A SYSTEM DYNAMICS MICROWORLD FOR THE

INVESTMENT IN ELECTRICAL GENERATION CAPACITY IN
LATIN AMERICA

Luz E. Pineda’, Ricardo A. Smith’, J osé V. Guzman?
Claudia C. Rave’ and Isaac Dyner*

* Energy Institute, Facultad de Minas, Universidad Nacional, Medellin, Colombia
7 INTEGRALS. A., Consulting Engineers, Medellin, Colombia
Apartado Aéreo 1027, Medellin , Colombia
Phone: 57 - 4- 425 5100. Fax:57- 4- 2341002
lepineda@ integral.com.co, rasmith@ perseus.unalmed.edu.co,

ABSTRACT

The restructuring of several Latin American Electric Sectors raises the necessity of
developing analysis tools focused on the understanding of the new electric energy
trading structure. In this work two Microworlds were developed for the two main
market schemes in actual use in Latin America: dispatch by prices and by cost. The
main tool used in the microworlds was System Dynamics. Both intend to facilitate
learning processes of the complex mechanism that characterize the investments in
Latin American electricity markets. The developed system can also be used to
analyze possible investments in electricity capacity in Latin America. An effort has
been made to introduce risk and uncertainty criteria to analyze possible decisions.
Some results are presented by applying the developed tools to Colombian and
Panama Electric Markets.

Key Words: Microworlds, Investment decisions, Electric Generation, Latin America,
Learning, System Dynamics

1. INTRODUCTION

In the last two decades, several countries of Europe and America had restructured the
public services sector, including the electric energy sector, by introducing market
structures. As a result several Latin American countries has today electricity energy
market schemes with ample participation of several agents such as generators,
traders, consumers and distributors. The different market agents trade energy in two
basic forms: by long or middle term energy contracts or by participating in a short
term energy interchange mechanism where energy is traded every day. The electric
market schemes generates opportunities for investments in different aspects of the
power chain. Potential investors has to make decisions in a complex environment
that includes the consideration of aspects such as: future electric energy demand
growth, macroeconomic conditions, market regulatory policies, technological
developments and the penetration of energy substitutes, among others, many of which
are generally not known by the investors.

The electricity energy market has several risk and uncertainty sources that has to be
properly considered in investments decision analysis. The traditional financial
evaluation of power capacity projects presents several problems, specially in aspects
related to the appropriate evaluation of the project benefits in a market scheme. New
risk analysis methodologies have been introduced to evaluate the option to invest,
considering investments as a time opportunity, and by evaluating the involved risk and
the uncertainty.

There are then complex markets schemes where investments decisions has to be
made that involves several risk and uncertainty sources. Most of the agents
participating in the electricity energy markets in Latin America are not well prepared
to face this kind of decisions. Learning tools are needed to build up decision
capacity in those markets related to several aspects, including capacity investment
decisions. Microwolds are a interactive learning mechanism that allows the users to
learn how to participate in those markets through a virtual environment. Several
specially design market conditions are included in the microworld to teach de users
how decisions should be made.

The developed tool has two components: the microworld for learning how to invest in
Latin American electricity markets, and a decision support system to analyze
particular investments in those markets. Both components were developed using a
System Dynamic model to represent the market interchanges. The analysis of the
electrical markets in Latin American countries, lead to the identification of two typical
structures for the transaction of energy, corresponding to two different criterion of how
markets are operated: in the first one generators are dispatched according to a
system based on the prices of the amounts offered by the agents, and in the second
one the dispatch is defined using a minimum cost operating criteria. Following these
two criteria two microworlds or simulators were developed for the investment in
generation, as learning tools or as a decision support tool in the investment decision
making.

In the following sections a description of the developed microworlds is presented.

Results and discussion of two applications in two different countries are presented,
followed by some conclusions and recommendations.

2. MICROWORLDS AND THE ELECTRIC ENERGY MARKET
The Microworlds or simulators are tools based on the system approach stated by
Senge (1993), and that facilitates the learning of their users. These applications
consist of structuring models to explain the interrelations that exist between the
variables of the system, saving time and costs that otherwise the user would incur in
real life. As an analysis and learning bols, the development of Microworlds for
investments in new electric energy generation capacity, help to understand the
evolution of the market under different investments forms and criteria. In addition, it
allows to understand the market environment to make investments and to support the
decision making process.

The conceptual structure of Microworlds responds to the methodologic requirements
necessary to face the complexity and the new elements introduced in the analysis of
power systems. In addition they allow to consider some special modeling
characteristics (delays and back feeding) encountered in those systems, and must
satisfy the following methodologic requirements (Dyner, 2000):

Modularity: It allows to understand the system through its components. It gives the
possibility of developing modules without losing the system vision of the problem.

Back feeding and continuous adjustments: It allows the updating of the model, not
only with the information, but also through back feeding mechanisms.

Transportability: It incorporates modeling structures with the respective adjustments
to take advantage of the modeling advances already made.

Transferbility: It allows the user to know the model, from the assumptions to the
results.

Handling of Uncertainty: It is necessary to have a suitable treatment of uncertainty,
since it is one of the most important factors in the new structures of electrical systems
markets.

3. GENERAL SCHEME OF MICROWORLDS FOR INVESTMENT IN
GENERATION

The modeling platform developed in this work is based on the structure proposed to
study the dynamics of modern electrical markets (Bunn et all, 1997). In Figure 1 itcan
be noticed that the difference between available generation capacity and electricity
demand (the system margin), affects the electricity price and this as well affects the
demand, due to the existing elasticity between these variables, forming a back
feeding cycle. On the other hand, the electricity price and the system margin generate
incentives to invest (including not investing), which affect the available generation
capacity and another back feeding cycle is closed.
Electricity Incentives
() Price to invest
Exponential back 0 Balanced back
Electricity feeding cycle feeding cycle
Demand @

System Q Generation

Margin Capacity

L J

Figure 1. Example of electrical energy markets dynamics.

The modular structure constructed to relate the mentioned variables allows to
represent the systemic structure of electricity markets and it is conformed by the
modules of demand, hydrology, market, capacity expansion and financial, as it is
described below.

An important effect caused by the introduction of competition in the electric sector is
the technological diversification that occurred in most of the countries, and that
respond to the construction of more efficient power plants, in order to obtain a better
performance in a competitive market.

4. MARKET SCHEMES IN LATIN AMERICAN COUNTRIES

The selected Latin American countries for the conceptual development of Microworlds
were Argentina, Chile, Colombia, Costa Rica, Ecuador, El Salvador, Panama and
Peru.

In conceptual terms, the modeling of the investment in generation capacity in the
analyzed countries, was based in the following basic characteristics of the electrical
sector restructuring introduced in those countries:

+ The market structure as far as the number of generation agents (effective
competition), the coverage and dead lines of energy contracts (new participants),
tendency and level of activity of the demand (capacity expansion signals)
+ The transmission network: coverage and quality of the transmission system (real
competitiveness between energy producers and importance of the network
constraints).

+ The generators: technological diversity as a function of energy sources availability
and the capacity generation property structure (effective competition).

Based in the study of the regulatory frameworks and in the structures of operation of
the electrical sectors of these Latin American countries, two types of schemes were
identified. It was then decided to develop a different Microworld for each one of those
schemes which are:

Latin American countries whose electrical sector has a dispatch scheme of
transactions based on a price offers by the electrical generators, such as
Colombia and El Salvador. For simplicity, in this report this scheme will be called
“Price Dispatch”.

Latin American countries whose electrical sector has a dispatch scheme of
transactions based on the short term economical costs of the generators energy
resources. Countries such as Argentina, Chile, Costa Rica, Ecuador, Panama and
Peru uses this kind of dispatch. For simplicity, in this report this scheme will be
called “Cost Dispatch”.

The simplifications and desaggregations made on the dynamics of the electrical
systems for the accomplishment of the microworlds were the following ones:

+ A monthly aggregation level.

In the microworld based on Price Dispatch the power generating units were added
according to the type of technology and the regulatory capacity of hydropower
projects. The power generation units were then added into the following
technologies: Long Term Regulatory Hydropower Plants (HE), Run of the River
Power Plants (HF), Coal Power Plants (TC), Natural Gas Power Plants (TG). Also,
in the Cost Dispatch microworld, the generation units were aggregated in: Long
Term Regulatory Hydropower Plants (HE), Run of the River Power Plants (HF),
Natural Gas Power Plants (TG), Diesel fuel Power Plants (TD), Bunker fuel Power
Plants (TB) and Fuel Plants with combined cycle (TC).

In order to consider the inside-of-the-year (monthly) hydrologic variability, the year
was divided in two climatic periods: one with abundant rainfalls (winter) and
another one with moderate rainfalls (summer).
In order to consider the ENSO (EI Nifo Southern Oscillation phenomena) effect on
the hydrologic conditions, the years were classified according to the occurrence of
the warm phase of this phenomenon (EI Nifo), the occurrence of the cold phase
(La Nifia) or the occurrence of normal conditions.

5. BASIC OPERATION OF MICROWORLDS

The developed microworlds offers two possible uses. The first one is composed by
several games, and its intention is to teach the user (investor) about the mechanisms.
of how electrical markets operates under certain specifically design conditions
(demand, hydrology and capacity expansion). These conditions are designed so that
the user will learn about possible situations that can occur in the market and that can
put him in a difficult position. By playing in the market under these conditions he learns
how to invest in the electric market. Its intention is to illustrate the most appropriate
moment to make the investment.

The second Microworlds use allows the user to analyze a specific investment under
uncertainty considerations. In this case the user has the option to determine the
number of simulations that he wishes to make, being able to define a predetermined
macroclimate condition or to use synthetically generated hydrologic conditions using
a stochastic model. If a single simulation is made, the model computes a series of
financial indicators of common use within the financial practice. If a number of
simulations are made, the model also provides some risk and uncertainty indicators.

The model offers as results, beside the financial indicators, the temporal evolution of
variables such as the river discharges (in energy) into hydropower projects, the
energy pool prices, the energy margin, the dispatched energy by technology and for
the project being analyzed, and others. The user could implement the model for any of
the selected countries as long as he has the required information.

6. GENERAL STRUCTURE OF MICROWORLDS

The Price Dispatch microworld was developed based on some previous modeling
work of the Colombian market (National University and Integral, 2000; National
University and ISA, 2000). The Cost Dispatch microworld was based on the structure
and operational rules of the Latin American markets with Cost Dispatch schemes
(Argentina, Chile, Costa Rica, Ecuador, Panama and Peru). Both microworlds were
developed so that both have the same modular and operational structure. The
modules that conform the two developed microworlds are structured as shown below
(Pineda, 2003).

Demand Module
In the microworlds the user has the possibility of selecting a demand growth scenario
with which he wants to perform the simulations. He has the possibility of using the
official national demand projections of each country or to use a demand scenario
defined by himself. In any case the demand projections to be used in the microworld
represent information to be given to the model.

Hydrology Module

The hydrologic simulation model considers the relationships between the river
discharges and the occurrence of the ENSO (EI Nifo Southern Oscillation)
phenomena. Additionally the inside of the year persistence is considered as a
determinant factor in the behavior of the mean river discharges in a region. The
hydrologic model separately estimates the discharges into the runoff the river plants
and the reservoir hydropower plants, considering the hydrologic regime and the
existing macroclimatic conditions. The river discharges are modeled using a regime
dependent stochastic model. In order to use this kind of models the macroclimatic
condition has to be previously defined. In this case the users has several options to
define the macroclimatic conditions: to use a dependent on the regime first order
autoregresive mode, to use a re-sampling technique or to introduce a hydrologic
scenario defined by the user.

The results obtained in this module are used in the market module to determine the
dispatch by technology and particularly in the project being evaluated with the aid of
this microworld. Thus, the river discharges into the hydropower plants (run of the river
(HF) and reservoirs hydropower plants (HE)) are used to calculate the energy
availability associated to these two technologies. The probable scenarios of ENSO
occurrences are considered when selecting for each technology the supply curve
associated to such conditions in order to define the global electric energy dispatch.

Market Module

In the market module the pool price formation process is modeled and the energy
dispatch is made by technology and for the project being evaluated, based on the
results from other modules that previously defined the hydrologic conditions, the
energy demand and the capacity expansion.

The pool price in a Price Dispatch scheme is obtained by ordering the different
amounts of energy offers (availability) by the price at which they are offered until
demand is satisfied. In a Cost Dispatch scheme the energy price in the Occasional
Market is defined as the short term marginal cost, and it is calculated as the cost of
supplying the last unit of demand in the system load curve, including the necessary
reserve for the wanted quality and reliability for the system.
The supply curves represent the energy amounts (availability) and the price at which it
is offered to generate that amount of energy. These curves are constructed using the
electric market historical information. The supply curves are defined for each energy
generation technology that compose the system. The supply curves are dynamically
modified with the entrance in operation of a new project. When a new project enter the
system, the supply curve of the corresponding technology moves to the right a
magnitude equal to its availability.

For both microworlds the pool price formation is obtained by horizontally adding the
supply curves of the different technologies until demand is satisfied. The pool price or
the marginal cost, depending on the market scheme, is then defined as the price at
which the horizontal aggregation of the supply curves (specifically the amounts of
energy available by technology) becomes equal to the demand. The amounts of
energy associated to each technology conform the system dispatch. Microworlds also
handle long term electric energy contracts and agreements, whose prices are an
exogenous variable for the model.

The module uses annualized monthly volatility as an indicator of the system risk. The
volatility is computed period by period as the standard deviation of the difference of
the logarithms of the pool prices for the last twelve months and the monthly volatility
defined in the same way but for all the simulation period (J orion, 1997).

The results of this module (the project dispatch, the pool price and the long term
contract price) are used in the financial module to calculate some investment
performance indicators.

Expansion Module

The basic result of this module is a sequence of new projects to enter the electric
energy generation system, which is used in the market module to modify the supply
curves. In the expansion model two criteria can be used to define the expansion of
the electric generation system: Minimum Cost of Mean Energy and the Availability
Margin, or the Critical and the Expected Prices.

The criterion of minimum cost of mean energy and availability margin is simulated by
estimating first the system availability margin and then itis compared with a minimum
allowed value. When the margin is lower than that value the system is in a critical
situation and it has to be expanded by entering new generation capacity. In this case
the new projects are selected form a group of available projects, selecting the project
that has the smaller Mean Energy Cost (MEC). The new project is entered into the
system as long as its minimum time for design, construction and being ready for
operation is less to the simulation time in which the model is.
In the criterion of Critical and Expected Prices (Dixit and Pindyck, 1994; Osorio,
2000) the investor decides to invest, through the comparison of a project
characteristic (Critical Price), and a particular system characteristic in a given time
period (Market Expected Price). The model assumes that the prices have a tendency
to increase and they follow a Brownian Motion stochastic process. When the Market
Expected Price is greater than the Critical Price the project enters the electric
generation system, and the expansion of the system occurs. Like in the previous
criterion, if in certain period several projects satisfies the Critical Price condition for
entering the system, only the project that has the smallest Critical Price value will
enter.

Financial Module

This module integrates the investments decisions taken by the user with the other
moduls calculations such as hydrologic simulations, dispatch and capacity expansion,
in order to evaluate the effect that the system conditions and their evolution would
have on the project financial behavior. In this sense the user, acting as a potential
investor, has the opportunity to evaluate the financial consequences of his decision by
using the indicators and results of the financial module, throughout the simulation
process and in the longer term (the useful life of the project).

The module simulates the financial statements of the project throughout its life
(preoperative and operative), considering the possible financial and repayment
conditions. With this base it computes several yield indicators to evaluate the project
expected returns, for the project and for the investor, before and after taxes.
Additionally, and for the case in which several simulations are carried out, the model
provides several risk indicators. To perform this evaluations the model needs several
elements that depend on the economic context of the country in which the project is
located, such as the discount rates, the foreign exchange rates, or the tax and tributary
regime.

Microworlds defines the project cash flow. The project benefits results from energy
sales in the market at pool prices, and from energy sales through long term contracts
at its corresponding prices. Additional benefits that the project could receive such as
stand by power or available capacity offered to the system, are mechanisms existing
in several countries to guarantee the system reliability and the adequate demand
supply. The costs in which the project incurs are caused by operational and
investment costs, and by the purchases of energy in the market to supply the contracts
commitments that cannot be taken care with its own generation.

The used financial indicators are Net Present Value (NPV), the Internal Rate of Return
(TIR), the Capital Recovery Period (CRP) and the Solvency Indicator, that allows to
analyze the number of periods in which the project behave adequately (financially).
Vulnerability and robustness are the decision criteria used under risk and uncertainty.
In the case of several simulations the model gives indicators such as the maximum,
minimum, and mean values, several percentiles, distance to an ideal value provided
by the user, etc., for each one of the return criteria series obtained as a result of
computing the financial indicators for each simulation. The envelopment of the
maximum and minimum values of the annual cash flow is also defined by the
microworld. Several figures related to the obtained results are also presented
including graphs of the indicators distribution.

7. MICROWORLDS APPLICATION CASES

Colombia was used as the case application for the Price Dispatch microworld and
Panama for the Cost Dispatch microworld.

Price Dispatch Case: COLOMBIA

For the Colombian case information processed until year 1999 was used, the
simulation was done using as a initial date of simulation December 1999. In the
selected macroclimatic scenario (customized option) five ENSO events were defined,
using the same starting date of December 1999. The used demand scenario
corresponds to the Medium Energy Demand Scenario defined by the National Energy
Planning Unit (UPME in Spanish).

The main characteristics of investment project to be analyzed are: a run of the river
hydropower project with a installed capacity of 50 MW, with a mean plan factor of
0.85, and an annual mean energy of 372.3 GWh. The project can be finished and be
in operation in a minimum time period of 24 months. The mean energy generation
unit cost is 33 USD$/MWh, the expansion criterion to be used is the Critical and the
Expected Prices assuming a expected market price of 50 USD$/MWh. The financial
conditions considered for the simulations are: a 50% indebtedness capacity, a debt
payment period of 12 years, an annual real interest rate on the loan of 8%, a rate of
discount of 12%, costs of operation, administration and maintenance of 5 USD$/kW-
year, investment costs of USD$ 42 millions, long term contracts representing 40% of
the mean annual energy, and income taxes of 35%.

As a result of the application described above, Figure 2 presents the evolution of the
system in terms of the supply and demand behavior. For the hydrologic and demand
conditions previously defined, the system was always able to supply the demand
requirements.

Figure 3, presents the dispatch for each technology during the simulation period. In
the figure it can be noticed that hydropower and gas fueled plants are used more
frequently than the other technologies. The gas fueled power plants increases its
dispatch just before the ENSO phenomenon occurrence since in those periods the
dispatch of hydropower reservoir projects are significantly reduced.

EVOLUTION OF THE SYSTEM DEMAND AND INS TALLED POWER CAPACITY (MW)

Figure 2. Evolution of the system demand and installed power capacity. Colombian
Case.

Figure 4 shows the evolution of the market pool price obtained in the simulation. The
pool price envelopment of the maximum , mean and minimum values are shown in
that figure. In this graph it can be noticed the effect of the ENSO phenomenon on the
pool prices. When ENSO occurs pool prices are significantly higher than in normal
conditions.

EVOLUTION OF THE SYSTEM POWER DISPATCH BY TECHNOLOGY (MW)

Dispatch HE
Dispatch HF
Dispatch TC

Dispatch TG

Figure 3. System power dispatch by technology. Colombian Case.

The obtained financial indicators and the cash flows, for the project and for the
investor, before and after taxes, are shown in Figure 5. The results shows that the
proposed investment is just acceptable. The obtained Net Present Values are
positive before taxes, but the value before the financial leverage and after taxes is
negative. This means that for the investor the project can be developed, specially
taking into account that the solvency indicator is zero, meaning that under the
assumed conditions the cash flow is always positive. Nevertheless, and even though
that the Internal Rate of Return for the investor after taxes presents a value grater than
12%, the capital recovery period is quite long (from a private investor point of view).
This would indicate to the investor the necessity to optimize the project, reducing
investment costs or increasing the generated energy.

POOL PRICE EVOLUTION (USD/MWh)

Figure 4. Pool price evolution. Colombian Case.
PROJECT AND INVESTORS AFTER TAXES

Max avg
71.20 32.16
023 0.186
35 20.46

Max avo Min
75.29 36.31 9.13
028 0.179 0.02,
35 19 13
415

Figure 5. Financial Indicators of the proposed project. Colombian Case.

Cost Dispatch Case: PANAMA

For the application to Panama, and in general in the case of the countries with Cost
Dispatch schemes, the construction of the supply curves requires information of the
historical behavior of the declared energy availability for all the plants and _ its
respective marginal costs, which are obtained from the dispatches made when
carrying out the system operation optimization. The initial date of simulation of the
model for Panama is J anuary 2001.

In the Panamanian energy market some of the fuel power plants have already several
years of operation, which is reflected in the energy prices (high operational costs).
Usually, when thermo generation plants has a important participation in the energy
market, market prices are significantly higher than in the normal condition case.
Panama climatic variability has a important effect in the energy cost since the two
most important plants are hydropower plants. One of them is located in the Pacific
Ocean side of the country and the other one in the Atlantic Ocean area, looking for a
reduction of the seasonal variability over the country.

For Panama the simulation conditions correspond to specific macroclimatic
scenarios with the customized module of hydrology defining five ENSO events. The
used energy demand scenario corresponds to the higher one during a summer
period, which is proposed by company ETESA (The Panamanian National Energy
Utility).
The main characteristics of the project to be analyzed are as follow: a run of the river
hydropower project with 42.5 MW power capacity, a mean plant factor of 0.85, and a
mean annual energy of 316.5 GWh. The project can be finished and be in operation
in a minimum time period of 24 months. The mean energy generation unit cost is 33
USD$/MWh, the expansion criterion to be tsed is the Critical and the Expected
Prices assuming a expected market price of 50 USD$/MWh. The financial conditions
considered for the simulations are: a 50% indebtedness capacity, a debt payment
period of 12 years, an annual real interest rate on the loan of 8%, a rate of discount of
12%, costs of operation, administration and maintenance of 5 USD$/kW-year,
investment costs of USD$ 42 millions, long term contracts representing 40% of the
mean annual energy, and income taxes of 25%.

In general, the Panamanian system presents as a dispatch characteristic a cost
increase of the reservoir hydropower technology under ENSO conditions, until almost
reaching the cost of thermal power plants. In Figure 8 the financial indicators of the
evaluated project are presented.

EVOLUTION OF THE DEMAND, CAPACITY AND DISPONIBILITY (MW)

DISPONIBILITY MARGIN (MW)

Figure 6. Electric system evolution. Panama Case.
PROYECT POWER DISPATCH (MW)

Figure 7. Project power dispatch. Panama Case.

FINANCIAL INDICATORS

Project Before Taxes Project After Taxes

17,00 17,00 14,00 13,01
EE

Investor Before Taxes Investor After Taxes

Figure 8. Financial indicators for the project and the investor. Panama Case.
8. CONCLUSIONS AND RECOMMENDATIONS

Both developed Microworlds are directed to investors in electric energy generation
and other people interested in the industry. In this sense a tool was developed for
learning and to analyze complex problems associated with the investments
decision making in electric energy generation markets. The user can modify the
different parameters and make decisions while observing how the system evolves
and the effect of his decision over the system.

System Dynamics was used to represent the market interactions in both
microworlds. It is a powerful tool for the modeling of market systems with complex
dynamics.

Both microworlds behave properly when applied to Colombia (Price Dispatch
case) and Panama (Cost Dispatch case). The obtained results are acceptable and
in concordance with what can be expected.

+ The implemented Microworlds can also be used to analyze others aspects of the
electric energy markets such as: the impact of regulatory alternatives for the market
being analyzed, risk and uncertainty analysis of some variables like demand and
capacity expansion, and the analysis of the integrated Latin American electrical
sector.

It is expected to develop microworlds for other sectors with market structures to
support learning or decision processes such as the water supply sector,
telecommunications, waste management, and others.

9. ACKNOWLEDGEMENTS

To COLCIENCIAS for financing the project “Microworlds for the Investment in Electric
Energy Capacity in Latin America”. To ETESA of Panama for providing the needed
information.

10. REFERENCIAS

Bunn, D. W., Dyner, |., Larsen, E., 1997. Modelling Latent Market Power Across Gas
and Electricity Market. System Dynamics Review, Winter, Volume 13, Number 4, UK.

Dyner, I., 2000. Energy Modelling Platforms for Policy and Strategy Support. J ournal
of the Operational Research Society, Vol. 51, N°2, 2000, p. 136-144.

Dyner, |., Smith, R., et al, 1998. Microworlds for training electricity traders. System
Dynamics International Conference. Quebec, Canada.
INTEGRAL-UN-COLCIENCIAS, 2000. System Dynamics Support System to Analyze
Investment possibilities in Electric Generation Projects in Colombian Electric Market
(in Spanish). Final Report. Universidad Nacional de Colombia - Integral S.A -
COLCIENCIAS. Medellin, Colombia.

ISA - UN, 2000. Microworld for energy trading in the Colombian Electric Market (in
Spanish). Final Report. Medellin, Colombia.

Jorion P., 1997. Risk Value. University of California, Limusa Ed., United States.

Osorio S., 2002. Opportunities for private investments in the Colombian Electric
Sector under risk and uncertainties considerations (in Spanish). M. Sc. Thesis.
Universidad Nacional de Colombia, Medellin, Colombia.

Pineda L.S,, 2003. Investments Analysis and Microworlds for Electric Generation in
Electric Markets Operated under Price and Cost Criteria (in Spanish). M. Sc. Thesis.
Universidad Nacional de Colombia, Medellin, Colombia.

Senge, P., Lannon C., 1992. Managerial Microworlds. Technology Review.

Smith, R., Dyner, |., 1999. Simulator for Energy Trading in the Colombian Electric
Sector. COCIER (in Spanish), Bogota, Colombia.

Universidad Nacional de Colombia - COLCIENCIAS, 1997. Expansion Planning of a
Interconnected Hydrothermal Electric Generation System (in Spanish). Water
Resources Graduate Program. Universidad Nacional de Colombia, Facultad de
Minas. Medellin, Colombia.

Universidad Nacional de Colombia -COLCIENCIAS-ISA, 2000. Management Options
for the Hydropower Resources in the Colombian Electric Market (in Spanish). Water
Resources Graduate Program. Universidad Nacional de Colombia, Facultad de
Minas. Medellin, Colombia

Back to the Top

Metadata

Resource Type:
Document
Rights:
Date Uploaded:
December 30, 2019

Using these materials

Access:
The archives are open to the public and anyone is welcome to visit and view the collections.
Collection restrictions:
Access to this collection is unrestricted unless otherwide denoted.
Collection terms of access:
https://creativecommons.org/licenses/by/4.0/

Access options

Ask an Archivist

Ask a question or schedule an individualized meeting to discuss archival materials and potential research needs.

Schedule a Visit

Archival materials can be viewed in-person in our reading room. We recommend making an appointment to ensure materials are available when you arrive.