Modeling E-Material Supply Chain
Heba Abdel Fattah Mohamed Saleh Pal Davidsen
Information Technology Decision Support System Dynamics Group
Institute Department University of Bergen
Cairo, Egypt Cairo University Email: davidsen@ifi.uib.no
Email: hibahfOidscnet.eg Email: msaleh@idsc.net.eg
Abstract
This paper looks at the issue of E-Learning provision from a supply chain perspective. It
tries to apply some of the commonly used supply chain practices like Inventory
Management, Cost reduction and Demand Forecasting to the content assets created by e-
learning organizations. In this context the study presents a system dynamics framework
to model the Information Technology Institute (ITI) e-material supply chain as a case
study of digital product supply chain. This e-material supply chain serves a foundation
of providing e-learning programs. The aim of this study is to understand the dynamic
structure of this e-material supply chain and hence suggest and evaluate possible policies
to enhance its current performance. The first section is an overview of the e-material
supply chain. The second defines the problem with the ITI e-material supply chain. The
third section is for literature review. The fourth describes the model and the fifth discuss
the model behavior. A list of suggested policies is evaluated to increase the e-material
supply chain performance and decrease the associated costs in the sixth section. In the
last section we conclude.
Keywords: E-learning, E-Material, Supply Chain Management, System Dynamics, E-
Material Supply Chain, Egypt.
1. Overview of the e-material supply chain
A supply chain of a certain product or a service essentially has three main parts, the
supply, manufacturing and distribution: The supply side concentrates on how, where
from and when raw materials are procured and supplied to manufacturing.
Manufacturing converts these raw materials to finished products and Distribution
ensures that these finished products reach the final customers through a network of
distributors, warehouses and retailers.
The e-material provision for e-learning purposes encompasses the manufacturing and
distribution of e-courses and services and the technologies that underpin these
activities. This paper looks at the issue of e-material provision from a supply chain
perspective. It tries to apply some of the commonly used supply chain practices like
Inventory Management, Cost reduction and Demand Forecasting to the content assets
created by e-learning organizations.
In the e-material supply chain as illustrated in figure 1, the supply side matches the
process of writing material that could be published online for remote teaching and
revising it to be sure that it meets the accepted quality level. The process of
transforming this raw material into an e-material that could be published on an e-
learning tool and the online instruction of this material matches the manufacturing side
of the supply chain. Distribution in the digital services and products and specially e-
learning is usually done through online catalogues (e-catalogue) that are found on the
online stores of the e-learning websites. In an e-catalogue students browse courses
offered to choose from which most suit there needs. They buy access to the e-material
published on the e-learning management system till they graduate.
ae ee
Planning
eerie
Selection
= =a
E-Li i
Interactivity Masiageniet
: Tools
[mm He
Figure 1, E-material supply chain
Die
The very essence of Supply Chain Management is effective information and material
flow throughout a network of customers and suppliers. Supply chain management
involves coordinating and integrating these flows. The product flow includes the
movement of goods from a supplier to a customer, as well as any customer returns or
service needs. The information flow involves transmitting orders and updating the
status of delivery. The financial flow consists of credit terms, payment schedules, and
consignment and title ownership arrangements. Figure 2 shows how material, funds
and information flows across the e-material supply chain. The red arrows represent the
material flow, blue arrows represent the flow of information and the black arrows
shows the flow of funds across the supply chain.
E-Material : Students
Planning E-catalogue
ER E-graduates
Authors b
Selection :
Authoring
E-Learning
Management
Figure 2, E-material supply chain information, material and funds flows
Information flow (blue arrows) starts by planning the online curriculum that is
demanded by e-students. The information continues flowing along the authoring and
material revision and is passed to the manufacturing side, then settle on the e-
catalogue. Students' start to gather information about online material and buy access to
e-material. Physical product or Material (red arrows) passes by three phases. In phase
one selected instructors are asked to write the courses of the online curriculum. The
second phase is concerned by transforming the authored material into a published
material and assembling it with online instruction and interactivity tools. And finally
the material is distributed over a website to be available for students to logon and
study. Costs (black arrows) accumulate each step in the supply chain and funds are
raised by students’ registration and payment to the e-learning services they acquire.
Effectively managing these flows can impact virtually all e-material supply chain,
leading to profitable policies for continuous improvements in areas such as data
accuracy, improving material quality, reducing lead times and reductions in operational
complexity. Other benefits include:
= Improved delivery performance—quicker customer response and fulfillment
rates especially in the field of IT which is changing very rapidly
= Greater productivity and lower costs
= Reduced inventory throughout the chain
= Improved forecasting precision of demand
= Enhanced inter-operational communications and cooperation
* More reliable financial information.
2. Problem definition
2.1, The History of the Information Technology Institute
The Information Technology Institute (ITI) is a national institute established in 1993 by
the Information and Decision Support Center (IDSC) under the auspice of the Egyptian
Cabinet. It provides specialized software development programs to fresh graduates, as
well as professional training programs and IT courses for the Egyptian Government,
ministries, and local decision support centers. In 1996, ITI launched its second branch in
Alexandria to facilitate the widespread of Information Technology throughout the
country, and expand the outreach of ITI. In April 2005, Prime Minister Dr. Ahmed Nazif
transferred the dependency of Information Technology Institute (ITI) to Ministry of
Communications and Information Technology (MCIT). ITI has a board of trustees which
is headed by His Excellency the Minister of Communications and Information
Technology, Dr. Tarek Kamel. The board members include experts from the MCIT,
academia, and information and telecommunication companies.
Over the past 12 years, ITI has supplied the Local, Regional and International markets
with highly-trained professionals in various IT domains, following a 9-month intensive
training program. Those graduates make up the backbone of the IT workforce in Egypt.
In addition, ITI through its governmental training program has trained 50 thousands
Governmental Employees and supervised the training of Over 400 thousands in
Governorates' Training Centers.
2.2. Overview of the ITI's E-learning Program (VITI)
Due to the fact that the number of applicants exceed the institute’s available resources
and in order to satisfy the needs of the working class who wish to learn after working
hours, ITI wanted to publish its courses on the Internet to reach more students at their
leisure time and place limitation; helping in this respect to spread software technology
to all those in demand of such courses. The thought materialized early 1998 in one of the
graduation projects of the ninth intake at the ITI by four ITIans, who made the first
prototype for online teaching project and called it “Global Campus”. There were lots of
edie
trials afterwards and by the end of 1999 this project reappeared again headed by one of
the members of the Global Campus project (which is also one of the authors of this
paper) and finally delivered the first course.
In 2001, the project launched a more enhanced website version which included 20
online courses in Arabic and English for free. This was mainly to increase the awareness
of Arabs about e-learning. In this year also the ITI e-learning website was chosen as one
of the best 20 international projects on e-learning in Stockholm Challenge Award 2001.
The most important criterion in this international competition is how the project
benefits people, the society and the environment.
The first online diploma from the ITI was offered commercially by December 2003, and
the online learning process started by 2004. This online diploma was offered through
the "Virtual ITI portal” (also called VITI) (http://www.viti.gov.eg). The program offers
state-of-the-art training in the software development field. The strategy of the program
is to be demand-oriented utilizing the current technology trends in the international
software industry and conforming to the world-class professional standards. It aims at
producing professional information technology specialists ready to contribute to the
realm of information engineering and professional software development.
The online Program consists of the following three modules:
1. The Foundation Module — Fundamentals.
2. The Focus Module — Specialization.
3. The Performance Module - Project.
The online Focus Module branches into 3 different specializations, each with a unique
set of training courses where students have to choose one from the following tracks:
= System Development (SD).
= Java.
= Multimedia (MM).
This current phase of the e-learning program had many problems concerning internet
bandwidth and students’ culture that resist self training and are still seeking
instructional learning. These problems were common for any e-learning program, but
the real problems that faced the program was a lot of critiques concerning the type of
material offered, quality of the material, demand for more courses and demand for
newer versions of the existing online courses. These problems were mainly coming from
the lack of experience in a new field like e-learning that lead to inadequate performance
of the production processes and long production times. Production time for an
electronic course (e-course) takes more than 6 months from the time an instructor starts
to write the course material till the time it is deployed on the VITI portal to be
distributed to online students. This period is too long and contains 5 different
production sub-processes; each is dependent on the pervious process and requires
different skills in the assigned labor. As a new experience for ITI instructors to write
online material, the written material contains many technical errors and linguistic
errors, which required adding two processes of technical and language revision to be
performed. For transferring this written material into an electronic form, two extra
processes are required; developing the written material into an electronic form and
ale
testing the usability and functionality of the courses. In addition to adding a number of
e-learning interactivity tools to overcome the quality of the e-material offered. The
bright side of these modifications was that the produced e-material reached the fifth
level of Guerra scale. The scale outlines the range of online content that we can use. It
describes an increasingly interactive user experience using a one-to-ten scale, in which
“one” involves the common experience of simply reading text on a screen and “ten”
represents a virtual reality scenario.
2.3. Main Problems
As an early adopter to e-learning programs, the Institute took the risk of adopting an e-
learning initiative in Egypt at a time when the number of internet users was only
around 120,000 back at 1998. Figure 3 shows the massive increase in the numbers of
internet users in Egypt over the past five years. There was a debate on whether it was
best for the ITI to proceed with the e-learning program or close it, this debate was not
only at the beginning of the project but lasted a couple of years later. But its strong
vision and belief of the importance of introducing e-learning to the Egyptian training
market made the ITI persist on keeping the program till this day.
Million
2000 2001 2002 2003 2004 August 2005
Figure 3, Internet users in Egypt,
Source: The Egyptian Ministry of Communication and Information Technology
(MCIT) website.
From its very beginning there were a lot of problems that faced this program like
problems in quality and delivery time of the electronic material supplied, high software
development cost, failure to meet development schedules with the required quality, etc.
These problems accumulated and grown bigger over the years as a result of the
following obstacles:
1. Lack of past experience in e-learning: not just in Egypt but in the global market.
2. As a new concept and not yet known in most of the countries, there was no
demand for e-learning in Egypt. The ITI had to initiate a demand on e-learning.
3. Even if the ITI was to spread the knowledge of e-learning among Egyptians, there
was demand uncertainty on who would prefer to shift from traditional teaching to
remote teaching (culture shift).
4. Lack of supply chain management practices: the ITI did not apply the concepts of
supply chain management on its processes of providing e-learning to the Egyptian
training market.
5. Information and Communication Technology (ICT) infrastructure was not yet
mature back then.
As for obstacle 5, it has been eliminated by the establishment of the Ministry of
Information and Communication (MCIT) at 2001 that created noticeable improvement
in the internet society in Egypt because of the telecommunication infrastructure
expansions and the ministry's initiatives in offering computers in low prices and the
internet freely for the Egyptians.
Obstacles 1 and 2 had their highest effects in the earlier years of the e-learning program,
but as the first version was disseminated in 2001 for free, a lot of Internet users logged
on the site from different countries and got used to the idea of online education. The
effects of these two obstacles nearly disappeared when the program got its first
international recognition and was chosen as one of the best 20 international projects on
e-learning in Stockholm Challenge Award 2001.
Yet there are demand uncertainty and lack of supply chain practices obstacles to be
conquered. Supply chain management is a technique that considers all aspects that lets
an organization gets the right goods and services to the place they're needed at the right
time, in the proper quantity and at an acceptable cost. Efficiently managing this process
involves overseeing relationships with suppliers and customers, controlling inventory,
forecasting demand and getting constant feedback on what's happening at every link in
the chain.
In real world, things are not that easy as "Choose a policy, and then apply it" or "Apply
this policy, it is a successful one". Consequences of applying a policy (that seemed the
right one and turned to be not) could cost organizations million of pounds. This calls for
further work in the step of designing policies and evaluating them for successful supply
chain implementation.
A system dynamic method is also suggested. Using the system dynamics method, we
should be able to understand the nature of the complexity governing the real world; i.e.
how structure drives behavior and how the resulting behavior causes shifts in structural
dominance in complex nonlinear, dynamics systems. This would then serve as a
foundation for policy design and strategy development and, thus for the management
of complex, dynamic ITI e-learning supply chain successfully.
As the ITI e-material supply chain suggested is a good example to research as supply,
manufacturing and distribution along with students’ management are for the most part
processed and developed at the ITI which make it easier to study and thus manage. The
purpose of this study is to understand the dynamics and the complexity of the e-
learning supply chain management by taking the electronic material (e-material) supply
chain at ITI as an example. The emphasis is on how might ITI benefit from system
dynamic techniques in understanding its e-material supply chain and hence implement
more powerful corrective policies concerning the overall performance of its e-material
supply chain.
The objective of this research is to:
¢ Study the e-material supply chain at the ITI and evaluate possible policies to
enhance its performance.
3. Literature Review
Historically the usage of system dynamics to analyze and explain issues evolving
around supply chain management started by Forrester (1961). He developed a
continuous time mathematical model of the dynamic production and distribution
process. It has been shown that the factory production rate often fluctuates more widely
than the fluctuation in the retail consumption rate. This phenomena is called the
bullwhip effect.
Huang et al. (2003) provides a rich review on supply chain dynamics literature,
investigating the impacts of information sharing and supply chain structure. Riddalls
and Bennett (2002) have modeled the aggregated production-inventory system by
assuming pure production delays. The dynamics was also evaluated on supply chains
by cascading such production inventory systems. Tomlin (1999) has analyzed capacity
investments in single-product supply chains in which the participants make
investments to maximize their individual expected profits. The solution approaches to
capacity decisions in multiple products; multiple stage supply chain is also described.
But the method works under demand patterns that assure an upper bound stock out.
Helo (2000) deals with demand magnification, tradeoff between capacity utilization and
lead times under capacity constraints and concludes that capacity utilization is an
important factor and can be used as a substitute for inventory.
Akkermans and Dellaert (2005) describe the evolution of the research into supply chains
by using the same distinction that Holweg and Disney (2005) made in their description
of the evolving frontiers of the bullwhip problem. They distinguish three
methodological domains in supply chain research: (1) the discrete time approach; (2) the
continuous time approach; and (3) the control theory approach, also known as the
frequency domain approach.
The discrete time approach is the most popular approach in the Production and
Inventory Control environment, assuming periodic (daily, weekly) decisions on
production and order quantities, and expressing lead-times, capacity and demand also
in relation to the duration of the decision periods. Within the continuous time approach,
Jay Forrester was the founding father of the system dynamics approach, which was
originally applied in supply chain dynamics problems (Forrester 1958, 1961). In these
models the states of the supply chain system (inventories, orders in pipeline, work in
progress) are monitored continuously and also decisions are taken continuously.
Different from the discrete time approach, capacity is explicitly modeled in many
applications (Mass 1975), as well as learning effects and human perception. Control
theory may assume either continuous or discrete time and typically uses linear transfer
functions and transformations to relate the system output to the system input. Its
contribution is usually aiming at production smoothing.
The three approaches are used for quantitative analysis of supply chains, but the
analysis often differs with respect to assumptions and also with respect to the goals to
be achieved. This paper follows the continuous time approach as system dynamics
approach can easily incorporate all kinds of elements to re-engineer the supply chain
(Sterman 2000, p. 741), and is thus not only successful in explaining supply chain
behavior, but also in providing valuable insights in the process improvement phase.
Table 2.1 -- which was provided by Angerhofer (2000) -- shows the various techniques
and methods applied in different research areas, whether in theory building, or problem
solving, or improving the modeling approach.
Category Research: Practice: Putting Research
Modeling Modeling for into Practice:
for Problem Improving the
Theory Solving Modeling
Building Approach
Research Area
Inventory Management (b)
Demand Amplification (b) (b)
Supply Chain Re-Engineering —_(a)(b)(c) (a)(b)(c) (a)(b)(c)
Supply Chain Design a) @bV(o) (ay(by(o)
International Supply Chain (a) (a)(b)(c) (a)(b)(c)(d)
Management
Key to Table 1: Techniques and Methods applied
(a) Causal Loop Diagramming
(b) Continuous simulation
(c) OR techniques
(d) Discrete simulation
Table 1, Taxonomy of Research and Development in Modeling Supply Chain
Management
This study proposes to expand the literature on dynamic simulation of supply chain
analysis and design to include digital products. Our problem of exploring the e-material
supply chain and designing structure to minimize the supply chain costs falls under the
research areas of Inventory Management and Supply Chain Design.
4. Model overview
4.1 The model subsystems
In this study a simulation model for the e-material supply chain has been formulated
based on Sterman’s (2000) generic model for demonstrating supply chain dynamics. The
adie
main concern of this model is to explore effective policies that could enhance the e-
material supply chain performance and reduce the associated costs. For that reason the
model includes a group of sequential processes that start with the material production
planning process, passes by the printable material production (supply part), then e-
material production (manufacturing part) as well as the associated physical aspects of
the production and the costs accumulated. Figure 4 sketches the model subsystems
which are the production planning, printable material production supply, e-material
production and the associated manpower and costs co-flows. Each of these processes is
divided into a number of sub-processes. The printable material production is divided
into three sequential sub-processes; writing, technical revision and language revision.
The e-material production is also divided into two sequential sub-processes, developing
and testing. In the model, we used co-flow structures to capture the amount of man-
hour needed and the costs associated with each sub-process. In the following sections
we will discuss each sub-model and its sub-processes.
Fig 4, the ITI E-Material Supply Chain Model - Subsystems Overview
The various model subsystems will be discussed in the following sections but due to the
limited space of this paper and as the structure is quite big -- as the model includes
more than 260 variables -- we will only illustrate the main features of the model. The
stock and flow diagram of the model is portrayed in Appendix A.
4.2. The Production planning process:
Printable production depends on the ‘printable’ labor available and their productivity.
E-material production also depends on e-material labor available and their productivity,
and is constrained to the availability of printable material supply. The demand for e-
material — which is set by the ITI management — is the driving force for the production
planning process. Note that demand, in this context, refers to the demand for new
courses or new versions of existing courses. Figure 5 portrays the causal loop for this
process.
aAQ'=
E-Material
/
E-Material Ag} E-Material
_—— Production Backlog E-Material
E-material Labor pr % x S Demand
E-material Labor
Productivity Printable
ee Printable Material
bl: Demand
Printal
rintable Labor Printable AB) Printablest
+ Production
Printable Labor + Backlog
Productivity
Figure 5, Causal loop for the production planning process.
4.3. Printable material production process (supply Part)
The printable material production process consists of three consequential sub-processes,
writing, technical revision and language revision and the associated man-hour and costs
co-flows as shown in figure 6. Printable material production starts by the writing
process. The written material then are transferred to a technical revision process where
written courses are either approved and transferred to a language revision process or
returned again to the writing process for error corrections. After linguistically revising
the courses, they are either returned for technical revision — if errors are discovered — or
else approved as a printable material which could then be sent to e-material production.
process. Associated man-hour and costs that accumulates through each point in theses
sub-process are also modeled.
Figure 6, Printable Material Production Processes
ald =
4.4, E-Material Production Process (Production Part)
E-Material production process consists of two consecutive processes; development and
testing as shown in figure 7. E-Material production is limited to material supplied
availability, available labor and the available work week hours. Production is initiated
by a desire to fill the gab between the production inventory and the desired inventory.
The production process starts by the development process and ends by a testing process
before it can be totally approved as an e-material. Developed courses that are
transferred to testing process are either approved as an e-material or returned back to
development process for error correction. Again associated man-hour and costs that
accumulates through each point in theses sub-process are also modeled.
Figure 7, E-Material Production Sub-Processes
4.5. Sub-process causal loops
Each of the three sub-processes of printable material production and the two sub-
processes of e-material production is a stock management structure that includes a
supply line of uncompleted courses. Production supply is the buildup overtime of the
production rate, which is limited by the production capacity. Production backlog is the
gab between the desired and actual production inventory. The causal (feedback) loops
responsible for any of these production sub-processes will be explained below by taking
the writing process as an example. For example, figure 8 shows the causal loops that
dominate the writing production process. Writing is initiated to fill the gap between
‘desired written courses’ and the actually written courses. But production is limited to
the ‘writing’ labor, their productivity, and the available time for writing (measured in
hours per week), which is a function of writing schedule pressure.
The written courses are transferred to the technical revision sub-process for review.
Writing errors which are discovered by technical revision are returned to the writing
sub-process (courses' authors) to be corrected.
In Figure 8, the red loops explain the mechanism that causes writing errors and the
corrections taken if these errors exceed acceptable error levels. The writing labor skills
and the schedule pressure affect the writing performance (which is measured by the
number of errors produced). Technical revisers then compare the writing errors to the
a2 =
acceptable error levels; if they exceed the acceptable, the courses are returned to the
authors for error correction. Acceptable error levels are set by ITI to measure the quality
of the written course; it is usually set upon asking students’ on their feedback of the
acceptable level of errors in the course.
Acceptable ei ee
a
Writing ~~ *% Writing «<—_—
é Courses to <=
Error Levels Errors ™ ere
be re-written r we \
AR) \
Writing / Desired x \
cum ME Le
ye r_ Courses Courses \ Writing
Re-writing to \ Labor Skills
Correct Enos N53) 7 *
N+ Writing Writing Writing
"Production Backlog Backlog
[eed
+ j
Desired }
Ws + Writing Writing /
riting
Productivity Production Ass Production
Capacity Bi yu
f + Ft Writing /
Capacity + Y
Writing Writing Schedule
Labor Pressure
Writing to
Work Week
Figure 8, Causal loop for writing production and correction
5. Model behavior
5.1. Validation and diagnosis
After structurally validating the model, we behaviorally validated it by setting the
‘simulation start time’ to January 1 2003 (which was the real start time for this supply
chain); and running the model till January 1* 2005; then comparing the simulated
behavior to the real behavior of some key variables. In this section, we present this
behavior validation process, and the analysis of the behavior in order diagnose the
system — i.e. identify the major problem in the system. Such a diagnosis is important in
order to prescribe the proper treatment (i.e. policies), as illustrated in section 6. In
section 5.1, we will focus on the printable material sub-model, while in section 5.2 we
will focus on the e-material sub-model.
AAS =
5.2. Printable material production
Figures 9 and 10 compare the behavior of the simulated printable material stock, and
the associated simulated cost, to the real ITI printable stock, and the associated real cost.
Looking at these figures, reveal that the outputs of the model have the same pattern as
the real data.
250
200
Courses
50
0
Feb-03 May-03 Aug-03 Nov-03 Feb-04 May-04 Aug-04 —Nov-04
—¢— TIPrintable Material Stock —2— Modeled Printable Material
Figure 9, Real printable material courses compared to simulated courses
‘Thousands LE
Feb-03 May-03 Aug-03 Nov-03 Feb-04 May-04 Aug-04 —Nov-04
[FET Printable Material Costs —s— Modeled Printable Material Costs |
Figure 10, Real accumulated printable material costs compared to simulated costs
Below we are going to analyze the above figure using the various simulation results.
The key issue — as portrayed in figure 11 — is that the accumulated amount of work
spent to produce (accepted) printable material (which serves as the foundation for the
various e-courses) is much greater than the accumulated amount of work spent to
produce the written material . The difference is the amount of work done to overcome
the writing errors. The hours spent to overcome writing errors are more than triple the
amount of work to write the material. By the end of simulation, average man-hours
spent on writing a course are around 225 hours, while average man-hours to reach a
technically and linguistically revised and accepted course is around 690. In short,
-14-
‘writing errors’ is a major problem in the system; for this reason, in the policy analysis
section we will devise new policies to overcome this major problem.
Note that each sub-process has a different production time and a different error level.
Writing a course takes 12 weeks and the returned material from technical revision is
around 50%. Meanwhile, a course technical revision is done in 4 weeks and the returned.
material from language revision is around 37%. While language revision takes only 2
weeks for the course and is the last process in the printable material production
processes.
4000
3000
2000
ManAteek
2 2 PS 2 Pd # F B o
CLE LFSEE PE PEPE
Time
— Written Material —=— Printable Matera! |
Figure 11, Accumulated amount of work for printable (acceptable) material vs. that of
written material
Costs are calculated as a function of the man-hour spent to perform the various tasks,
and include salaries of labor and the costs of resources required for these labors to
perform the tasks. Consequently, costs accumulate in similar behavior to man-hour
accumulation.
1600
1400
1200
1000
800
600
400
200
FEO PS PSO SP SS
[= cost to finished wrt —s— cost to printable material ]
Figure 12, Accumulated Costs of Printable material vs. that of written material
245 =
Figure 12 shows the difference between the costs to write courses and the costs to
improve the written course quality by correcting technical and linguistic errors.
Average money spent on writing a course is around 2475 LE, while average money to
reach a technically and linguistically revised and accepted course is 7234 LE (more than
triple the amount needed to write the course).
5.2. E-Material production
Figure 13 compares the real stock of e-material courses to its corresponding simulated
stock in the model; by the end of the 2 years simulation the e-courses reached 94 e-
courses, while the actual number of courses is 90 e-courses. The simulated accumulated
cost of producing those e-courses reached around 2 millions LE which is the same as the
real costs.
Feb-03 May-03 Aug-03 Nov-03 Feb-04 May-04 Aug-04 Nov-04
[== Eweterial Stock —s— Modeled E Material |
Figure 13, Real e-material courses compared to simulated courses
Figure 14 shows the behavior of the cost accumulation due to development only and
that accumulated due to all processes done to produce an accepted e-material. The
difference between the two curves is the amount of money needed to detect and correct
development errors -- i.e. testing and debugging. So ‘development errors’ is also a
major problem in the system. Note that these e-material costs do not include the costs of
the produced printable material; but only the costs of additional work done to
transform the printable material to the digital form.
at6ix
Thousands LE
° 2 2 SS ¢ Ss FF FS £ =
Ff FF KF HF FF KF F KF SK
Time
[Hee cest ic finished ev Sa cost o=meteris! |
Figure 14, Accumulated Costs of producing accepted e-material vs. that of
development only.
6. Policy analysis
6.1. Overview
The aim of the model is to understand the structure of the e-material supply chain; this
set the stage to test and evaluate different policies that would reduce costs, while taking
into consideration the production supply line stability (reduce production inventories
oscillations). Actually the ITI thought of different policies to improve the e-material
supply chain. But testing a policy before applying it was not possible without the help
of a model to assess such policy. Using the model we can evaluate the suggested
policies, and thus choose what best suits the ITI e-material supply chain. The ITI
management had some initial thoughts about two policies that could reduce cost and
enhance the quality of the courses (i.e. reduce the errors). One policy is to relate the
salary to the number of errors produced. The other is to train instructors to improve
their production skills. Each policy is introduced to the model, at the start of 2005, and
then at the end of 2006, the results are compared to the corresponding results in the base
run.
The following discussion shows how each policy affects model behavior. At the end of
this section, we will summarize the results of each policy, in order to compare the
different policies.
6.2. Salary Policy
This policy suggests that the salary becomes a function of the errors produced; i.e. to
deduct an amount from the salary proportional to the errors produced by an instructor.
This policy was introduced, to the model, at the start of year 2005, and its effect was
evaluated after years (i.e. at the end of 2006). Figure 15 compares the behavior of the
=19 =
accumulated costs of e-material in the base run with the corresponding behavior in the
salary policy.
2900
2700
2500
2300
2100
Thousands LE
1900
1700
1500 +
Feb-05 Aug-05 Feb-06 Aug-06
—e— Base run —m— Policy 1
Figure 15, Accumulated Costs of e-material - base run vs. salary policy
This policy succeeded in slightly reducing costs. Note that despite that the average cost
of course writing was reduced by 32 % (due to salary deductions), the accumulated
costs of the printable material was only reduced by 5 %; this is mainly because we still
have a large number of errors in the written courses even after introducing this policy.
In a similar fashion, the average cost of course development was reduced by 12%,
however the accumulated e-material costs was only reduced by 2%. So, as a conclusion,
this policy alone was not able to solve the major problems of ‘writing errors’ and
‘development errors’. In other words, you cannot solve problems by punishment alone.
You must tackle the root causes of the problem — i.e. you must understand why the ITI
instructors make errors. This is mainly because errors results from the inadequate skills
of ITI instructors in e-material authoring. They may be excellent instructors in direct
teaching, but their skills in e-material authoring needs improvement. In the next session
we will discuss a training policy, to increase ITI e-material authoring skills.
6.3. Training Policy
This policy is also introduced at the beginning of year 2005. The suggested training
should be effective enough to increase performance (i.e. reduce errors) and reduce
production time. The ITI is currently studying training offers in this context. The
training companies claim that their training would affect the average individual
performance with a certain level. It is estimated that, on the average, training the
instructors who perform writing reduces writing error with more than 20% and reduces
writing time by 15%, technical revisers training reduces technical revision errors by 5%
and the reduces technical revision time by 5%, while training developers also reduces
development errors by 5% and reduces the development time by 5%. Yet the overall
performance of the system has to be evaluated after assuming these enhancements in
the individuals’ performance; thus in the model we changed average errors and
aAS =
production times to reflect the improvements offered by training, and then made a
simulation run. The table below summarizes the effect of applying this policy:
Jariables
Average Man-hour for printable material 19% Reduction
Total Man-Hour For Printable Material (Man-Hour) 19% Reduction
Total Costs For Printable Material (LE) 19% Reduction
Average man-hour for e-material 7% Reduction
Total Man-Hour For e-Material Production (Man-Hour) 7% Reduction
Total Costs For e-Material Production (LE) 6% Reduction
Table 2: Effect of Training Policy on Key Variables
6.4. Combining the two policies
Applying the salary policy will affect the instructors’ salaries; this will eventually
motivate the instructors to improve their skills in an attempt to increase their income. So
the instructors will seize any training opportunity that can enhance their skills. So, in
the model, we combined the two policies to see the effect on the overall performance of
the ITI e-material supply chain. As indicated by the table below, combining both
policies would lead to better results. The beauty of these simulation experiments is that
they produce quantifiable results for the expected improvements of introducing each
policy.
Average Man-hour for
printable material No Effect 19% Reduction 19% Reduction
Total Costs For Printable
Material (LE) 5% Reduction 19% Reduction 21% Reduction
Average man-hour for e-
material No Effect 7% Reduction 7% Reduction
Total Costs For e-Material
Production (LE) 2% Reduction 6% Reduction 7% Reduction
Table 3: Policy Benchmarking
7. Conclusion
This study aimed at understanding the dynamics and complexity of the ITI e-material
supply chain. Through the study a system dynamic model was build to reveal the
underling structure of this supply chain and to evaluate different policies which could
help increase its overall performance. The model provides a very good tool for
answering the research questions. The model succeeded in understanding the nature of
-19-
the e-material supply chain at the ITI, and revealed that the long production times and
costs are mainly due to the rework associated with correcting production errors. While
it seems that ITI succeeded on the short run in raising the quality of its e-content by
adding several revision and quality assurance procedures, but on the long run this will
lead to increased costs and heavy production schedules to correct the errors discovered
by the revisers. A long term actions must be considered. Several policies were suggested
to enhance performance and reduce costs. These polices included relating labor salaries
to the production performance, training labor to increase performance and reduce long
production times, and the combination of both policies. Each policy was discussed and
evaluated. Salary policy has a significant effect on cost, while the training policy has a
significant effect on reducing production time -- by reducing rework -- and
consequently costs. Combining the two policies leads to combining the successful
results of both policies, and thus we suggest applying both policies at the same time to
improve ITI e-material supply chain performance.
Future work could enhance the model structure by adding a sub-model for capacity
formation (i.e. hiring new staff), or could extend the model boundary to include the e-
students behavior and e-learning market, or could extend policy analysis to suggest and
evaluate other policies. Moreover, the simulation model built could be adapted to any
similar e-content supply chain with an authoring production process and quality
assurance processes.
=20-
References
= Angerhofer B. J., 2000, “System dynamics modeling in supply chain management:
Research review”, Proceedings of the 2000 Winter Simulation Conference, 342-351.
* Asgarkhani, M., 2003a, “A Strategic Approach to Knowledge Management and
Learning in the Information Age”, Proceedings of the 2"* European Conference on e-
Learning - Glasgow, pp 59-70.
* Asgarkhani, M., 2003b, “Web-Assisted Teaching and Learning: A Study of Current
Trends and Issues for Future Consideration”, The New Zealand Journal of Applied
Computing and Information Technology, Vol 7, No. 1, pp7-10.
* Aviv, Y., 2001, “The effect of collaborative forecasting on supply chain
performance”, Management Science 47, pp. 1326-1343.
= Chen F., Z. Drezner, J. K. Ryan and D. Simchi-Levi, 2000, “Quantifying the bullwhip
effect in a simple supply chain: The impact of forecasting, lead times, and
information”, Management Science 46, pp. 436-443.
= Christopher, M., 1998, "Logistics and Supply Chain Management: Strategies for
reducing cost and improving service", London, Financial Times Pitman Publishing.
= Cooper, M. C., Lambert, D. M., et al., 1998, "Supply Chain Management: More than a
new name for Logistics." The International Journal of Logistics Management, 8(1): 1-
13.
= Dejonckheere J., S. M. Disney, M. R. Lambrecht and D. R. Towill, 2002, “Transfer
function analysis of forecasting induced bullwhip in supply chains”, International
Journal of Production Economics 78, pp. 133-144.
= Dejonckheere J., Disney, S. M., Lambrecht, M. R. and Towill, D. R., 2003, “Measuring
and avoiding the bullwhip effect: A control theoretic approach”, European Journal
of Operational Research 147, pp. 567-590.
= Delio, M., 2000, "Report: Online Training ‘Boring’". Wired News, located at
http://www.wired.com/news/business/0,1367,385 04,00.html.
* Drinis, E.; Corrigan, A., _2004,"Confessions of an e-learner: why the course paradigm
is all wrong",
http://www.onlinelearningmag.com/onlinelearning/reports_analysis/feature_displa
y.jsp?vnu_content_id=1457218.
* Dublin, L., and Cross, J., May 2003,"Implementing e-Learning: getting the most from
your e-learning investment", Presentation at the ASTD International Conference.
«Forrester J. W., 1961,"Industrial Dynamics", MIT Press, Cambridge.
* Freriks, T., 2004,"ROI and Justification of E-Learning." LIMRA's MarketFacts
Quarterly, Vol.23 No. 1, p. 30.
= Gary, W., 2004,"Where is the Learning in E-learning?", Operintel cooperation.
= Gilbert, S. and Jones, S., 2001, “E-learning is e-nourmous: Training over the Internet
has become the fastest growing workplace performance improvement tool---and
utilities are using it in several ways”, Electric Perspective, Vol. 26 No.3, May/June
pp.66-82.
= Giménez, C., Lourengo, H. R., 2004,"E-Supply Chain Management: Review,
Implications And Directions For Future Research", Research Group in Business
Logistics GREL- IET, Department of Economics & Business, Universitat Pompeu
Fabra, Ramon Trias Fargas, 25-27. 08005 Barcelona, Spain.
=21 -
Guerra, T., and Heffernan, D., March 2004,"The Guerra Scale", Learning Circuits
website, http://www.learningcircuits.org/2004/mar2004/guerra.htm.
Heath, J., 2003, “Creating Your e-Learning Strategy”, [online].
Helo, P. T., 2000, “Dynamic modeling of surge effect and capacity limitation in
supply chains”, International Journal of Production Research 38, pp. 4521-4533.
Huang G. Q,, J. S. K. Lau and K. L. Mak, 2003, “The impacts of sharing production
information on supply chain dynamics: a review of the literature”, International
Journal of Production Research 41, pp. 1483-1517.
Jeske, M. and Grant, R., 2003, “Corporate E-learning: Identifying and Studying Key
Management Issues”, Proceedings of the 4th Annual Congress on Management of E-
Business, Milena.
Johnson, M. E. and S. Whang, 2003, “e-Business and Supply Chain Management: An
Overview and framework,” Production and Operations Management, Vol. 11, No. 4.
Kamath B., Roy Rahul, 2005,"Supply Chain Structure Design for a Short Lifecycle
Product: A Loop Dominance Based Analysis", 38th Hawaii International Conference
on System Sciences.
Kopezak, L.R. and M.E. Johnson, spring 2003' “The Supply- Chain Management
Effect: How Supply Chain Management Is Changing Managers’ Thinking,” Sloan
Management Review.
Kruse, K. (a). "Beyond Kirkpatrick: Measuring the Financial Returns of E-Learning.”
e- LearningGuru.com http://www.elearningguru.com/articles/art5_1.htm.
Kruse, K. (b). "Enough Already. Getting Off the ROI Bandwagon." e-
LearningGuru.com http://www.e-learningguru.com/articles.htm.
Learn Frame, August 2000 ,“Facts, Figures and Forces Behind e-Learning —
http://www.learnframe.com/aboutelearning/page2.asp.
Lee, H., Padmanabhan, V. and Whang, S., 1997, “Information distortion in a supply
chain: the bullwhip effect”, Management Science 43, pp. 546-558.
Beckstrom, M., Croasdale, H., Riad, S., and Kamel, M., March 2004, "Assessment of
Egypt's e-Learning Readiness", presented at University of Bristol.
Peters, K., 2005, "Environmental Scan Research Paper to inform the 2005 E-learning
for Target Learner Groups Project", E-learning for Target Learner Groups — Youth,
http://flexiblelearning.net.au.
Peters, K., Lloyd, C., 2003, "Differentiating Needs: Customer demand for online
learning", http://www .ncver.edu.au/research/proj/nr2f02.pdf.
Prensky, M. , 2001, "Digital Natives, Digital Immigrants",
http://www.marcprensky.com/writing/Prensky%20-
%20Digital%20Natives, %20Digital%20Immigrants%20-%20Part1.pdf.
Reeve, S. and Flowers, S., 1999, "The shape of things to come: a discussion on the
nature of the technologised higher education institution", Proceedings from the 10th
annual CTI-AFM Conference.
Richardson, W., 2004, "Blogging and RSS — The "What's It?" and "How To" of
Powerful New Web Tools for Educators",
http://www. infotoday.com/MMSchools/jan04/richardson.shtml.
Riddalls, C. E. and Bennett, S., 2002, “Production-inventory system controller design
and supply chain dynamics”, International Journal of Systems Science 33, pp. 181-
195.
m2 =
* Simchi-Levi, D. and Zhao, Y., 2003, “The value of information sharing in a two-stage
supply chain with production capacity constraints”, Naval Research Logistics 50,
pp. 888-916.
= Sterman, J., 2000, “Business Dynamics: Systems Thinking and Modeling for a
Complex World”, Irwin McGraw-Hill.
* Tomlin B. T., 1999, Supply chain design: Capacity, flexibility and wholesale price
strategies, PhD Thesis, Sloan School of Management, MIT, Cambridge.
* Towill D. R., 1996, “Industrial dynamics modeling of supply chains”, International
Journal of Physical Distribution and Logistics Management 26, pp. 23-42.
* Trondsen, E., 2001,"State of E-learning: Lessons for Government." Government
Learning Technology Symposium.
= Woodill, G., 2004, "Where is the learning in E-learning?", http://www.e-
learningguru.com/wpapers/e-Learning_analysis.pdf
= Zhang, X., 2004, “The impact of forecasting methods on the bullwhip effect”,
International Journal of Production Economics 88, pp. 15-27.
Internet Sites:
= The Information Technology Institute (ITI) website: http://www. iti.gov.eg
= The Virtual ITI (VITI) Portal: http://www.viti.gov.eg
* Ministry of Communication and Information Technology (MCIT):
www.
OV.e:
= 23 =
Appendix A: Stock and Flow Diagram
-24-
Writing / Technical Revision Production Sub-processes
Sm}.
WHOM AY —_ABy JBO1UY99} prepUEIS
Joge| Aey je1uyo9}
aye.
ueys Bunum
Jeoluyoay uo einssaid
nay [o1UYD9} piepueys
) ainsseid
eimpeuosne Jeo}uyoo}
NOM AB |
DD anguns bum
Ayagonposd
Apjaam nay [eo1uyos}
NOHO
Buum uo ainsseid ——ynyiom.
i einpeosjoweye —Gugum piepugys
piepueis C) s0qe Sugum
oji0m Bi
ainsseid
Amonpoud
‘Aunoy Bun
ayes
e}s Bugum pasisep
Awgonpaid
ayes}9Idwi09 ayes eS ayes
oy |e01Uy9a) pallsep ‘nay Je01Uyo9} pauls ye|dwoo Bugum panisap
nay [ROIUYD9}
ul sesinoo paysnfoe
Xo
nay [eoUyoey
ul sasinoo pausep.
Wey fea
A@Y [eO/UYD9} UI Sesinod
ysnIpersy |eo1UYo9}
ew
eg BunuM
2)
2721 ye|d woo Buyum
um poysiuy)
Bunum Ul Sesinoo peysnipe
| $esinoo pasisep
Apjoom Bunum
Buqum
ewig ysnipe Bunun
aye yeys Bunum,
uM UI ses
Aejep Aionjop.
‘ayes Bunumar
SBSINOO USYUM PaUiNjal
‘aye Bunum poured Q.
=] ‘oy?
‘own Bunumos
‘apes WEIS AaY eo1Uyoa}
ss
+
i
Bugum uo sjoaye 1e}0}
SIDS HM Woy ways
i; Uo ainpayps jooeyo
Sioue ‘aye Sioa ajqejdeooe
ones sioue BunuM
ainssaid sioue Bugu
sioue Buyyum — 9INPeyOs Bunum
uo SIPS Jo Dayo
fi
= 25 =
Sub-Processes
‘ion.
Producti
ision
/ Language Revi
ision
Technical Revi
bunisnipe puewep —puewep ajqauudicyo Sle HeIS
juewidojanep pausep
aye ues
O
ales puewap
deg ul eBueys
eye) puewiep eigeiuiid
ewnrsnipe eiqeuud
uononpoig Bopjoeq ©. ayers
Jeua}ew pesisep uoHonpoig aiqeuUd
aBeroo
ney eBenbue| piepuers
eunssaid 8iNPe49s ——ymomnoy,
Agy a6enBue| afenBue| uo ainsseid
ney eBenBue| passe
anjOm
noy oBenbue| piepues
On nono
‘Ady a6enBue|
wo10M oy @BeN Bue}
Joge| rey aBenBue|
ainpayos jo aye
Apjeemaoy efensue}
N
ayes yejdwioo
‘Aq [BO1UYO} pasisep
eyes vers
ney BenBue| paiisep,
jeuayew ejqeiuud
ow
wa Arey ebenBue; = A2x eBenBue] {snipeacy
a ‘sasinoo paiisap,
ae
yoldwioo ney aBenbue|
io ‘ney oGenGue| ul sesinoo
jeuayew aiqequud
ayes Leys Ady oBenbue|
“O
ewin ney fea,
nay aBenBue|
a
‘sben6 ud! S28N09 Pat snipe
2121 j9;du109 nee
Aejep Aronijap
FAI
ayes noo Aes jeo!uYDe poLUMeL
‘A@J [eoJUYOo) PowMaR 13)
ww
ye1 Nod jeo|UYDe}-21
ayes wes nay abenBuel
sioua ney [eo1uyoe)
uo sjoaye 120)
‘UU Aer [eOIUYOS}-21
ainsseid
PINPEWSASH —ainpayos aay jeo1UYyoo)
Jeojuyoar Woy eye r $1019 NOY [EO}UYOS}
Uo sips yo 1eye
OP) aa ayes sioue
SIDS AON srousaey jeouloe ARES RO
leojuyoa, way aye
On O
= 26 =
Writing / Technical Revision Man-power Co-Flow
‘esinoo sed own
nal eoluypa, aBelane
MDfJOM ABY [201UY9}
asinoo sed
JHUeW Ady [eo1UY99}
aye1 Aad Jealuyoa}
0} J9ysueN Jue
nay [RO]UYOe} 0} JyUE WL
UM poysiuy o}sHUeU
aye Sunuum poysiuy
JHUeW AaY [eo1UYoR, vo) sHUeW aBelafne
i.
2124 ABY JeO!UYOS} |e}0}
21 Aad [eo|Uyoa}-a4
oy [91UY99} UI Sasinoo
asinoo sed
jayuew ulupe 6
O
sesinoo Bugum paysiuy
9121 We}s ey [eD!UYD9}
Z
Ee
ayeiduioo Bunum
aN
aed sHUeU
eyes Bunum peysiuy
oy Jeysueg sew
Bunum 0} 4yuew
>moyiom Buna
ayes sHuew Bujum OC
asunoo sad
own Bugum eBeseire}
Buqum
Joy sHUeW eBeiofne
y
esinoo
Jed yyuew Bunum
sojes wes 6
\
ayes We}s Bunn
= Lt}
sesinoo ueRlum pauines
ayes Bunuum pouinyes
aye j2|d woo Buy
9ye1 Bunumes
a27 =
Technical Revision/ Language Revision Cost Co-Flow
Jeya}ew aiqequlig 0} 3yUEW
ayes s}uew ajaidusoa
‘Ady a6enbuel
reuaiy alaeund A
jorssuew abet
esinoo Jed sHuew
urmipe ray aBen6uel
O
euarew ajqeuud
soe ajojdwoo
uo}smes e6enbue} 110)
\
*Q
aes
‘ney eBenbue| paysiuy
oy s9jsueN JyUeW
yo{duiooney aBenbue}
‘asinoo sad awiy Ab
yuo ney aBenBue} oBenBue| aBeaive
asinoo sed
sHuew Ady abenGue}
‘aqesney aben6uel
oj ajsuea sHueU
ney eBenBuel 0} sHUew
ney
oy Jajsueq JHUeW
‘now eolUYoe) paystuy Oo} HUE
Q
aes i
sHuew nay ebenbue/
ney JeolUyosy 0 HUE LH
74
ayes Huew
ajaidwooreyyos yey gyajdusoo
/ ‘ney Jeo}Uyo9} paystuy aeU UE oe.
nay a6enBue| f :
Joy juew bese fre
XQ ayes yeys Aey eBenBue}
of
NA ayes Buqum pawinyas
w ‘or
aye ueys ray e6enbue)
Ay a6enBuel ul sasinoo
Q
aes
sHue wi Aad [29Uyo9}
Jo syuew aBesane
\
‘nay jeoldyoay ut sasinoo
“Lt
[|
aes
‘nal [ea|UYD9} pewuNjas
Q
‘91 je01UY99) PaUuMyos
ae
lk JoId woo new feojuyoa}
921 N04 JeoluYy99y-91
ai
sasinoo
1]
= 28 =
Cost Co-Flow
vision
Writing / Technical Re
Auejes nay |e01UYo0}
seoinosal
A@y [eo1Uyoe} asinoo Jad
JHUeW Ady JeolUYos,
asinoo
Jed }soo ney jeo1uyoa
aje1 ay |eo}UYoo}
0} pasaysueg soo
5@)
ABY [eO!UYD9} 0} }S09
Bugum paysiuy 0} 3s00
esinoo
sod suew uiwpe um
seoinosei ulwipe
asinoo
Jed}soo ulwpe ym
aye UM paysiuy
0} paiaysues} 1800
ii
a1 }S09 ABY JeO!UYoa,
Sunum paysiuy
‘04 1809 aBe1eBne
aye ney feojuyos) jeje) “NY
ney [eo1Uyoo}
10)3809 aberat
aye Aad |eo|Uyva}-ad
hey jeoluyoa} ul sesunoo
Ie)
Arejes uwipe
UM 0} 1800
4809 ye|dwioo Bunun,
Q
sesunoo Bynum paysiuy C)
a
aes
Bugum
40} 800 abeiofne,
|
914800 Bun
@S1N09 Jed}sOo WM
ayes }4e1s Bugum je}0)
1
121 ue} Buju
on
Suqum pawns
ai oui
'sa.Sinoo UayUM paunjas
a)
seounosai BuUm
Auejes Bug
asinoo
ed syuew Buguim
-29-
seamosal ujupe asinoo sed syuews
ujwpenoy abenbue
Peal
~~
Aejes uwpe
Pal
esinoo 1edjs09
ie ujwipe rey e6en6ue|
seanosal
‘ney eGenBue} esunoo 18d
sHUeW rey eBen6ue
=o
seainosel ujwipe esinoo Jed syueW
7 ujwipe rey jeo1uyooy
’asinoo 18d }s09
fuejesney abenbue| sie now teo1U4e1
Cost Co-Flow
ision
ision/ Language Revi
isio
Technical Rev:
jevajew eiqeyuud 0) 3809
aje1 eiqequud
01 paiajsuen ysoo
AO
asinoo
Jedysooney aBenbuey
‘ney aBen6ue| 04 )809
Tt
aye1}s00
yalduioo nay eBenBu>
yayew 9|qeiuid
40) 1809 aBe1a6ne
yevajew aiqeuud
410) 4809 abeiabne
NS
sajei ajajduioo
uo|snas aBenBue| (230)
i
aer
‘Aad jeojuyoa, pana
=
aye
ye\duioo ney eBenBue}
Q
fe
‘ney aBen6ue] u! sasinoo
ajeiney aBenBue|
0} paiaysueg ys09
AB YYOS} PAYsiUy 0735;
ayes
ie)
Q
Ady jeo1UYD9} paysiuy
palaysues}soo
Ady [EOIUYDE} 38%
7 /
ajeijsoo ney eBenbue|
Vues roy ebexbue|
‘21 }S09
/
‘now eolUyse paysiuy
40} S09 abesa6ne
sesinoo
oy [eo1UYO9} paysiuy
yolduloo ney jeo1uyoes
ayel a9) dui09
‘nOy [eOlUYDe} [2}0}
24 Bu
ae —
:
nbcsot anil Ke)
Q.
‘now eolUYyDe
4J0j}809 aBese6ne
im pauinjal
‘A@y [2|UYoq UL sesinoo
“kt
ayes
‘nal jeoluypey pakunyes
=
sesinoo
‘ad |eo]uyoe pownje,
‘aye nas [eo] Uyoe}-01
L
ZS
O
=
uoW's
E-Material Production Sub-Processes
ayes puewiap
jeyayew-s u! aBueyo
Aiddns
JayeU-2 pasisep
Goppeq
uoyanpaid jevyeuro
sious yuawadojanap
puepueys
SWNOHOM 158} PE PUETS
soon
180} Uo aunsseid
‘einpaos joy0ye
ainssaid ainpayps}se,
va)
a 1s)
eqs 189} plepues
‘Ayyoni (, Apjoamisay
ere)
id
ye{dwioo ya} paiisap ayes jajdwioo
112)8 189} paslsep
\
189)
489] Ul sasinco paiisep
uu sesunoo paysnipe
nfpe jeusey-o
a
‘euinisnipe ys}
ewnise,
‘oun uourdojanap”
ayes yes
juewidojenap prepueys.
O
|
eunsseud ajnpayps:
quawadojarap_
quawidojenp paiisap
quauidojenep
Sesinco pallsep
ayer
jd woo juauidojarep,
>opom
qwouidojanep puepuers
yno}s0.Mm jU0 Udo} nd)
uo ainssax
ainpayps jo yoyo
ee
ayes ues
uauidojanap paisap,
>
queudojanap.
ul sasinooysn{pe
Joge| quaudojanap
‘Awnonpoid
( quauidojarep
juawdojarep O
va
Auntonpoud
Apjeamyuatudojanep
levayew eiqewuud
LI
‘euinisnipe jetioyeut
awn
snipe uauidojanap
\
‘ayes vers Tuauidojanap Aiddns
911 }2|dWOo }s9} 8121 JE] 13)
2" ys0\u sosinos Woudojarep poysiuiN juaudojarap dysasinoo Oe een
Adyap Kenjap-
ainsseid empoyps
wuouledojarep joudojonop-04
TA eipeise oes uowidojenep 0) s9sinoo
sioue
quouldojanep powinyas
juawidojarap aBesene ideuledojene| epen Pe OL up uauudojanep-a1
wioy jo2y0
2
jsyuawWadojanep sicue}uewdojenep
woy ayo uo sjoaye |e}0}
ones
gus uauiadojanap
31 =
E-Material Man-power Co-Flow
asinoo
4NOUOM ISO}
asinoo sed sHueWyS@)
Jad ewigyse} abeiaine
ayes
ayes jewneure are juouidojanep poy siuy
oy 9jsuen suew 189} 0] jsueg UE ojig)sueg syueW
euajeure o}}HUeWL ep o.squew
A) 48a) 0) JHUeW Q) juauidojangp paysiuy qi yueW
a ZS roHomuouidoja0p
aa jes
aes ayes) qucW
ayer JyueW se
syuew!yajdui09 180}, | pee aldwoo juawidojarep sHuew weuidojenep
eyerew ea quauidojanap poy asinoo ied
-2 so} .yuew abesobne JojsHuew abeiob.e sHuew ueuidojara
v4 Jo} sHuew abe1a61e He ae
juouidojanep
a
asinoo
ied j9|d 09 yS9} [eI01
Jed suew ujwipe ysay .
Pr
esinoo sed sHUeU!
ujwipe jueuidojanap|
Z
Ol.
juat\dojanep peysiuy,
asinoo sed ow
40 sHuew obesobne! suusuidorevep SbuiEEN
aye, ]Uawidojanap [eI0,
SS
ye|dwoo jueuidojanap ayes Wes juowidojenep
\
‘or quetdojanep u)sesinoo
O ayes jaduioo ysey
ialaeure 489} ul sasunoo
. t T
aye
Ck
quawidojanep
0) sasinoo uinjar
juuidojarep pune
Q
C
aje) uauidojenap-21
Q
mae =
Avejes uwpe
asinoo
Jed syuew ujwpe ise,
Aueje:
S188}
‘ives ulwpe
esinoo sed syuew
ujwpe wuaudojanap
‘s90iN08@1}$9}
E-Material Cost Co-Flow
seounosal Ulwpe
jeuaqew-e 03809
asinoo
Jodyso9 ul wpe ise,
ayes 189
woy aseasoul }s0o.
re
‘9sinoo 49d 380916)
ayes
180} 0} 1809
juawdojanap pay siuy
woy @sea1ou!}s00
Ny geinosseaieon:
ulwipe juawdojanap’
‘S
aqesjuewidojanap
woy 8seel0u|}S09
quawidojanap paysiuy 013800 ‘se
seainose:
qusuidojarap
quowidojanap 013800
esinoo
-2 103800 eBeue6ve
jel 1800 ya|duloo 389}
189} 10 800 eBe16ne
‘ay21 aja|diuo9 189} 1210},
i
=
aye 380038)
/
ujwipe
40} 800 eBesabne
\
ZS
21211800 ueUidojenep Auejes juawidojanep)
asinoo
49d 1800 juetudojanep
21213809
ye|d woo juswudojanep
jue wdojanap
40} 800 aBeesabne
\
‘asinoo sed
sHUeWUaUdojanoy
ayeljuauidojarep 1e10) Hueunquouicolenep
—_———-
aye
@eljeiduooisa ABUASISSD ya|dwoo juawdojanep
jeuajeure O 38e} ul sesinoo O audojanep pausio y quawdojanep ut sesinoo \_,
ii
geil
quewidojeneplpewna: ayel ue wdojenep-o1
juewidojanop
9) sesunoo wryes
Q
1]
-33-