ABSTRACT

Much of the model verification and validation (V&V) guidance and literature is useful for
explaining the principles of V&V and how V&V is ideally integrated into the simulation
model development life cycle. There is less information available, however, on how to
execute V&V, especially, as is often the case, when the resource commitment for V&V
is limited. There are few examples that illustrate concrete application of the available
V&V techniques or discuss the tradeoffs between theory and cost that are often made.

This paper describes the V&V approach used by Raytheon Company, Cl Systems and
Project Performance Corporation in developing several low-resolution multi-purpose
simulations of integrated industrial facilities and industrial sectors for a government
customer. These projects were characterized by (i) the need to deploy each simulation
model within a 60- or 120-day period; (ii) the need to utilize a commercial-off-the-shelf
system dynamics software application; and (iii) heavy reliance on subject matter expert
input to assess real-world fidelity. Furthermore, V&V had to be performed with little
guidance at the outset as to what the acceptability criteria would be and V&V budgets of
no more than 8 to 10 percent of the total project cost. Consequently, while the V&V
efforts conducted for these projects were built upon the “what and why” guidance
outlined in the customer's policies and in such documents as the Defense Modeling and
Simulation Office's Verification, Validation, and Accreditation Recommended Practices
Guide, tradeoffs had to be made in developing an efficient “how to” approach.

April 30, 2000

Contact Information:

Geoffrey Back Gregory Love

Project Performance Corporation Project Performance Corporation
7600 Colshire Drive, Suite 500 7600 Colshire Drive, Suite 500
McLean, Virginia, 22102 McLean, Virginia, 22102

USA USA

Email: gback@ ppc.com Email: glove@ ppc.com

(703) 748-7070 (voice) (703) 748-7055 (voice)

(703) 748-7001 (fax) (703) 748-7001 (fax)
THE DOING OF MODEL VERIFICATION AND VALIDATION:
BALANCING COST AND THEORY

INTRODUCTION

Except, perhaps, for the simplest spreadsheet-based models, few model sponsors,
users, and developers doubt the wisdom of investing in the verification and validation
(V&V) of models and simulations. After all, the basic principles of V&V make common
sense (see Table 1). However, while there is much in the literature concerning V&V
principles, theory, and techniques, how much to invest in V&V and what should be done
with that investment remain questions for which there seems to be very little specific
guidance, especially for systems dynamics (SD) models. Therefore, these questions
confronted our Raytheon Company, CI Systems-Project Performance Corporation
team (the “‘Team”) beginning in late 1998 as we began to develop a library of SD
models for a government customer (the “Model Sponsor”). This paper traces the
evolution of our V&V process for the range of SD simulation models that our Team has
developed with an emphasis on (1) how, in concert with the Model Sponsor, we chose
to focus a limited V&V budget and (2) the cost-efficient V&V documentation our Team
devised to sustain the Model Sponsor's evolving model accreditation process.

Table 1. The Principles of Verification, Validation, and Accreditation.’

No. Principles

1. There is no such thing as an absolutely valid model.
2. VV&A should be an integral part of the entire M&S life cycle.

A well-formulated problem is essential to the acceptability and accreditation of M&S
3. results.

Credibility can be claimed only for the intended use of the model or simulation and for
4. the prescribed conditions under which the model or simulation has been tested.

M&S validation does not guarantee the credibility and acceptability of analytical results
5. derived from the use of simulation.

V&V of each sub-model or federate does not imply overall simulation or federation
credibility and vice versa.

Accreditation is not a binary choice.

6.
a;
8. VVG&A is both an art and a science, requiring creativity and insight.
9. The success of any VV&A effort is directly affected by the analyst.

10. VV&A must be planned and documented.

11. V&V requires some level of independence to minimize the effects of developer bias.

12. Successful VV&A requires data that has been verified, validated, and certified.

> Source: Verification, Validation, and Accreditation Recommended Practices Guide (DMSO, 1996)

The Doing of Verification and Validation 1 30-Apr-2000
STARTING WITH A BLANK SHEET OF PAPER

When our Team convened to develop its first SD simulation model for the Model
Sponsor, a prototype or proof-of-concept SD model of a petrochemical industrial
process, no monies had been earmarked for V&V; in fact, model V&V had not even
been identified as a contractual requirement. Shortly thereafter, however, the Team
helped the Model Sponsor realize that a prudent investment in model V&V offered a
considerable potential payback. The final model was designed to represent a
simplification of reality, but without the requisite confidence in its capabilities and
limitations, no judgment could be made regarding its fitness for a particular purpose.
Coyle and Exelby aptly make this conclusion in their observations about the concept of
validity as it relates to practice of consultancy in SD (Coyle and Exelby, 2000). Asa
result, the Model Sponsor added a V&V requirement to its next simulation model
development effort, an SD model of an integrated nitrogen fertilizer production complex.
At the same time though, the Model Sponsor had yet to develop its policies and
guidelines for model V&V and, on this occasion, no additional funding would be
available to sustain the V&V effort. In short, our Team faced the dual challenges of
fulfilling a new mandate with no specific sense of what the Model Sponsor required (or
might require) and having to minimize the draw on the funds sustaining the other
simulation model development tasks. Effectively, our Team was starting with a blank
sheet of paper.

Starting with this blank sheet of paper and limited funding for V&V, however, proved to
be as much of a benefit as it was a challenge. It forced a focus on the essence of
model V&V and on the need for cost efficiency, which allowed our Team to adapt to the
Model Sponsor's ever changing funding constraints without sacrificing the principles of
V&V. The result was a V&V process so well adapted to the low-resolution, multi-
purpose simulations of integrated industrial facilities and industrial sectors being
developed for the Model Sponsor that it helped shape the Model Sponsor’s emerging
V&V policy and procedures guidance due out in final form later this year.

Before proceeding to describe our tailored V&V process and documentation methods, it
is important to ensure the reader is familiar with V&V terminology and to provide the
reader with a sense of the types of SD simulation models our Team is developing for
the Model Sponsor's library of analytical tools. Equally important for the reader to know
is that these SD simulation models had to be delivered to the Model Sponsor in
anywhere from 60 to 120 days after project start, not the many months or even years
typical of many simulation models characteristic of large-scale efforts that are often the
subject of applications in the V&V literature.

A BRIEF V&V TERMINOLOGY PRIMER

If the reader is unfamiliar with the basic concepts and terminology of model V&V, the
authors suggest referring to such helpful resources as, among others, four of the
references cited at the end of this paper (Coyle, 2000; DMSO,” 1996; Robinson, 1999;

? Defense Modeling Simulation Office, U.S. Department of Defense.

The Doing of Verification and Validation 2 30-Apr-2000
and Sargent, 1999). However, as a quick primer, model verification refers to a process
aimed at answering the question “did we build the model right?” and model validation
refers to a process aimed at answering the question “are the results credible?”
Verification techniques are deployed to ensure that the requirements for the simulation
model and its conceptual model design have been transformed into the computer model
with sufficient accuracy. Validation techniques are deployed to reach an acceptable
level of confidence that the simulation model's results are sufficiently accurate for its
intended use and applicable to the real-world system being modeled. The basic goals
of model V&V, therefore, are two-fold. First, demonstrate that the requirements
established by the model sponsor can be traced through the structural design,
functionality, and output(s) of the model. Second, build confidence in the modeled
results by attempting to prove that the simulation model is, in effect, incorrect relative to
the real-world system being modeled.

Ultimately, the V&V process furnishes the necessary information to make an informed
accreditation decision. Accreditation refers to the decision by a model sponsor (or its
accreditation authority) whether to use a specific model for a specific application.
Without a sound and documented V&V process, those charged with making the
accreditation decision lack the knowledge critical to certifying the model for the intended
use.

In its draft policy guidance on model V&V, our Model Sponsor divides verification and
validation activities across the simulation model development life cycle into eight
functional events as outlined in Table 2. Five of these functional events relate to
verification activities and the remaining three relate to validation activities.

Table 2. Eight Functional Events Associated with V&V.

Verification Activities Validation Activities
1. Requirements Definition 1.__Conceptual Model Validation
2. Conceptual Model Verification 2. Data Validation
3.__ Design Verification 3. Results Validation

4. Code Verification

5. System Verification

As shown in Table 3 on the next page, there are numerous specific V&V techniques
available for use that can be grouped in a variety of ways (one such grouping scheme
shown in Table 3). These techniques can be used in support of one or more of the V&V
activities identified in Table 2. Typically, these activities and techniques are carefully
planned and documented in the form of a V&V Plan, which is revised as the V&V
activity it describes unfolds during the course of the model development life cycle.

The Doing of Verification and Validation 3 30-Apr-2000
Table 3. Categorization of V&V Techniques.?

Category V&V Techniques

Informal | Audit Desk Checking
Face Validation Inspections
Reviews Turing Test
Walkthroughs

Static Cause-E ffect Graphing Control Analysis (calling structure;
Data Analysis (data dependency; data concurrent process; control flow; state
flow) transition)
Interface Analysis (model interface; Fault/Failure Analysis
user interface) Semantic Analysis
Structural Analysis Symbolic Evaluation
Syntax Analysis Traceability Assessment

Dynamic | Acceptance Testing Alpha Testing
Assertion Checking Beta Testing
Bottom-Up Testing Comparison Testing
Compliance Testing (authorization; Debugging
performance; security; standards) Fault/Failure Insertion Testing
Execution Testing (monitoring; Functional (Black-Box) Testing
profiling; tracing) Interface Testing (data; model; user)
Field Testing aye .

. Partition Testing

Graphical Comparisons Product Testing
Object-Flow Testing Sensitivity Analysis
Predictive Nalidation Special Input Testing (boundary value;
Regression Testing equivalence partitioning; extreme input;
Statistical Techniques invalid input; real-time input; self-driven
Structural (White-Box) Testing (branch; input; stress; trace-driven input)
condition; data flow; loop; path; Sub-model/Module Testing
statement) Top-Down Testing
Symbolic Debugging Visualization/Animation

Formal Induction Inference
Logical Deduction Inductive Assertions
Lambda Calculus Predicate Calculus
Predicate Transformations Proof of Correctness

Verification Activities

Requirements definition focuses on, first, defining the problem statement accurately,
and then identifying the simulation model outputs, functions, and interactions required to
Conceptual model verification entails reviewing the
conceptual model and ensuring it meets all the specified requirements because it is the

answer the problem statement.

3 Source: Verification, Validation, and Accreditation Recommended Practices Guide (DMSO, 1996)

The Doing of Verification and Validation 4

30-Apr-2000

bridge to the model developer’s design for the simulation model. Design verification
refers to the process of reviewing the model developer's detailed design to ensure it
conforms to the conceptual model. Code verification can utilize a wide variety of
techniques to test the simulation model’s source code to ensure the detailed design has
been implemented correctly. Finally, system verification encompasses tests of the
simulation model to determine if it accurately represents the functional design and is
traceable to the conceptual model and all requirements.

Validation Activities

Validation of a simulation model is addressed through three activities listed in Table 2.
In the early stages of the simulation model development life cycle, validation of the
conceptual model ensures that the proposed conceptual model and its design satisfy
the fidelity, accuracy, and/or credibility requirements imposed by the model sponsor's
problem statement. The key to conceptual model validation is to confirm that the
classical influence diagrams, also sometimes referred to as causal loop diagrams have
a sound theoretical basis. Discovering and correcting (if possible) fidelity errors at this
stage of the simulation model development life cycle is often far less expensive than
doing so after the conceptual model has been translated into computer code. As the
simulation model is translated into computer code, however, data validation and results
validation take center stage. Data validation refers to determining that the data to be
used in building and validating the simulation model are sufficiently accurate. Results
validation encompasses techniques used to test/see if the modeled results are
sufficiently accurate for its intended use. One such technique is termed “face
validation,” which relies heavily upon the knowledge and judgment of a subject matter
expert (SME) familiar with the real-world system, interrelationships, and influences
being modeled. “Face validation” refers to the techniques described by Forrester
(Forrester, 1961), the most important of which is an evaluation of scenario results (data
and graphs) relative to the real system. In some cases this evaluation consists of a
comparison to historical behavior from the actual system, in other cases this a
reasonable test on the normalcy of the decision policies and resultant actions. The
essence of the “face validation” technique is the process whereby scenarios (both
planned and impromptu) are conducted in the presence of the SME who evaluates the
results and opines on the outcome. To date, each of the SD simulation models our
Team has developed has utilized one or more SMEs as a key resource contributing to
the V&V process we describe in this paper.

It is important to emphasize here that any model V&V effort and the accreditation
decision it supports is linked to the simulation model's particular requirements, design,
and intended use. If the requirements, design, and/or the intended use of the simulation
model are changed, the V&V effort must be repeated to some degree if not entirely from
scratch.

A SPECTRUM OF SD MODEL TYPES

Figure 1 illustrates the spectrum of SD simulation model types that has characterized
the tasks assigned to our Team to date by the Model Sponsor. As noted above, our

The Doing of Verification and Validation 5. 30-Apr-2000
initial proof-of-concept model dealt with a specific industrial process, which is
represented by the far left column in Figure 1. Our next three SD simulation models
moved to the right along the spectrum shown in Figure 1 to model the manufacture of
chemicals produced at certain integrated industrial complexes (two models) and one
other type of manufacturing facility. These first four SD simulation models, all
developed over a one year-period, were examples of what we term “facility-level”
models. Each high-level simulation model presented its unique modeling challenges,
but each emerged with the functionality to match almost every possible facility or
integrated complex configuration (including the associated utility elements) so that
model users could explore multiple “what if” scenarios of interest. On the whole, these
low resolution “facility-level” simulation models were very quantitative in that we could
make use of known reaction chemistry and energy/material balances to quantify the
flows of and interrelationships between the various chemical intermediates and final
products produced by the modeled systems.

SD Modeling Spectrum
Country
Economy
» National
Country Governance
Infrastructure | * S0cio-
Political
« Petroleum Climate
Petrochemical | + Petrochemicals « Institutional
Industry is Chemicals Setting
« Feedstock * Meme + Labor
Petrochemical | + Production Monutictaring |% lechnoleay
Transportation |* + Heavy
‘Complex i. Distribution « Dunties Industry
———— « Cracking 1 Markets + Transportation |, Service
Petrochemical | « Reforming + Technology Industry
Unit Separation « Communications | , Consumer
» Synthesis Products
« Ethane
2 Ethylene Polymerization
From Facilities > To Systems

Figure 1. Schematic of SD Models Developed to Date.

Currently, we are developing a SD simulation model more closely resembling the right
half of the spectrum illustrated in Figure 1, which we refer to as “system-level” models.
This high-level “systems-level” simulation model will explore the interrelationships and
influences within a specific commodity industry, which will require our Team to model
the influence of certain economic and governmental policies, influences that did not
need to be considered in the four “facility-level” models developed previously.

The Doing of Verification and Validation 6 30-Apr-2000
We offer this backdrop concerning the types of SD simulation models our Team has
developed and is developing because when we turned to the V&V literature for
guidance pertinent to developing the specifics of our V&V process, we found very little
applicable “how to” or “how we did it” guidance. We did find many references, like the
Verification, Validation, and Accreditation Recommended Practices Guide (DMSO,
1996), which spoke to the important principles of V&V, emphasized that V&V needed to
be blended into the entire simulation model development cycle, and provided lists of
V&V techniques. With few exceptions, however, the available V&V guidance we found
either (1) fit modeling efforts of a size, budget, and duration that did not match our
circumstance, (2) seemed better suited to acquisition models or training simulations,
and/or (3) provided no sense of how to balance the theory of V&V with the cost of V&V.

One of the important V&V principles, of course, is that any V&V effort must be tailored
to reflect many considerations, especially, as noted earlier, the intended use of the
simulation model and each model sponsor's acceptability and accreditation criteria.
Therefore, to a certain degree, the absence of “how to” specifics to guide a balancing of
V&V theory and cost for our SD simulation models is an understandable limitation.
Similarly, the balance struck between V&V theory and cost for a particular simulation
model does not necessarily translate to the next model. Consequently, a V&V process
that works well for one simulation model may need to be recast to work as well for
another simulation model. Nevertheless, while not an ideal process when measured
against the theory of V&V, the authors believe that the V&V process and documentation
methods described below have broad “how to” applicability to a range of simulation
models.

A BALANCED V&V INVESTMENT: ONE EXAMPLE

As our Team contemplated the appropriate balance between V&V theory and costs for
the types of SD simulation models the Model Sponsor has asked us to develop, we
chose to focus the available V&V investment on three critical stages of the simulation
model development life cycle: requirements definition and tracking, conceptual model
verification and validation, and results validation. We prioritized these three stages
based on our determination that these were the most value-adding V&V activities after
matching the available V&V techniques listed in Table 3 to the appropriate functional
events presented in Table 2. In assessing the value-added contributions from the
various V&V activities, we adhered to Coyle’s notion that the goal of V&V is to provide
confidence that the SD model is “well-suited to its purpose and soundly constructed”
(Coyle, 1996). This is not to say that no investments were made in such activities as
design verification, code verification, system verification, or data validation, but only that
the investment in these areas was more measured and the documentation was reduced
to a minimum to meet the budgetary constraints.

Figure 2 presents the key V&V activities as captured in the schedule of the major
deliverables that occur throughout our generalized model development cycle. For
simplicity and as an anchor for the temporal sequence of the milestone V&V activities,
we have rolled the simulation model development process into three phases:
requirements definition, model development (primarily translation), and testing &

The Doing of Verification and Validation HE 30-Apr-2000
Milestone V&V Activities Schedule

i
Define 1
cine
A. Issue System Requirements Document 1
A. ssuevev tan | !

Develop i

Model 1 1
(A. sue Verification of Assumptions Document

A. ‘ssue Verification Document

Generalized
Mode! Development Phases

Acceptance

A. bssue Test Pan

| Raatoetvey, de
0 30 60 90 120
Model Development Timeline (days)

H
f i
{ f
Testing & H H
f f
f 1
f f
H i
i i

Figure 2. Sequence of Key V&V Activities in the Development Cycle.

acceptance. There are many more phases to our model development cycle than are
identified in Figure 2, but our intent is to clarify when these three key V&V activities
would occur in the overall development process.

Figure 2 identifies the initial issue date for each of our major V&V-related documents,
but there is actually a period preceding each issuance date to draft, review, and finalize
each document. After the initial version is issued, it is subsequently revised and
updated as needed throughout the model development cycle. As an example, we have
needed to issue revisions to the System Dynamics Requirements Document (SDRD)
described on the next page late in the testing & acceptance phase in response to
validation results prompting new requirements for the model. Although neither the
Team nor the Model Sponsor are thrilled with the impacts of model changes identified
late in the process, the fact these last-minute changes do occur occasionally attests to
the fact that V&V documents are dynamic and evolve with the development process.

It should be immediately clear from reviewing Figure 2 that V&V must be fully integrated
into the model development cycle to be successful. V&V begins early in the
requirements definition phase and continues up to the conclusion of the development
cycle when the SD simulation model is delivered to the Model Sponsor for accreditation.
The specific V&V activities undertaken, however, evolve in accordance with the eight
functional events identified in Table 2. Three of these stages formed the core of our
V&V plan and are more fully described on the pages that follow.

The Doing of Verification and Validation 8 30-Apr-2000
Requirements Definition and Tracking

It is our view that all V&V activity flows from (a) understanding the problem statement
for the simulation model and then (b) defining and then tracking the Model Sponsor's
requirements for the simulation model through to the final product. Poorly defined
simulation models, even if their results are judged credible, are basically worthless.
Consequently, the V&V Plan we have developed for our SD simulation models has
emphasized capturing the Model Sponsor's requirements as they are developed and
refined, and then tracing each requirement through to an element or functionality in the
completed model to ensure each requirement is met. Several requirements definition
meetings with the Model Sponsor and the SME have been built into the early stages of
our simulation model development life cycle (although model requirements can emerge
at any stage of the life cycle), and the output of these meetings has been recorded in
iterations of the SDRD. Table 4 presents the outline of our SDRD and Table 5 is an
excerpt of the model requirements tracking table contained within that document that
has been used to track changes to and eventual acceptance of each stated
requirement. The SDRD eventually becomes one of the documents incorporated into
the V&V Plan by reference.

Table 4. Outline of SD Requirements Document (SDRD).

System Dynamics Requirements Document
1.0.0 cssvanues Introduction
1.1.0 ... Purpose of this Document
1.2.0 ... Intended Audience
2.0.0 roject Summary
QAO! sesceniccsccenecevcencce Project Name
2.2.0 ... Project Statement
2.3.0 ... Project Team Organization
3.010) exenwens Model Requirements
3.1.0 ... General Description
3.2.0 Base Requirements
3.2.1 Enumerated Requirement 1
B22) sesveciecssnapusvensmemernivente Enumerated Requirement 2
3.2.3 .Enumerated Requirement 3
3:2.% ax .Enumerated Requirement X
A.Q10! veivevivensvs Requirements Tracking Table

The reader will note that the content of our SDRD and format of the requirements
tracking table are not particularly inventive or innovative. However, the V&V literature
and guidance often lacks such “how to” examples altogether or offers an example that

The Doing of Verification and Validation 9 30-Apr-2000
Table 5. Abridged Requirements Tracking Table.

Revision
Accepted/
Rejected/

No. Original Requirement Proposed Revision Revised Date Current Requirement

3.2.1 Model a co-located, conventional The operating units will be Accepted 10/27/99 | Model a conventional integrated
integrated phosphate fertilizer centrally located but not phosphate fertilizer complex that
complex that makes phosphoric acid | necessarily co-located with the makes phosphoric acid and
and derivatives for the fertilizer mine. derivatives for the fertilizer industry.
industry. The major raw materials The major raw materials include
include phosphate ore, natural gas, phosphate ore, natural gas, and
and sulfur. sulfur.

3.2.2 The complex size will be primarily Drop the option to produce Reviewed 10/27/99 | The complex size will be primarily
based on the user-selected capacity | phosphoric acid only. and based on the user-selected capacity
for the phosphoric acid unit. The Revised for the phosphoric acid unit. The user
user will also have the capability to Add AIF as an additional will also have the capability to specify
specify the production rates for all fey a F the production rates for all the other

f derivative to be consistent with F
the other process units. ihe proposed revisions to process units.
The model will have the capability to | Pee haa The model will have the capability to
set the unit configuration in one of a = ——— - set the unit configuration in one of two
three ways: (1) entire complex, (2) | Certain combinations of Revised 11/18/99 | ways: (1) entire complex, and (2)
phosphoric acid production only, (3) | Process units will not be Version phosphoric acid with any allowable
phosphoric acid with any allowable | allowed. The user must select | Accepted combination of derivatives.
combination of derivatives (MAP, either 3 HF of AIF unit, but not Certain combinations of process units
DAP, HF, SSP, and TSP). both: ‘The User must select will not be allowed. The user must
net nee ahead ae but select either a HF or AIF3 unit, but not
ee both. The user must select either a
iney choose Nellfier et HE /AlEs MAP or DAP unit, but not both. In
Dee eee Unitts) In the get addition, the user may choose neither
EORSUSUETE an HF/AIF3 nor MAP/DAP unit(s) in
the unit configuration.
3.2.3 A simulation cycle will be four Accepted 10/13/99

months (120 days) long with a
resolution down to one day.

The Doing of Verification and Validation

10

30-Apr-2000

appears to require a considerable investment of resources. In contrast, our “how to”
example of a SDRD accomplishes the basic V&V objectives for the requirements
definition stage simply and cost effectively.

Conceptual Model Verification and Validation

The conceptual models our Team has developed for the ‘“facility-level” and “system-
level” SD simulation models have ranged from fairly basic and high-level block-flow
diagrams to causal loop diagrams. As the “blueprints” for the model translation process
that follows in the simulation model development life cycle, the V&V of these conceptual
models is a pivotal investment. As noted earlier, the nature of the SD simulation models
our Team works on for our Model Sponsor requires the use of one or more SMEs as the
key resource involved in conceptual model verification and validation. At these
conceptual model meetings, the SME assists our Team in ensuring that the proposed
conceptual model (1) speaks to all of the stated requirements as tracked in the SDRD
(conceptual model verification) and (2) satisfies the fidelity requirements imposed by the
problem statement (conceptual model validation).

Because we rely on a series of meetings with a SME and the Model Sponsor at which
the conceptual model for our SD simulation models is reviewed and eventually
“approved,” we have found it necessary to develop two forms of documentation for the
conceptual model V&V efforts. First, we develop very detailed narrative minutes of
each of SME meeting. Among other things, these minutes, which are recorded by our
designated V&V Lead on the model development team, track the ebb and flow of the
conceptual model discussions. The minutes not only record the consensus decisions
reached by the meeting participants, but also record the proposed ideas and competing
opinions often expressed at brainstorming meetings. The minutes are then shared with
all the meeting participants and subjected to a formal review and approval process. As
with the SDRD, these minutes are incorporated by reference in the V&V Plan.

It has been our experience, however, that there is more to the conceptual model
development process that takes place outside of the scheduled meetings and that
initially tends to occur among the model developers only. Often, a model developer
receives a Set of fairly high-level model requirements from the model sponsor that must
be fleshed out to a greater level of detail or resolution in order to meet the thrust of the
requirement or to effect the desired functionality in the simulation model’s design and
source code. In addition, it may be necessary to develop certain simplifying
assumptions or surrogate measures, particularly when there are data gaps or only a
partial understanding of the relationship or influence to be modeled. This process of
fleshing out or adding necessary details to the model sponsor's high-level requirements
usually entails making a series of assumptions that are not captured in the SDRD perse
and which are not evident in an influence diagram. Again, the literature speaks to the
necessity of this V&V step in the development of conceptual models, but offered us no
concrete example of “how to” capture the results of this step. Therefore, our Team
developed the Verification of Assumptions Document (VAD), an excerpt from which is
shown in Table 6.

The Doing of Verification and Validation ati 30-Apr-2000
Table 6. Abridged Verification of Assumptions Document.

Verification of Assumptions

Date

Revision

Plant Configuration. The user may select any desired
configuration of available plants with the following exceptions:
1. A complex cannot have both a MAP and DAP plant or both
a hydrofluoric acid and aluminum fluoride plant.
2. If either a MAP, DAP, HF, AF, or TSP plant is present,
then there must be a phosphoric acid plant with adequate
capacity.

10/27/99

Intermediate Products. The only intermediates that can be
received from outside sources are phosphate rock, sulfuric acid,
and ammonia. Inventory will be managed for these materials and
coordinated with offsite ordering.

10/13/99

Capacity. The user will have the flexibility to establish the plant
capacities for most plants. However, a warning message will notify
the user when the phosphoric acid plant cannot adequately meet
phosphoric acid feed requirements for the TSP, MAP, and DAP
plants. This exception is necessitated by the inability to receive
phosphoric acid from offsite.

11/18/99

The capacity of the hydrofluoric acid and aluminum fluoride
plants will be calculated based on the steady state
fluosilicic acid output of the phosphoric acid plant. This
exception is necessitated by the inability to receive
fluosilicic acid from offsite.

Onsite Storage of Feed Materials. Each plant, and the complex
as a whole, will have limited capacities to store raw materials. The
user will have the ability to alter most of these constraints. Normal
(or target) operating inventory levels will be less than the scenario
cycle time (120 days) to allow the user to examine the dynamics of
inventory shortages.

10/13/99

The Doing of Verification and Validation

12

30-Apr-2000
Each VAD, which is also incorporated by reference into our V&V Plans, is a compilation
of the model developer's translational assumptions and is continuously updated as the
conceptual model V&V process unfolds and the simulation model translation activity
proceeds. The VAD is reviewed periodically with the SME(s) and the Model Sponsor to
secure their agreement with these assumptions before the coding of the simulation
model begins in earnest. In keeping with our other “how to” examples, the VAD is a
simple cost-effective means of tracking these key assumptions that “gets the job done”
for the minimal investment.

Results Validation

In the case of documenting results validation, the V&V literature actually contains
numerous examples of test plans and the documentation generated in executing these
test plans. It was evident, however, that these test plan examples were quite elaborate,
very quantitative-oriented, and better suited to the acquisition model environment than
to the types of SD simulation models our Team was developing. Again, we opted fora
simpler cost-effective approach combining a brief narrative test plan describing the
rationale behind the selected test scenarios and the results validation-tracking table an
excerpt of which is shown in Table 7.

Initially, test scenarios designed to test the desired functionality and fidelity of the
simulation model are solicited from the model developers, the Model Sponsor, model
users, and the SME(s). The test scenarios are closely linked to the requirements
identified in the SDRD. The first priority is to demonstrate the steady state or baseline
scenario(s) to build confidence in the model fundamentals. The second priority is to
investigate the model behavior that results from a series of perturbations to the baseline
scenario. Each perturbation is designed to exercise a specific model capability that is
identified in the SDRD. Each test scenario is categorized and then assigned its own
row in the tracking table. The SME's and the Model Sponsor's reactions to the results
of each test scenario are then recorded in the tracking table at the results validation
meeting (as well as in the meeting minutes). As necessary, test scenarios are added
and/or repeated at another results validation meeting if the SME’s and Model Sponsor's
reactions to the initial test results dictate a revision to the simulation model. Eventually,
the tracking table shows the date at which the results of the test scenarios are accepted
by the SME(s) and the Model Sponsor as sufficiently credible for the simulation model's
intended purpose. This “final” results validation-tracking table is then incorporated into
the “final” version of the V&V Plan.

The Doing of Verification and Validation 13 30-Apr-2000
Table 7. Abridged Validation Scenario Tracking Table.

Test Accepted/
No. Category Description Date Revised Comments
la. Configuration/ 100 tod ammonia unit; 1,200 tod phosphoric 11/18/99 Revised Add production rate adjustment logic
Steady State acid unit; a MAP unit and an AIF3 unit, but no in the sulfuric acid and phosphoric
SSP or TSP unit; default sizes for all the other acid units that automatically adjusts.
“enabled” units in the complex; default the rate whenever the supply of
feedstock and utilities priorities; and all default these intermediates exceeds
values on Configuration Screen No. 2 demand.
2a. Offsite 200 tod ammonia unit; 1,200 tod phosphoric 11/18/99 | Accepted
Ordering/ acid unit; a 1,025 tpd ore beneficiation unit; a
Inventory DAP unit and an HF acid unit, but no SSP or
Management TSP unit; default sizes for all the other
“enabled” units in the complex; default
feedstock and utilities priorities; and all default
values on Configuration Screen No. 2, except
the complex was unable to order phosphate
rock for 20 days and the target and maximum
inventories for phosphate rock were set at 15
days and 30 days of coverage, respectively
3a. Utilities Shock 200 tpd ammonia unit; 1,200 tod phosphoric 11/18/99 Revised Although most units shut down in the
acid unit; a DAP unit and an AIF3 unit, but no face of a loss of electrical power, the
SSP or TSP unit; default sizes for all the other ammonia and sulfuric acid units
“enabled” units in the complex; default continued to operate, even after the
feedstock and utilities priorities; all default off-site power grid was lost. Both the
values on Configuration Screen No. 2; and the ammonia and sulfuric acid units
model is run in steady state for 30 days require electrical power to operate.
followed by disabling the (i) steam turbine for
90 days and (ii) around day 60, disabling the
off-site electrical power for 30 days.
The Doing of Verification and Validation 14 30-Apr-2000
METRICS

What's the true cost of V&V? Certainly, it is an activity that we cannot afford not to do,
but one that can consume a lot of resources if not kept in perspective. Here are the
performance metrics on how much our Team has spent to date to address the gap
between theory, guidance, and practice.

V&V Cost Benchmark

20%

15%

10%

~<— Team Experience

5%!

[Hi common nange
[Dy inax range o%

Percent of Total
Model Development Costs

Figure 3. Experience rating for V&V Costs.

The Verification, Validation, and Accreditation Recommended Practices Guide (DMSO,
1996) offers some benchmark ranges. Using historical data, it reports that V&V
activities expressed as a percentage of the total model and simulation budget ranges
from 5 percent to 17.5 percent, with most efforts concentrated in the narrower range of
between 10 and 12 percent. These benchmarks are presented in Figure 3. It is not
clear to us what V&V costs are actually included in these cited historical benchmarks. If
we assume that the narrow range captures some measure of the average practice that
would include direct labor associated with executing V&V activities, then we can infer
that it is primarily the time spent by the designated V&V Lead. Using this definition, our
historical V&V investment of 9.5 percent of total funding falls just below the narrow
benchmark range. Our experience has been averaged over a combination of “facility-
level” and “system-level” models previously described.

One can argue that the benchmark understates the true cost of V&V because it

excludes the cost of the SME. For example, if we were to include the SME costs
involved in our past SD simulation efforts, the actual V&V investment as a percentage of

The Doing of Verification and Validation 15 30-Apr-2000
total funding would increase by 8.5 percent to a total of 18 percent. Clearly, this
analysis points to the weaknesses of what is or can be counted as part of the V&V
investment.

Setting the SME costs aside, however, we attribute our V&V cost performance to
successfully integrating V&V into every step in the model development process. V&V
should be a mindset executed by everyone on the model development team with each
team member embracing the V&V principles as an everyday part of his or her work
process. This total team commitment has the benefit of lowering direct V&V labor and
shifting the focus away from the perception that V&V is only an audit.

SUMMARY

One of the key V&V principles stated in the Verification, Validation, and Accreditation
Recommended Practices Guide (DMSO, 1996) is that “V&V is both an art and a
science, requiring creativity and insight. We believe an appropriate corollary to this
principle would be “no one type or size fits all.” It is not too surprising, therefore, that
the V&V literature tends to be devoid of specific “how we did it” examples. It is still
disappointing, however, to turn to such guidance and come away feeling it would have
been helpful to see some concrete “how to” and “how we did it” examples. Apparently,
others have had similar reactions to the available V&V guidance as we understand that
some of the available guidance is being revised to offer more “how to” guidance in
addition to discussions of V&V theory and individual V&V techniques. In this paper, our
Team provided a synopsis and specific examples of how we balanced V&V theory and
the resources we were allocated for the V&V of several low-resolution multi-purpose SD
simulation models toward achieving a cost-effective and documented V&V investment.

REFERENCES

Coyle, G., 1996. System Dynamics Modelling: A Practical Approach. Chapman and
Hall: London, pp. 12 & 155.

Coyle, G. and Exelby, D., 2000. ‘The Validation of Commercial System Dynamics
Models.” System Dynamics Review, Volume 16, No. 1, pp. 27-41.

Defense Modeling and Simulation Office (DMSO), November 1996. Verification,
Validation, and Accreditation Recommended Practices Guide. U.S. Department of
Defense. Office of the Director of Defense Research and Engineering.

Forrester, ].W., 1961. Industrial Dynamics. MIT Press: Cambridge, MA, pp. 119-123.

Robinson, S., June 1999. “Simulation Verification, Validation, and Confidence: A
Tutorial.” TRANSACTIONS of the Society for Computer Simulation International.
Volume 16, No. 2, pp.63-69.

Sargent, R., 1999. ‘Validation and Verification of Simulation Models.” Proceedings of
the 1999 Winter Simulation Conference, pp. 39-48.

The Doing of Verification and Validation 16 30-Apr-2000

Metadata

Resource Type:
Document
Rights:
Date Uploaded:
December 19, 2019

Using these materials

Access:
The archives are open to the public and anyone is welcome to visit and view the collections.
Collection restrictions:
Access to this collection is unrestricted unless otherwide denoted.
Collection terms of access:
https://creativecommons.org/licenses/by/4.0/

Access options

Ask an Archivist

Ask a question or schedule an individualized meeting to discuss archival materials and potential research needs.

Schedule a Visit

Archival materials can be viewed in-person in our reading room. We recommend making an appointment to ensure materials are available when you arrive.