automation systems and increased lighting efficiencies across campus. The
improvement work began and was completed within the calendar year 2011.

The project included improving over 4 million square feet of space. Parking garages had the
largest areas ranging from 200,000 square feet to approximately 1 million square feet. The 13
teaching and research facilities were much smaller, generally less than 200,000 square feet. The
majority of work included building-automation system (BAS) upgrades and parking garage
lighting retrofit. BAS optimization includes better control of HVAC equipment in buildings. For
example, occupancy sensors were installed and tied to equipment controllers to minimize air
flow during unoccupied periods. Installation of occupancy sensors allowed eliminating
conditioning and lighting spaces when unoccupied. Building reset and setback schedules were
implemented to further reduce unnecessary energy consumption. Building setback schedules
refers to setting appropriate temperature set points for heating and cooling during different times
(daytime/nighttime) based on occupancy (occupied/unoccupied) to maximize occupant comfort
while minimizing heating and cooling energy costs. Lighting retrofits included replacing
inefficient lamps with high efficient, energy saving lamps. Parking garage improvement included
lighting retrofits, whereas the 13 teaching and research facilities had a combination of various
improvements. For the 13 teaching and research facilities; the most improvements tied
occupancy sensors or shut the heating, ventilation, and air conditioning (HVAC) off during
unoccupied periods. The second most practiced improvement was resetting the supply static
pressure for variable air volume (VAV) system and providing or converting air handling units
(AHUs), exhaust fans and zones to direct digital controls.

Funding for the project was provided by Texas State Energy Conservation Office (SECO) under
the federal American Recovery and Reinvestment Act (State Energy Conservation Office, 2010)
to Texas A&M University (TAMU) at 2% annual interest rate. Texas A&M University engaged
in a guarantee performance contract with Siemens, a large energy service company (ESCO), to
carry out the work (SiemensIndustryUS, 2011). The term of the Contract was 10 years. The
guaranteed savings included an aggregate verified savings for the 17 facilities each year over the
entire term of the Contract

Baseline consumption was measured with data from complete building energy use records for
2009. This baseline consumption was the reference for comparing the actual consumption during
the Performance Guarantee Period to determine the Actual Realized Savings. Three types of
commodities were identified to determine the total utility consumptions; electricity, chilled
water, and heating hot water. Electricity was measured in kilowatt hour (kWh). Chilled water
and heating hot water were measured in Million British Thermal Unit (MMBTU). Total annual
baseline consumption was determined by converting the kWh’s to MMBTU’s an =
0.0034¥M BTV),

The predicted annual savings were obtained from the Utility Assessment Report that was
prepared by Siemens for TAMU. The report summarized the annual savings for each individual
building. Parking garages were predicted to have the most savings ranging from almost 30% to
as much as 50% in savings. Twelve of the thirteen research facilities were predicted to have an
annual saving between 10-30% from the baseline consumption. The Zachry Engineering Center
had the lowest predicted annual savings of 5%. The total predicted cost savings per year was
estimated to be $1,126,099. Of the total predicted savings, total utility savings was $1,080,604
and operational savings was $45,495. > The total guaranteed savings for ten years was
$1,126,099 ($1,080,640 energy and $45,495 operations) per year. This table was also used to
verify if the assumptions for the yearly loan payment were reasonable. The guaranteed savings

° Predicted operational savings was estimated at 4.21% of the predicted utility savings
was more than the (modeler estimated) calculated yearly payment of $1,114,859.84. Including
the $20,000 of measurement and verification cost the total expense equaled $1,134,859.84.

Model Structure

Conceptual Model

Harvard University is a good example of an academic institution that utilized the paid-from-
savings concept. Harvard created a Green Campus Loan Fund (GCLF) (Like, 2009). GCLF at
Harvard alleviates the need to find up-front capital costs for projects that result in improving the
environment. The conceptual model structure for the current work is similar to the existing paid-
from-savings program at Harvard. A recent publication by Harvard University titled “Green
Campuses: The Road from Little Victories to Systemic Transformation”, reported on the
progress the University has made in energy improvements around the campus. A diagram in this
report is a suitable representation of a conceptual model of the paid-from-savings philosophy as
presented by USGBC (Figure 1).

% Savings absorbed into
related Schools budgets

Building School &
Resources invested to develop Department

and expand Faculty Engagement foxiatnedk & : Research,
and capabilities for innovation Paricipation Harvard Auditing,
Green Information

Campin Systems,
Real Evaluation

Initiative & Trial

Savings Generated from Strategic Planning,

Reduced Operating Costs Program
Development and

Expansion

Conservation
Projects Funded

Build School Based Management Support, Local Participation Expertise & Information

Figure 1- The Harvard Green Campus Initiative (Sharp, 2002)

The conceptual model is based on the Harvard University sustainability program. As seen in
Figure 2, external funds accumulate slowly in the sustainability fund. When it reaches the
required amount to improve a building, the building is improved, decreasing the remaining funds
available for improvements. The resulting reduction in energy usage creates income to the fund.
These interactions create the reinforcing feedback loop that sustains and eventually grows the
Sustainability Fund. The drivers and constants on this loop determine the monetary success of
the Fund. Collecting those incomes from energy reduction and transferring it to the sustainability
saving also provide funds to repay external funders or other stakeholders.

Formal Model Structure

The conceptual model was expanded to reflect the sustainability improvement program for
seventeen different Texas A&M University campus buildings with diverse characteristics (e.g.
energy usage, improvement cost and so on) as shown in Figure 2. The model was created in
Vensim® DSS software and uses arraying function to handle several buildings and improvement
data recorded in a Microsoft® Excel file.

The three primary stocks are the Sustainability Fund, Investment, and Savings. In the initial stage
the only input to the Sustainability Fund stock is the external fund. With the flow of external
fund, the funds start to grow and accumulate in the Sustainability Fund stock. When the
Sustainability Fund stock reaches adequate funding to improve the first project on the list, the
funds are taken out of the Sustainability Fund stock and expended to improve the first project.
The same step is repeated until all of the projects on the list are completed. The model uses the
project start dates to trigger improvements of each building. By implementing the improvements
the amount of energy buildings consume decreases. This decrease in consumption generates cost
savings. Ultimately, these cost savings transfer back into the Sustainability Fund account. The
savings and external fund provide funding to the Sustainability Fund for future projects until all
buildings are improved.

After all improvements are implemented, energy usage is reduced by a certain percentage from
the reference case. This percentage varies based on improvement type. The difference in energy
usage between before and after the improvement is the energy savings generated by
implementing the improvements to the buildings.
ns Current Bldg Energy -—t

Bldg Basecase Energy

Usage Intensity fo
“May

Energy Usage
Reduction for Bldg

Bldg Energy
Savings for Each

Type ‘a a

Usage

'
7 Improved Bldg Energy

Usage

Bldg Energy
Savings

Bldg Energy Cost
S$ FP savings (Blig Fund)

1) Sust. Savings
from Bldg

Co!

F Improving

Big

Payback
Deductioi

> Loa Payback

df Discount
Rate

Current Cost to Improve

Big
+ Base Case Saving
Spending to at Month 200
Improve Bldg

(@) Percentage Difference

with Base Case

O&M Costs i
Sustainability
a @ Cas

Th.

Cree

)

Incoming Funds

Figure 2- Formal Model Structure
Loop Descriptions

R1: When “Spending to improve Bldg” allows a building to get improved, the money moves out
from the “Sustainability Fund” into “Invested in Bldg” indicating that building got improved.
The “Current Bldg Energy Usage” is reduced after the building is improved, which directly
results in increasing “Energy Usage Reduction for Bldg”. The increase in energy usage reduction
causes “Bldg Energy Savings” to increase for each type of energy and also the total “Bldg
Energy Savings” for all the energy usages. These savings result in more “Bldg Energy Cost
Savings (Bldg Fund)” and finally more savings in the original “Sustainability Fund”. This creates
feedback loop R1.

Bl: The “Bldg Energy Cost Savings (Bldg Fund)” along with the “Owner vs. Sust. Savings
ratio” will calculate the value for “Sust. Savings from Bldg” which is the amount of money
needed to be taken out from “Bldg Energy Cost Savings (Bldg Fund)” and put in to
“Sustainability Fund”.

B2: If there is sufficient amount of budget available in “Sustainability Fund”, then “Spending to
Improve Bldg” will deduct that much from the “Sustainability Fund”.

B3: Similar to B2, when there is enough available money in “Sustainability Fund”, “Loan
Payback” will take that much out from it and payback the loan.

Significant specific data was available about the structure of the TAMU case study. Therefore
these structures were also incorporated into the formal model, including loan repayment, baseline
energy use levels, predicted energy and cost savings, utility rates assumed for contracting, and
guaranteed savings. This allowed improved model calibration and validation.

Data Collection and Calibration

Data about the case study was collected from TAMU utility records for individual buildings, the
TAMU / Siemens contract, the project’s Utility Assessment Report, and meetings with
representatives of the owner, ESCO, and improvement contractors. Descriptions of important
specific data sources and their uses in the formal model are available from the authors.

Model Validation

Structure Assessment

The model structure closely resembles the Harvard Green Campus Initiative Environmental Loan
fund structure and is consistent with the case study information. The Harvard Green Campus
Initiative Environmental Loan Fund provides the necessary capital to invest (Conservation
Projects Funded) in various aspects of reducing energy cost by not only reducing energy
consumption in buildings through better operation and maintenance practice but also in
transportation and purchasing (Savings Generated from Reduced Operating Costs). The savings
generated from implementing the energy conservation projects (Savings Generated from
Reduced Operating Costs) were then applied to three different areas. Part of the savings was
designed to repay the loan (Loan Repaid) and another portion to initiate Harvard’s Green
Campus Initiative (Resources invested to develop and expand Faculty Engagement and
capability for innovation) and finally some share was absorbed into the school budget for other
sustainability related purposes (% Savings absorbed into Related School budgets).

In the case study model, the Sustainability Fund represented the account that is used to provide
the necessary capital for energy improvements around campus. Texas A&M University received
$10 million in an account to improve campus facilities around campus by contracting with
SECO. This account was defined as the Sustainability Fund. At Harvard University this was
defined as Harvard Green Campus Initiative Environmental Loan Fund. In contrast to Harvard
University, the research intent was to model the effect of reducing energy consumption in built
infrastructure and not necessarily in transportation and purchasing. Hence, the funds were
designed to invest in built infrastructure and no other areas.° The funds were expended to reduce
energy consumption in multiple buildings on Texas A&M University campus. The flow of this
fund was defined as Spending to Improve Buildings. At Harvard University it was defined as
Conservation Projects Funded.

As energy projects were fulfilled, the cost of servicing the building altered. By applying the
estimated reduction in energy consumption, appropriate utility rate, and the projected reduction
in operating and maintenance cost the model represented the adjustment in cost by Building
Energy Cost Savings. Harvard University called this Savings Generated from Reduced Operating
Costs.

With the savings, Harvard University repaid the loan (Loan Repaid), supported other green
campus initiatives and shared the savings with the school. The savings generated by
implementing the projects was primarily collected back in the Sustainability Fund for the
purpose of repaying the loan.

The model structure extends and deviates from the structure of Harvard University’s program to
better represent the TAMU project. Specifically, the Harvard diagram (Figure 1) does not depict
the initial funding source for the Harvard Green Campus Initiative Environmental Loan Fund.
Based on the Contract with SECO and Energy Service Company (ESCO), the case study model
represented an external funding source by adding a flow defined as Incoming Funds. Other
Universities such as Whitman College and Macalester College received a portion of their
sustainability funding from surplus budget and student government. As in the case study
circumstances, 100% of the funding came from SECO resulting in adding external funding
source as a necessary element of the model.

$similar concepts were found in Macalester College which created a Clean Energy Revolving Fund.
Table 2- Model Structure Assessment

Model Component External Support Case Study Data

Macalester College (MN) — Clean Energy Sustainability Funds
Revolving Fund

Harvard University (MA) — Green Campus
Initiative Environmental Loan Fund

Generated Savings Harvard University’s, (MA) — Savings Building Energy — Cost.
Generated from Reduced Operating Costs Savings

Payback Harvard University’s (MA) —Loan Repaid Payback

* Extension from the Harvard’s Green Campus Initiative model
**Deviation from the Harvard’s Green Campus Initiative model

Some sustainability funds are designed to share savings. However, repaying the initial loan was
the primary purpose of the TAMU project. This is reflected in the TAMU / Siemens contract,
which does not include shared savings. Therefore, the base case model, which was built to
represent the contract conditions, does not include shared savings.’ This simplification also
expedites the repayment of the loan.

“If shared savings are included in the base case model the Sustainability Fund temporarily has negative values,
implying that the fund would have to borrow additional funds to make loan payments.
Typical Behavior Mode

Sustainability Fund

10M

15M

0 20 40 60 80 100120140 160180200
Time (Month)
Sustainability Fund : Model AVA_BaseCase

Figure 3- Model Behavior, Sustainability Fund

Figure 3 shows that at month one, a lump sum of $10M is received from an external source
raising the capital in the sustainability fund to $10M in total. Then, considering the actual start
dates for the projects, the first set of projects get improved at month six followed by rest of the
buildings on the list. Due to contract requirement, within one year, all of the buildings
improvements are completed therefore the entire budget ($10M) spent. The balance in the
sustainability fund never reaches zero at month twelve since there are energy usage reductions
(savings) immediately following the building improvements which starts from month seven.
After month twelve, savings start to accumulate in the sustainability fund from all the building
improvements. On the first guaranteed date, 12 months after the last improvement and 24 months
after the project initiates, loan payments are deducted on a yearly basis (i.e. month 24, 36, etc.).
After last payment, the savings would continue to grow in the sustainability fund.

Behavior Validation

The model was initially calibrated to reflect the TAMU / Siemens contract to check the validity
of the model. Although utility rates are expected to rise over time and projects are traditionally
assessed based on monetary values at a single point in time by discounting cash flows, neither
were included in the contract conditions. Therefore, the initial calibration of the base case model
did not include these factors. The simulated behavior of the Sustainability Fund (Figure 4, lower,
blue line) reflects reasonable behavior. In the first month the receipt of the entire loan principal
increases the sustainability fund and the available budget in this fund rose to $10M. Then, using
the actual project start dates, the projects began in month six and improvements at all seventeen
buildings had been started within the next five months. As required by the contract, all the
buildings improvements are finished by at month eleven, emptying the sustainability fund. The
fund actually did not go to zero since there are some energy usage reductions due to the
completion of some improvements before the improvement deadline, causing some savings to
flow into the sustainability fund. After month eleven savings are collected in the fund from all
the buildings and the loan payments are paid out yearly (i.e. month 24, 36, etc.) (Trevin &
SECO, 2011; U.S. Department of Energy Office of Energy Efficiency and Renewable Energy
State Energy Program, 2009). This constant accumulation of savings and periodic loan payments
create the “saw tooth” pattern in the fund balance. After the last loan payment (month 132)
savings steadily increase in the sustainability fund.

Sustainability Fund

10M

15M

25M

0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150

Time (Month)
Sustainability Fund : Model AVA_Calibrated
Sustainability Fund : Model AVA_BaseCase

Figure 4- Sustainability Fund, comparing base case and calibrated model

Texas A&M University generates a significant portion of its own power and therefore can
control the utility costs charged to its facilities better than if market utility prices were paid.
However, given that market utility rates do fluctuate, and that TAMU does purchase some
utilities from market sources, and sustainability fund projects for other owners may depend on
market-priced utilities, the calibrated base case model was re-calibrated assuming increasing
utility costs. The resulting behavior was used for model validation. The sustainability program
should generate more savings with increasing utility prices than constant ones and therefore the
fund balance should grow faster. Figure 4 (upper red line) shows the fund balance for this
hypothetical and reasonable case and suggests that the model creates reasonable behavior for the
same reasons as in the actual system.
Extreme conditions’ testing was also performed to validate the model’s ability to generate
reasonable behavior over a wide range of exogenous values. These tests support the usefulness of
the model. Based on the structure and behavior tests described above the model is considered to
be adequate for the investigation of the impacts of project planning and financing on revolving
sustainability funds.

Model Use

To test project planning policies and financial structures the model was calibrated with
the realistic conditions of increased utility (2%/year) and construction prices (5%/year) and
values measured in constant dollars (Figure 4 upper red line). This version of the model is
hereafter referred to as the base case. The sustainability fund was allowed to go negative as long
as it becomes positive again in less than a year. To cover the expenses when the account goes
negative, it was assumed that the program borrows money from other sources within the
university, by paying an extra 2% administration fee. Performance was measured with the fund
balance at month 200 (after loan repayment) and compared to the base case.

Three prioritization policies were identified to address the issue of project planning for
sustainability fund management.

e Decreasing order of total savings: buildings are improved based on the amount of
predicted savings. The building with most amount of predicted saving would be started
first. Then the building with second highest amount of predicted saving and so on until
the improvement funds have been exhausted.

e Decreasing Benefit-Cost ratio: Buildings are ordered based on the ratio of the savings
they are generating to their cost of improvement (B-C ratio). First the building with
highest B-C ratio would be improved and then the one with second highest B-C ratio, etc.
until the improvement funds have been exhausted. This is a more traditional method of
prioritizing projects in this type of investment. Benefit-Cost ratio is particularly
applicable in private sector with limited funds, where the program managers want to gain
the largest possible savings for the limited amount of capital.

e Increasing cost of improvement: buildings are improved based on their improvement
cost in a way that the one with smallest cost is improved first, etc. until improvement
funds are exhausted. The motivation for project managers to choose this scenario could
be to show progress by reporting the largest number of buildings improved in a reporting
period. Another possibility may be fairness in improving multiple buildings for multiple
stakeholders. As an example, several academic divisions and supporting offices co-exist
in university settings. The program manager may be obligated to equally satisfy the
various divisions and department heads by improving in smaller projects but more
frequently.
Each of the three scenarios were simulated under two finance conditions; 1) the required budget
($10 million) is available at the beginning of the program, and 2) Half of the required budget ($5
million) is available at the beginning of the program. Both financing scenarios can complete all
of the planned improvements even though they utilize different initial loans because the program
generates savings that, in the case of the lower initial loan, can be used to fund the remaining
projects. Like the full fund scenarios, the loan with less initial funding ($5 million) would be
repaid in 10 equal yearly loan payments starting on the guaranteed date (24 months after the
project initiates). These yearly loan payments equaled $577,495. To fulfill the loan obligation,
the sustainability fund could temporarily go negative and borrow money in order to pay back the
loan. In such circumstances, the necessary funding would be borrowed from an external source at
a 2% interest rate.

Simulation Results

Fully Funded ($10 Million) Case

The $10 Million case represented adequate funding to proceed with improving all of the
buildings in the first year. When buildings are improved based on the decreasing order of
benefit-cost ratio the Sustainability Fund at month 200 held $10,083,389 (3.548% over base
case). By prioritizing based on the amount of savings, buildings were all improved within the
first year and the Sustainability Fund at the end of month 200 held $10,129,838 (4.025% over
base case). When buildings were improved based on the increasing order of their construction
costs the amount of savings at the end of month 200 is $9,847,845 (1.130% over the base case).
Figure 5 shows the graphs of three cases comparing to the basecase.

The sequence of the projects impacts the performance of the sustainability fund. All of the
scenarios showed an increase of 1-4% on savings in the sustainability fund at month 200
compared to the base case. When 100% of the upfront capital available, it was most beneficial to
proceed with the projects that had the largest predicted savings regardless of the project cost
followed by largest benefit-cost ratio and then smallest projects (in terms of cost).

Given that the program may not necessarily have all of the funding available and the project list
can grow, the next set of analysis included studying the impact of project scheduling with budget
constraints.

Table 3- Results of Fully Funded Scenario Tests

Base Case Benefit- Amount of Improvement Cost
Cost Ratio Savings
Sustainability Fund 9,737,849 10,083,389 10,129,838 9,847,845
(8)
Improvement 0.000% 3.548% 4.025% 1.130%

Compare to the base
case

Graph for Sustainability Fund

11M

8.25M

2.75M

0 20 40 60 80 100-120-140 160180200
Time (Month)

Sustainability Fund : SmallestBuildingF rst
Sustainability Fund : BiggestSavingF rst
Sustainability Fund : BiggestBCFirst
Sustainability Fund : BaseCase

Figure 5- Sustainability Fund for Different Scenarios (Full Fund)

Limited Fund ($5 Million) Case

The $5 Million case represented circumstances in which inadequate funding was available to
proceed with improving all of the buildings in the first year. Buildings were assumed to be
eligible for improvements only when adequate funding was available (i.e. addition loans would
not be used to accelerate improvements). Therefore some improvements are delayed until
savings accumulate (see Figure 6. Notice the change in vertical scale from Figure 5.).
Improvement costs increase during the delays. A historical cost index from a widely used
industry source of construction data (RS Means, 2010) was used to estimate cost increases.
Sustainability Fund

6M

435M

1.05M.

-600,000

0 2040 60 80 100-120, 140160180200
Time (Month)

Sustainability Fund : Model_
Sustainability Fund : Model
Sustainability Fund : Model_/

smalles tBuildingFirst_SM
SavingFirst_SM
sstBCFirst_SM

AB
A_Bi
Figure 6- Sustainability Fund for Different Scenarios (Half Fund)

When improvements were prioritized based on decreasing predicted savings, 6 out of 17
buildings were improved within the first year. In this case, the next building improved after 11
months. It took a total of 156 months to improve all of the buildings. The sustainability fund had
a negative balance eight times. The total duration of the negative balance was for 28 months. The
largest negative balance was at month 49 for -$416,035. The net amount in sustainability fund at
the end of month 200 for this scenario was $5,487,030.

When improvements were prioritized based on decreasing benefit cost ratio, 8 out of 17
buildings were improved within the first year. The next building improved after 10 months. It
took a total of 153 months to improve all of the buildings. The sustainability fund had a negative
balance four times. The total duration of the negative balance was for 14 months. The largest
negative balance was at month 97 for -$308,246.60. The net amount in sustainability fund at the
end of month 200 for this scenario was $5,869,223.50.

When improvements were prioritized based on increasing construction costs, 11 out of 17
buildings were improved within the first year. The next building improved after 2 months and
one building did not get improved within 200 months. The 16" building was improved in month
195. The sustainability fund had a negative balance one time. The total duration of the negative
balance was for 6 months. The largest negative balance was at month 133 for -$424,516.60. The
net amount in sustainability fund at the end of month 200 for this scenario was $548,497.90.

A summary of all of these three cases is shown in Table 4.
Table 4- $5M Case Results Summary

Benefit- Amount of Improvement Cost
Cost Ratio Savings
Sustainability Fund —_$5,869,223.5 $5,487,030 $548,497.9
($) at month 200
Last improved 153 156 Last building didn’t get
building on month improved within 200
months
Largest negative -308,246.6 -416,035 -424,516.6
balance ($)
Total duration on 14 months 28 months 6 months
negative balance
No. of improved 8 6 11
buildings in first
year
No. of times getting 4 8 1
negative

When only half of the required capital was available, it was most advantageous to improve the
buildings that had the highest benefit cost ratio. Simply comparing the sustainability fund
balance at month 200, it indicated that this scenario would lead to the highest savings. However,
this was assuming that it was possible to borrow when the account temporarily goes negative.

Conclusions

Although the base case represented a positive net present value, by testing multiple scenarios this
research was able to conclude that with adequate amount of funding, it was most advantageous to
proceed with all of the projects as quickly as possible. Knowing this, the project manager can
plan ahead before funding is received to stage all of the 17 buildings concurrently. A possible
approach would be to have multiple crews or contractors to work on the project simultaneously
to improve all of the buildings as quickly as possible. If this strategy is not possible, the next best
approach would be to work on the projects that have the highest savings regardless of cost with
projects distributed more over the summer months when the buildings are less occupied. This is
expected since benefits are reaped faster following this sequence and the cost would be irrelevant
as adequate funding is available. Undertaking the largest benefit-cost ratio first followed closely
and led to the third highest savings

Because the interest rate on the loan for the case study was attractive, it was advantageous to
borrow the maximum amount of capital and to improve additional buildings as quickly as
possible. However many sustainability improvement programs may not have this advantage.
With inadequate funding (half that required to complete all buildings) only a few projects were
improved the first year. It was most beneficial to proceed with the projects that had the highest
benefit cost ratio. This scenario had the greatest savings in the sustainability fund at month 200.
As savings accumulated in the sustainability account, three different strategies improved projects
at various time points. To improve the most buildings in the first year the best strategy is
increasing cost, followed by decreasing Benefit-Cost ratio, and then decreasing savings. To
improve all the building earliest the best strategy is decreasing Benefit-Cost ratio, followed by
decreasing savings and then increasing cost. To minimize the negative balance the best strategy
is decreasing benefit-cost ratio, followed by decreasing savings and then increasing cost. To
maximize the size of the fund the best strategy is decreasing Benefit-Cost ratio, followed closely
by decreasing savings, with increasing cost have only about 10% of the final balance at the other
two strategies. This indicates that the best strategy depends on the objectives of the program
managers.

The results are limited by the scope of the modeling and analysis. Wider applicability of results
can be gained by testing the model structure and results with different sustainability
improvement programs. Additional insights can be developed through more model analysis and
developing program planning and financial strategies based on the results of those analyses.
Future work can expand and improve this work by addressing these issues and investigating
additional sustainability improvement program planning and financing issues, such as
differences in stakeholder perspectives and the impacts of loan interest rates on program
performance and strategy. This could include studying whether it was necessary to borrow the
maximum qualified amount of loan and whether it was financially sound to improve all the
projects on the list given different rate structures. This could answer when the project owner
should not invest in improving the buildings and which combination of loan structure would lead
to greater savings in the sustainability fund account. However, the project managers may be
forced to improve all the buildings on the list. In that case, the project manager may be more
interested in the least amount of funding (i.e. seed money) that is required to improve all of the
buildings given different constraints.

The current work contributes to both system dynamics and sustainability. The model expands the
application of system dynamics into a new aspect (program and fund management) of a critical
domain (sustainability). This research illustrated the dynamics of project scheduling and overall
impact on performance of sustainability improvement funds over time with model structures that
can be used to further explore the dynamics of sustainability. One specific example is that this
study provides an insight into the level of impact different project scheduling techniques have on
the performance by comparing them to the base case scenario. The work also expands the
modeling and analysis of sustainability, thereby improving the understanding of why
sustainability programs fail or succeed. On specific example is the insight of how different loan
structures can influence monetary project performance. These contributions are meaningful for
organizations as they are striving to be better stewards of the environment and as they are
constantly faced with limited budget and alternatives to making project management decisions.
Acknowledgements

The authors would like to thank Texas A&M University Utilities and Energy Management group for sharing
valuable information to make this research possible. The authors would also like to thank Michael Brown for
contributing with the literature review and sharing ideas during the team meetings.

References

An Introduction to LEED. (2011). Retrieved March 7, 2012, from Green Building Council:
http://www.usgbc.org/DisplayPage.aspx?CategoryID=19

Abdel-Hamid, T. (1988). Understanding the ‘90% Syndrome’ in SoftwareProject Management: A Simulation-Based
Case Study. J. Syst. Softw., 8, 319-330.

Barlow, B., & Putman, A. (2009). Financing Sustainability on Campus. National Association of College &
University Business Officers.

BASF The Chemical Company. (2009). Improving the Performance of Existing Commercial Buildings: The
Chemistry of Sustainable Retrofits. New Jersey. Retrieved March 2012, from
http://construction.basf.us/index.php?page=about_brochures&type=CPB&select=1919

Cascadia Region Green Building Council. (2011, April 27). Living Future Program & Speakers. Retrieved March 5,
2012, from International Living Future Institute: http://cascadiagbc.org/living-future/11/program

Chapterl. Building Sector. (n.d.). (U.S. Department of Energy, Energy Efficiency & Renewable Energy) Retrieved
March 8, 2011, from Building Energy Data Book: http://buildingsdatabook.eren.doe.gov/ChapterIntrol aspx

Cooper, K. G. (1980). Naval ship production: A claim settled and a framework built. Interfaces, 10(6), 20-36.

Energy Information Administration. (2010). Annual Energy Outlook 2010. Washinton DC: U.S. Energy Information
Administration. Retrieved from www.cia.doe.gov/oiaf/aeo/

Ford, D., & Sterman, J. (1998). Modeling dynamic development processes. Syst. Dyn. Rev., 14(1), 31-68.

Ford, D., & Sterman, J. (2003). The liar’s club: Concealing rework in concurrent development. Concurrent Eng.
Res. Appl., 111(3), 211-219.

Hendricks, B., Goldstein, B., Detchon, R., & Shickman, K. (2009). Rebuilding America: A National Policy
Framework for Investment in Energy Efficiency Retrofits. Center for American Progres and Energy Future Coalitio.
Retrieved from http://www.americanprogress.org/issues/2009/08/rebuilding_america.html

ICF International. (2007). Introduction to Energy Performance Contracting. National Association of Energy Services
Companies. U.S. Environmental Protection Agency ENERGY STAR Buildings. Retrieved from
http://www.energystar.gov/ia/partners/spp_res/Introduction_to_Performance_Contracting.pdf

Kumar, P. (2011, March). Planning for Energy-Efficiency Retrofit Projects. Heating/Piping/Air Conditioning
Engineering, 83(3), p. 10.

Like, R. V. (2009). The Paid-From-Savings-Guide to Green Existing Buildings. Washington: U.S. Green Building
Council, Inc.

National Renewable Energy Laboratory (NREL). (2003). Energy Smart Guide to Campus Cost Savings: Today's
Trends in Project Finance, Clean Fuel Fleets, Combined Heat & Power, Emissions Markets. NREL, Golden, CO.
U.S. Department of Energy. doi: DOE/GO-102003-1754
Rodrigues, A., & Williams, T. M. (1997). System dynamics in project management: assessing the impacts of client
behavior on project performance. J. Oper. Res., 49, 2-15.

RS Means. (2010). Building Construction Cost Data, 2011. Norwell, MA : RSMeans.

Sharp, L. (2002). Green campuses: the road from little victories to systemic transformation. International Journal of
Sustainability in Higher Education, 3(2), 128-145.

SiemensIndustryUS. (2011). Answers for Texas A&M University. Retrieved March 14, 2012, from YouTube:
http://www. youtube.com/watch?v=x1a81x91_rk

State Energy Conservation Office. (2010). Building Efficiency and Retrofit Program Round I: Awarded Projects to
Date. Retrieved March 14, 2012, from State Energy Conservation Office:
http://seco.cpa.state.tx.us/arra/sep/building/ber_awards.php

Sterman, J. D. (2000). Business Dynamics: Systems Thinking and Modeling for a Complex World. McGraw-
Hill/Irwin.

Tax Incentives Assistance Project. (2012, February 13). Tax Incentives Assistance Project . Retrieved March 14,
2012, from Tax Incentives Assistance Project: http://energytaxincentives.org/

Trevin, E., & SECO. (2011). SECO Technical Assistance and Funding Opportunities. State Energy Conservation
Office.

U.S. Department of Energy Office of Energy Efficiency and Renewable Energy State Energy Program. (2009).
Revolving Loan Funds and the State Energy Program. U.S. DOE EERE. Retrieved from
www1.cere.energy.gov/wip/pdfs/sep_rlf.pdf

US. Environmental Protection Agency. (2010, December 02). Why Build Green? Retrieved March 5, 2012, from
EPA: http://www.epa.gov/greenbuilding/pubs/whybuild.htm
14]
16
15

Wow Pw

Bldg # Basecase Energy ## Usage Intensity (per Month)

Building Name Electricity (kwh) Chilled Water (mbtu) | Heating Hot Water (mbtu)
1501 387,235.27 2,466.06 1,080.96
1507 500,455.67 4,920.09 1,614.71
1504 471,902.08 3,244.01 599.55
386 788,560.80 4,673.33 1,086.23
378 135,916.40 = i
388 137,472.30 - -
391 226,791.82 1,234.05 308.14
1559 266,794.43 114.16 13.63
1194 256,243.40 2,771.05 826.63
387 214,077.96 1,823.57 678.83
469 61,027.73 47.96 13.78
379 68,636.53 m =
446 193,615.10 898.13 468.09
392 92,364.84 502.58 125.50
463 83,793.63 515.17 151.44
518 519,977.32 2,237.08 361.87
1508 44,975.63 190.46 15.17

Predicted Improved Bldg # Energy ## Usage (per Month)

Cost of Improving

Electricity (kwh) | Chilled Water (mbtu) | Heating Hot Water (mbtu) Bldg # ($)
344,147.12 1,721.82 633.93 840,996
484,915.89 4,373.89 1,114.10 1,450,094
418,971.17 2,908.27 328.66 954,888
762,173.46 4,050.94 866.12 484,137

73,835.69 7 = 364,616
68,160.60 - - 511,284
207,205.66 987.85 209.19 409,003
158,218.78 114.16 13.63 821,714
232,629.24 2,458.01 645.00 573,227
201,104.27 1,359.97 445.18 690,109
37,229.43 47.96 13.78 205,535
43,406.40 as 250,262
170,945.98 770.91 280.19 718,588
84,068.15 422.49 78.97 362,070
76,860.94 453.60 93.06 355,182
502,355.67 2,155.88 299.00 836,546
44,900.57 154.63 11.07 171,749

Month of Performing
Improvement in Bldg #

Improvement Project
Duration (m)

Total Savings per
Year

Benefit /
Cost

Building
Type

1

12949.77924037

0.015398

Buildings

10105.47660253

0.006969

Buildings

9159.173741943

0.009592

Garages

8447.272683325

0.017448

Garages

4780.215218975

0.01311)

Buildings

5337.001243609

0.010438

Buildings

4172.538901911

0.010202!

Garages

8360.325074864

0.010174}

Buildings

5801.480453252

0.010121

Buildings

6521.048613218

0.009449|

Garages

1832.469706614

0.008916

Buildings

1942.720265978

0.007763

Buildings

4581.012454898

0.006375

Garages

1658.567388901

0.004581

Buildings

of olntN| Nf atalalulul ul a}ow] rm

1558.837613369

0.004389

Buildings

B
o

2558.074802518

0.003058

Buildings

B
=

283.7442437321

0.001652!

Buildings

pPVvVOZSH-ATT-TAMTMONOWDS
CONAN RwWNHE

PPP PRP RRR
NAaOR ONE SO

Bldg # Basecase Energy ## Usage Intensity (per Month)

Building Name Electricity (kwh) Chilled Water (mbtu) | Heating Hot Water (mbtu)
378 109,543.75 : 7
379 55,318.58 m =
388 110,797.75 « =
469 49,186.17 43.17 14.83
1559 215,026.75 102.75 14.67
386 635,551.75 4,206.08 1,169.17
387 172,539.17 1,641.25 730.67
391 182,786.08 1,110.67 331.67
392 74,442.75 452.33 135.08
446 156,046.83 808.33 503.83
463 67,534.67 463.67 163.00
518 419,083.08 2,013.42 389.50
1194 206,523.00 2,494.00 889.75
1501 312,097.75 2,219.50 1,163.50
1504 380,336.17 2,919.67 645.33
1507 403,349.33 4,428.17 1,738.00
1508 36,248.75 171.42 16.33

Predicted Improved Bldg # Energy ## Usage (per Month)

Cost of Improving

Electricity (kwh) | Chilled Water (mbtu) | Heating Hot Water (mbtu) Bldg # ($)
59,508.92 -. - 364,616
34,984.00 8 250,262
54,935.00 = = 511,284
30,005.58 43.17 14.83 205,535
127,518.67 102.75 14.67 821,714
614,284.50 3,645.92 932.25 484,137
162,082.83 1,224.00 479.17 690,109
167,000.33 889.08 225.17 409,003

67,755.92 380.25 85.00 362,070
137,776.33 693.83 301.58 718,588

61,947.17 408.25 100.17 355,182
404,880.67 1,940.33 321.83 836,546
187,490.83 2,212.25 694.25 573,227
277,370.25 1,549.67 682.33 840,996
337,675.75 2,617.50 353.75 954,888
390,824.83 3,936.58 1,199.17 1,450,094

36,188.25 139.17 11.92 171,749

Month of Performing Improvement Project
Improvement in Bldg # Duration (m)

Bldg # Basecase Energy ## Usage Intensity (per Month)

CONAN RwWNHE

PPP PRP RRR
NAaOR ONE SO

Building Name Electricity (kwh) Chilled Water (mbtu) | Heating Hot Water (mbtu)
378 135,916.40 : 7
379 68,636.53 m =
388 137,472.30 « =
469 61,027.73 47.96 13.78
1559 266,794.43, 114.16 13.63
386 788,560.80 4,673.33 1,086.23
387 214,077.96 1,823.57 678.83
391 226,791.82 1,234.05 308.14
392 92,364.84 502.58 125.50
446 193,615.10 898.13 468.09
463 83,793.63 515.17 151.44
518 519,977.32 2,237.08 361.87
1194 256,243.40 2,771.05 826.63
1501 387,235.27 2,466.06 1,080.96
1504 471,902.08 3,244.01 599.55
1507 500,455.67 4,920.09 1,614.71
1508 44,975.63 190.46 15.17

Predicted Improved Bldg # Energy ## Usage (per Month)

Cost of Improving

Electricity (kwh) | Chilled Water (mbtu) | Heating Hot Water (mbtu) Bldg # ($)
73,835.69 -. - 364,616
43,406.40 8 250,262
68,160.60 = = 511,284
37,229.43 47.96 13.78 205,535
158,218.78 114.16 13.63 821,714
762,173.46 4,050.94 866.12 484,137
201,104.27 1,359.97 445.18 690,109
207,205.66 987.85 209.19 409,003

84,068.15 422.49 78.97 362,070
170,945.98 770.91 280.19 718,588

76,860.94 453.60 93.06 355,182
502,355.67 2,155.88 299.00 836,546
232,629.24 2,458.01 645.00 573,227
344,147.12 1,721.82 633.93 840,996
418,971.17 2,908.27 328.66 954,888
484,915.89 4,373.89 1,114.10 1,450,094

44,900.57 154.63 11.07 171,749

Month of Performing Improvement Project
Improvement in Bldg # Duration (m)

Funding Source Name

Funding Amount

Month

Payback ratio

Loan Payback

A

5,000,000

0.111499072

01/01/2011

B

(o)

02/02/2111

12/03/2111

01/03/2112

02/03/2112

12/02/2112

01/02/2113

02/02/2113

12/02/2113

01/02/2114

02/02/2114

12/02/2114

01/02/2115

02/02/2115

12/03/2115

01/03/2116

02/03/2116

12/02/2116

01/02/2117

02/02/2117

12/02/2117

01/02/2118

02/02/2118

12/02/2118

01/02/2119

02/02/2119

12/03/2119

01/03/2120

02/03/2120

12/02/2120

01/02/2121

02/02/2121

12/02/2121

01/02/2122

02/02/2122

09/03/2127

Payback Month |Amount M&V Cost [Payback Month |Amount

0 0} 01/01/2011 (¢) 0|

1 0} 02/02/2111 4 (¢)
11 0| 12/03/2111 11 0|
12 0| 01/03/2112 12 0|
13 0| 02/03/2112 13 0|
23 0| 12/02/2112 23 0|
24| 557,495.36 01/02/2113 24] 20,000.00
25 0| 02/02/2113 25 0|
35 0| 12/02/2113 35 0}
36} 557,495.36 01/02/2114 36] 20,000.00
37 0| 02/02/2114 37 0|
47 0| 12/02/2114} 47 (¢)
48) 557,495.36 01/02/2115 48] 20,000.00
49 0} 02/02/2115 49 0|
59 0| 12/03/2115 59 0|
60} 557,495.36 01/03/2116 60) 20,000.00
61 (0) 02/03/2116 61 (¢)
71 0} 12/02/2116} 71 0|
72) 557,495.36 01/02/2117 72] 20,000.00
73 0| 02/02/2117 73 0|
83 0| 12/02/2117] 83 0|
84] 557,495.36 01/02/2118 84] 20,000.00
85 0| 02/02/2118 85 (¢)
95 0| 12/02/2118 95 0|
96) 557,495.36 01/02/2119 96] 20,000.00
97 0| 02/02/2119 97 0|
107 0| 12/03/2119| 107 0|
108) 557,495.36 01/03/2120 108] 20,000.00
109 0| 02/03/2120 109 0|
119 0| 12/02/2120} 119 0}
120) 557,495.36 01/02/2121 120} 20,000.00
121 0| 02/02/2121 121 0|
134 0| 12/02/2121 134 (¢)
132) 557,495.36 01/02/2122 132) 20,000.00
133 0.00 02/02/2122 133 0.00
200 0.00 09/03/2127 200 0.00

Owner vs. Sust. Savings ratio

(e)

Interest Rate 0.02
Operational (O&M) Savings Ratio 0.0421
Base case Saving at Month 200 9737849
Interest rate for Negative SF 0.00

1/1/2011

Month |Electricity
0| 0.077
1 0.077
2 0.077
3 0.077
4| 0.078
5 0.078
6 0.078
7 0.078
8 0.078
9 0.078

10) 0.078
11 0.079
12 0.079
13 0.079
14 0.079
15 0.079
16 0.079
By 0.079
18 0.079
19 0.080
20) 0.080
21 0.080
22 0.080
23 0.080
24) 0.080
25 0.080
26 0.081
27 0.081
28 0.081
29 0.081
30) 0.081
31 0.081
32 0.081
33 0.082
34 0.082
35 0.082
36 0.082
37 0.082
38 0.082
39 0.082
40| 0.083
41 0.083

42 0.083
43 0.083
44 0.083
45 0.083
46 0.083
47 0.083
48 0.084
49 0.084
50) 0.084
51 0.084
52 0.084
53 0.084
54 0.084
55 0.085
56 0.085
57 0.085
58 0.085
59 0.085
60) 0.085
61 0.085
62 0.086
63 0.086
64 0.086
65 0.086
66 0.086
67 0.086
68 0.086
69 0.087
70) 0.087
71 0.087
72 0.087
73 0.087
74 0.087
75 0.087
76 0.087
77 0.088
78 0.088
79 0.088
80] 0.088
81 0.088
82 0.088
83 0.088
84] 0.089
85 0.089
86 0.089

87 0.089

88 0.089

89 0.089

90} 0.089

91 0.090

92 0.090

93 0.090

94 0.090

95 0.090

96 0.090

97 0.090

98 0.091

99 0.091
100 0.091
101 0.091
102 0.091
103 0.091
104 0.091
105 0.091
106 0.092
107 0.092
108) 0.092
109| 0.092
110 0.092
111 0.092
112 0.092
113 0.093
114| 0.093
115 0.093
116 0.093
117 0.093
118 0.093
119] 0.093
120 0.094
121 0.094
122 0.094
123 0.094
124| 0.094
125 0.094
126| 0.094
127 0.095
128 0.095
129| 0.095
130} 0.095
131 0.095

132 0.095
133} 0.095
134 0.095
135 0.096
136] 0.096
137 0.096
138 0.096
139 0.096
140 0.096
141 0.096
142 0.097
143} 0.097
144 0.097
145 0.097
146| 0.097
147 0.097
148 0.097
149 0.098
150 0.098
151 0.098
152 0.098
153] 0.098
154| 0.098
155 0.098
156) 0.099
157 0.099
158 0.099
159 0.099
160 0.099
161 0.099
162 0.099
163 0.099
164} 0.100
165 0.100
166| 0.100
167| 0.100
168 0.100
169| 0.100
170 0.100
171 0.101
172 0.101
173 0.101
174| 0.101
1/5 0.101
176| 0.101

177| 0.101
178 0.102
179 0.102
180] 0.102
181 0.102
182 0.102
183 0.102
184] 0.102
185 0.103
186) 0.103
187| 0.103
188) 0.103
189| 0.103
190 0.103
191 0.103
192 0.103
193 0.104
194 0.104
195 0.104
196 0.104
197 0.104
198) 0.104
199] 0.104
200) 0.105

Cost of Energy

Chilled Water |Heating Hot Water
6.536 10.665
6.548 10.684}
6.559 10.703
6.571 10.722
6.583 10.741
6.595 10.761
6.606 10.780}
6.618 10.799
6.630 10.818
6.641 10.837
6.653 10.856
6.665 10.875
6.677 10.894}
6.688 10.913
6.700 10.933
6.712 10.952
6.723 10.971
6.735 10.990}
6.747 11.009
6.759 11.028
6.770 11.047
6.782 11.066
6.794 11.086
6.805 11.105
6.817 11.124)
6.829 11.143
6.841 11.162
6.852 11.181
6.864 11.200}
6.876 11.219
6.887 11.238
6.899 11.258
6.911 11.277
6.923 11.296
6.934 11.315
6.946 11.334}
6.958 11.353
6.969 11.372
6.981 11.391
6.993 11.410]
7.005 11.430

7.016

11.449

building no

wOIANAWNHE

Pee eee ee
NankRoOnRES
efe—e—eTe—eTeyeye—eye—eyeq—e—eyeq—o

Prerequisites Order

ojo

0)

(0)

0)

(0)

(0)

efelelefetet el elelel eel ele le lolo

efefelefetet el elelel ele e[elololo

efeteletetet el elelele lel elolololo

efefelefetet el elelel el el olololofo
elfelelefetel el elelel Ee [ofofolol[o
efelelefetet el elelelololofololo
efefelefetel el el elo olofofololo
efefelefelel el elolololofolololo
efelelelelel es] ololol[olofofololo
efelelelelelolololololofolololo
efelele[elololofolololofolololo

Bl ele el olo[olo[ololo[olo[o[o[o[o
Ble] el ololo[olololo}olololo|ololo

Bl BL ol ofolo[olololololololo|ololo

Bol ol ofolo[olololololololo|o[olo

olololofofolofofofojofolotojolfolo

PRePeEPP PPB EEE BEEBE RO

ocooo°0
oooo°o
ocooo°o
ocooo°o
oooo°o0
oooo°o0
oooo°o
ocooo°0
ooo0°o0
oooo°o
ooo0o°0
ocoaoo°o
ocooo0°o
ocoo0o°o
ooo0o°0
ocooo0o°o
ooo0°o0

PPP PPPRPEPE PE PEE ERO O

PePPPPPEE PERE RE ROO O

PePPPPPEE PERE ROO OO

PPP pPPPRPEE PRE ER ER OOOO O

PPPPPPBRPEE EH OO COO 0

PRPRPRPRPRPRRRROTDOCOO 0

PePePpERERBEE ER OOOO OCO0 0

PRPPPERBRROOOOCOCO0O 0
PRPPRPRPRRROTDODOAOCCOO Oo

PRPRPRRR OOO OOOO CCO Oo
PPP RROOOOOCOCOCOCO0O 0
PPP ROCOCOOCOC COCO O oO
PPR OOCOOODOCOCOCOO oO

PROC OCOOO OOO OOOO oO

rFOOC OC OOO OOOO OOO oO

ooo Moo Momo Mo Momo Momo Mo momomo)

7.028 11.468
7.040 11.487
7.051 11.506
7.063 11.525
7.075 11.544)
7.087 11.563
7.098 11.582
7.110 11.602
7.122 11.621
7.133 11.640}
7.145 11.659
7.157 11.678
7.169 11.697
7.180 11.716
7.192 11.735
7.204 11.754)
7.215 11.774
7.227 11.793
7.239 11.812
725% 11.834
7.262 11.850]
7.274 11.869
7.286 11.888
7.297 11.907
7.309 11.927
7.321 11.946
7.333 11.965
7.344 11.984]
7.356 12.003
7.368 12.022
7.379 12.041
7.391 12.060
7.403 12.079
7.415 12.099
7.426 12.118
7.438 12.137
7.450 12.156
7.461 12.175
7.473 12.194)
7.485 12.213
7.497 12.232
7.508 12.251
7.520 12.271
7.532 12.290
7.543 12.309

ooo Mo Mo Moo Mo Momo momo)

ao)

ooo Mo Mo Mo Momo Momomeomo)

oo Momo Momo Momo Momo momo)

PpPPpPPPP EPP EEE EE ROO O
PePPPPP PPE EE EEOC OO
Peep PPRPPER EER OOOOCOCO0
PPP PPPERER OOOO GCO0
PePPpPPPPEREROOOOCGCO0
PeepPPREPRRODOOOOCOGCGCO0
PRPeERERROOOOCO0OGCC0
PePPpPPRPPRODOODOCOGCGC0O0
PRR ROOCOOCOOCOCOCC OCC e
PRP ROOCOOCOOOCCOC OCC e
PRPBRPRROOOOOOOCOCC OCC O
PRPROOOCOCOOOOCOCOC OCC e
FPROOOOCOOOO COCO OCOC eo
FOOCOD ODDO OOOO OOO oO
oo Mo Mo Mo Mo Mo Mo Mo Mo Momo Momo Momo)

loo Momo Mo Mo Momo Momo momo)

oo MoM Momo Momo Momo momo)

ooo Mo Mo Mo Momo MoMomomo)

(ooo Mo Mo Mo Momo Momo momo)

oo Momo Mo Mo Momo Momo momo)
ooo Momo Momo Mo Momo momo)

ooo Mo Mo Mo Momo Momomeomo)

ooo Momo Mo Momo Mom omomo)

ooo Momo Momo momo momo)

ooo Momo Mo Momo momo momo)

ooo Momo Mme Momo Momo momo)

ooo ooo Momo Momo momo)

ooo Momo momo mo momo mo)

ooo Momo Momo Mo Momo momo)
7.555 12.328
7.567 12.347
7.579 12.366
7.590 12.385
7.602 12.404)
7.614 12.423
7.625 12.443
7.637 12.462
7.649 12.481
7.661 12.500}
7.672 12.519
7.684 12.538
7.696 12.557
7.707 12.576
7.719 12.595
7.731 12.615
7.743 12.634]
7.754 12.653
7.766 12.672
7.778 12.691
7.789 12.710}
7.801 12.729
7.813 12.748
7.825 12.768
7.836 12.787
7.848 12.806
7.860 12.825
7.871 12.844]
7.883 12.863
7.895 12.882
7.907 12.901
7.918 12.920,
7.930 12.940}
7.942 12.959
7.953 12.978
7.965 12.997
7.977 13.016
7.989 13.035
8.000 13.054}
8.012 13.073
8.024 13.092
8.035 13.112
8.047 13.131
8.059 13.150}
8.071 13.169

8.082 13.188
8.094 13.207
8.106 13.226
8.117 13.245
8.129 13.264)
8.141 13.284]
8.153 13.303
8.164 13.322
8.176 13.341
8.188 13.360]
8.199 13.379
8.211 13.398
8.223 13.417
8.235 13.436
8.246 13.456
8.258 13.475
8.270 13.494
8.281 13.513
8.293 13.532
8.305 13.551
8.316 13.570}
8.328 13.589
8.340 13.609
8.352 13.628
8.363 13.647
8.375 13.666
8.387 13.685
8.398 13.704|
8.410 13.723
8.422 13.742
8.434 13.761
8.445 13.781
8.457 13.800]
8.469 13.819
8.480 13.838
8.492 13.857
8.504 13.876
8.516 13.895
8.527 13.914)
8.539 13.933
8.551 13.953
8.562 13.972
8.574 13.991
8.586 14.010,
8.598 14.029

8.609 14.048
8.621 14.067
8.633 14.086
8.644 14.105
8.656 14.125
8.668 14.144)
8.680 14.163
8.691 14.182
8.703 14.201
8.715 14.220)
8.726 14.239
8.738 14.258
8.750 14.278
8.762 14.297
8.773 14.316
8.785 14.335
8.797 14.354)
8.808 14.373
8.820 14.392
8.832 14.411
8.844 14.430}
8.855 14.450]
8.867 14.469
8.879 14.488

month

ANMTN NH DOOR RR@DD

fo}
a

a
ad

Metadata

Resource Type:
Document
Description:
The impacts on energy generation and use on sustainability, increasing energy demand, and declining natural resources have made energy improvements a top priority for many organizations. But adequate financing for sustainability improvement projects for built infrastructures is not available. The Paid-From-Savings approach can leverage savings to pay for energy improvements. Although well established and adopted by many organizations, an incomplete understanding of the dynamics of these revolving fund programs hinders their effective and efficient use. In the current work the Harvard Green Campus Initiative and a Texas A University sustainability improvement programs were used to develop a dynamic model of a revolving sustainability fund. The validated model is used to test the effectiveness of three project planning strategies and two finance alternatives. Results indicate that with adequate funding it was most advantageous to proceed with all projects as quickly as possible and that with insufficient initial funding the best strategy depended upon the program objectives (e.g. earliest completion, largest fund, minimum negative fund balance). Contributions to sustainability and system dynamics modeling and future research opportunities are discussed.
Rights:
Date Uploaded:
January 1, 2020

Using these materials

Access:
The archives are open to the public and anyone is welcome to visit and view the collections.
Collection restrictions:
Access to this collection is unrestricted unless otherwide denoted.
Collection terms of access:
https://creativecommons.org/licenses/by/4.0/

Access options

Ask an Archivist

Ask a question or schedule an individualized meeting to discuss archival materials and potential research needs.

Schedule a Visit

Archival materials can be viewed in-person in our reading room. We recommend making an appointment to ensure materials are available when you arrive.