Bianchi, Carmine with Fabrizio Virdone Re-engineering Manufacturing Processes in a Telecommunicatio Company. A System Dynamic Approach", 1997 August 19-1997 August 22

Online content

Fullscreen
RE-ENGINEERING MANUFACTURING PROCESSES

IN A TELECOMMUNICATION COMPANY.

A SYSTEM DYNAMICS APPROACH

CARMINE BIANCHI FABRIZIO VIRDONE
Assistant Professor - Faculty of Economics Consultant Engineer
University of Palermo (Italy) Via Laurana 93, 90143 - PALERMO
E-MAIL: BIANCHI@UNIPA.IT E-MAIL: MD3683@MCLINK.IT
ABSTRACT

A few years ago a European telecommunication firm started a deep reorganization project aimed at improving
production process performance in order to quickly respond to big market changes.

Such a project, which is still in progress, concerns both technical (i.e. machinery) and organizational (i.e. pull
production control system, total quality, etc.) points of view.

A system dynamics model has been sketched in order to estimate potential benefits coming from a shift from the
actual production system (mainly based on a push approach) to a pull system, based on kanban methodology.

Even though the model is focused on a bounded management area, the goal of this paper is to stir up a growing
managerial concern in the System Dynamics methodology within the firm.

1. COMPANY'S AND MANAGEMENT PROBLEMS' OUTLINE

Teltronic Co. produces and sells electronic devices. Due to the globalization process in the telecommunication
market, the company is now investing growing resources in order to improve its market share in foreign countries.
For this reason, it has started a deep reorganization project aimed at improving production performance.

Overstocking is a main problem which production management is facing now, due to the need to overcome
competitors’ growing efforts to improve sales orders lead times. Major drawbacks of overstocking are not only related
to higher financial costs on inventories, but particularly on potential obsolescence costs, which are a big deal in
such a highly dynamic industry. In order to better manage such organization problems, System Dynamics has been
used to model production dynamics to support decision makers to evaluate main strengths and drawbacks related
the push and pull approaches.

A simplified model and related results will be discussed.
2. THE PUSH MODEL

Teltronic production system is now based on a push approach. Production process consists of three main stages: (1)
automated assembly, (2) manual assembly and soldering, (3) testing.

Figure 1 shows a stock and flow model concerning a push production process.

Fig. 1: The push model

The main model's structure describes production "pipeline". It starts from raw materials orders rate, which feeds the
production line and closes with a shipping rate. A chain of three "cascaded" stages connects raw materials with
shipping rates.
tion_Completion_rate_t

Fig. 2: Negative second order feedback loop (Delayppimtr tunction)

Production and raw materials orders are calculated on the base of a past sales orders smoothing and a finished
products desired coverage. Weekly sales orders have been modelled as a step function, whose value randomly
changes.

Both in the push and in the pull models, each production stage has been represented as a second order negative
feedback loop. In fact, production rate starts the process and accumulates into a work-in-process (WIP) stock;
production completion rate depletes WIP and accumulates into Inventory stock. In order to calculate production
completion rate, a "delay pipeline material" (de/ayppimtr function has been used, rather than a WIP/lead time ratio,
to better represent system's behaviour (i.e. production capacity constraints, inventories availability according to
different production batches, etc.) (fig. 2). Both push and pull models are based on a simplified hypothesis that only a
product-code is manufactured.

3. THE PULL MODEL

Fig. 3 shows the pull model, which is based on the same production structure (i.e. the same stocks and flows,
delays) of fig. 1.

The main difference between the two models is related to the "kanban sub-system". Such a sub-system allows one
to calculate minimum inventories (number of kanbans) at the end of each production stage as a function of weekly
sales orders. In order to achieve desired inventories, the same sub-system authomatically calculates production
orders at each stage (fig. 4).

In other words, while in the first production system expected orders are pushed from the beginning of the line, in the
second system actual sales orders pull inventories from the end of the line and, consequently, give rise to production
orders in the previous stages.

Fig. 3: The pull model

4. COMPARATIVE RESULTS

Fig. 5 shows main results from a simulation run of the two models, based on a same sales orders pattern (see
"new_orders" graphs). As it is possible to notice from the graphs on the top, both finished ("Inventory_3") and in-
process inventories are by far lower in the pull than in the push system. This is a significant advantage of the pull
system, as it may allow to reduce financial and obsolescence costs on inventories.

PRODUCTION
HO
yy RATE +
4

“A
naevade Cree as SIMISHED
pele TF nonvers
NN ceso rte INVENTORIES
+
KANBAN
NUMBERS %
+ SALES a SHIPPING RATE

+ .

SA sats ORDERS -4—~
BACKLOG

Fig. 4: Negative feedback loops in a kanban system

On the other hand, although both systems are able to meet sales orders weekly schedules, in the push one end
products availability is higher than in the pull system (see orders backlog dynamics). Obviously, higher end product
inventories (Inventory_3) may allow a quicker customer orders’ satisfaction.

Itis worthwhile to observe, however, that - particularly with regard to the push system - the model's performance may
be over-estimated. In fact, if we should remove the hypothesis that only a product-code is manufactured, we would
have not only to consider the absolute quantity of inventories (i.e. "Inventory_3" value), but also whether such
quantity is balanced on different kinds of product-codes in stock.

YW) FLL

Fig. 5: Main results from a simulation run of the pull (on the left) and push model (on the right).
5. CONCLUSIONS

A next development of this research will be oriented to include in the system's boundaries also multiple product-
codes and bottlenecks.

System Dynamics will be also used to support managerial learning about the system's behaviour in reacting to
external "shocks" (i.e. sudden demand changes, bottlenecks, etc.) and how delays, non-linearities and feedbacks
may affect master variables performance over time.

6. REFERENCES

- Monden Y. , “Toyota production System : Practical Approach to management". Industrial Engineering and
Management Press. Norcross. 1983.

- Hall R.W., "Syncro MRP : Combining Kanban and MRP - The Yamaha PYMAC System". |.E.M.P. 1986.

ISDC '97 CD Sponsor HPS

Metadata

Resource Type:
Document
Rights:
Date Uploaded:
December 18, 2019

Using these materials

Access:
The archives are open to the public and anyone is welcome to visit and view the collections.
Collection restrictions:
Access to this collection is unrestricted unless otherwide denoted.
Collection terms of access:
https://creativecommons.org/licenses/by/4.0/

Access options

Ask an Archivist

Ask a question or schedule an individualized meeting to discuss archival materials and potential research needs.

Schedule a Visit

Archival materials can be viewed in-person in our reading room. We recommend making an appointment to ensure materials are available when you arrive.