CANA RELIABILITY CHARGE SECURE ELECTRICITY SUPPLY?
An SD-based assessment of the Colombian power market
Isaac Dyner Santiago Arango Carlos J. Franco
idyner@unalmed.edu.co saarango@unalmed.edu.co cjfranco@unalmed.edu.co
Energy Markets Group
Universidad Nacional de Colombia, Medellin
ABSTRACT
The deregulation of the Colombian electricity market took place in 1994 and the pool started operation in
1995. The Colombian market adopted a capacity charge mechanism to increase incentives for investment
in new capacity. The capacity charge proved to be weak in terms of transparency and incentives, causing
negative effects on investment. Nowadays, the application of the capacity charge is over and a new
mechanism is in place. The new mechanism, the reliability charge, intends to provide reliability to the
system. We have previously used a non-standard system dynamics approach to evaluate altemative
regulation schemes for the Colombian Electricity Market. In this paper, we have updated the system
dynamic model, formerly built, to evaluate alternatives to the capacity charge mechanism. We have also
assessed the effect that the reliability charge mechanism may have over the market and found that the
proposed scheme may actually overcome some of the drawbacks of the previous scheme; however,
simulations indicate that this may not have the desirable effects prompt enough to avoid blackouts.
1 Introduction
The electricity industry has been transformed worldwide since the mid 1980s. The deregulation
process has replaced state-owned monopolies with open and competitive markets in those parts of
the supply chain where it seemed feasible, taking advantage of experiences in other deregulated
industries such as telecommunication and airlines. These have prompted a new paradigm for the
activities of trading, management and delivery of energy services to final customers as well as for
regulation (Armstrong et al, 1994). Chile in the 1980s was the first country to move ahead,
followed by the UK and Norway in the early 1990s, with major innovations in market openness,
privatisation schemes and regulation set-ups. In Latin American, most countries have undertaken
major reforms or are in the process of transforming their electricity industries; in particular
Colombia, whose pool started operations in 1995 (Arango et al, 2006). Both the evolution and the
worldwide spread of the new industry paradigm have been very rapid.
The underlying motivations of deregulation have been to provide electricity more efficiently and
reliably with higher quality, also aiming to prevent mismanagement and excessive government
involvement in running utilities as was the case in some Latin American countries and in the UK
(Bacon and Besant-Jones, 2001; Newberry, 1999). Progress has been observed but there is still
room for improvements. On the one hand, some benefits are already being perceived in terms of
technology development and price reductions (Larsen et al, 2004). On the other hand, the systems
are still far from reaching equilibrium and major reforms are underway in many countries.
Limitations in adaptation have created problems such as in California (Wolak, 2003) and Chile
(Fischer and Galetovic, 2004), where major outages and extremely high electricity prices have
been observed due to regulatory complications.
In this paper, we focus on the Colombian Electricity Market (CEM), where deregulation took
place in 1994 (Laws 142 and 143: Congreso de la Republica de Colombia, 1994a; 1994b), and
the short-term market started operation in July 1995. During the first years, the system developed
satisfactorily in some sectors, especially regarding generation, sales to large customers, and
recently the household sector (Larsen et al, 2004). The Colombian market adopted a British-like
structure by adding a capacity charge (CC) mechanism to entice investments in new capacity. The
2
CC proved to be inefficient in terms of transparency and disincentives, causing a negative effect on
capacity. Nowadays, the application of the capacity charge is over and a new mechanism has been
implemented.
The literature considers a number of alternatives to the capacity charge mechanism (Millan,
1999; Comillas, 2000; TERA, 2001; UN-COLCIENCIAS- INTEGRAL, 2003; Larsen et al,
2004; Arango, 2007). However, the regulator - CREG - has adopted since mid 2006 the
reliability charge mechanism (RC), which intends to provide reliability to the system (regulation
CREG 071, 2006). In this paper we asses this mechanism through simulations. We present a
model which simulates, among other factors, the behaviour of investors under such scheme.
The following section briefly describes the CEM, followed by the modelling approach chosen for
analysis and the system dynamics platform for assessing this regulation altemative. Next, we
explain and assess the adopted option by the CEM. Finally, we present our conclusions in light of
the simulation process and results.
2 The Colombian Electricity Market (CEM)
The characteristics of the CEM are quite unique. It contains a large hydroelectricity base - around
70%. A third of which depends on a large reservoir capacity that is affected by severe weather
conditions which might reduce water inflows into the system by up to 50%. As Colombia
adopted the British regulatory scheme (ISA and XM, 2006), some changes where introduced to
account for structural differences between these systems. A complete description and evaluation
of the CEM is presented in Larsen et al (2004) and Arango et al (2006). Briefly, the results of
over a decade of operations seem satisfactory in terms of wholesale price, technology evolution,
and management development. However, price volatility and gains in the household sector are
pending. Furthermore, black clouds are ahead with respect to the appropriate technology mix
which influences price volatility and reliability of supply. Figure 1 shows the evolution of the
pool and long term contract price, the aggregated water level of reservoirs, and the system margin
(difference of Supply and Demand, over Demand).
() @b)
20 —Pool Price 4000
Installed Capacity, Demand, and Margin — Contract Price
36.000 990 — Available Water 12000
000 Capacity (MW) int
—Max. Demand [MW] 2
2 MIC CIE ono
Figure 1. (a) Installed capacity and maximum monthly power demand in Colombia. (b) Evolution of
pool and contract electricity prices in Colombia (Source: XM, 2007).
An important aspect in the CEM is the influence of the macroclimate phenomenon called ENSO
(El Nino South Oscillation). One of its indicators is the SOI and its occurrence significantly
reduces water inflow to reservoirs, as well as to many other sectors such as agriculture. The SOI
index might be used to determine the occurrence of ENSO. The opposite of El Nino, “La Nifa”,
brings water inflows above average. Consequently, prices increase considerably under ENSO
conditions, given the fact that the system is approximate 70% hydroelectricity based. In Figure 1,
the effect of the ENSO over the system during 1997-1998 is clear, as pool prices reached their
maximum levels and water reserves dropped considerably. Two coinciding factors have affected
the CEM lately: a large fall in demand and a high water inflow after the ENSO 1997-1998.
Figure 1 shows that capacity has increased and peak demand has fallen, creating an excess-
capacity situation. This drove prices down and discouraged investments in new plants, with
possible undesirable long-term consequences. New plants may not seem viable now but might be
required when the next ENSO (Larsen et al, 2004) occurs - the system may not provide clear
economic signals well in advance. As can be appreciated in Figure 1(a), the system margin is
now falling to levels that were observed when Colombia suffered significant blackouts between
1992 and 1993 and when there were threats of outages during 1997-1998.
The principles behind the pool in the CEM are to provide long-term economic signals for
capacity expansion and service reliability. In order to satisfy these principles CREG developed
the capacity charge (CC) mechanism (CREG, 1996; 1998), and reservoir interventions when
water levels fall bellow certain threshold. These limits are imposed on reservoirs to secure short-
term reliability. The CC is a payment given to those generators that provide, according to a
predefined procedure’, reliability to the system. The reference value for the CC is estimated as
the cost of installing one kW of an open cycle gas generator. The CC has been established at 5.25
US$ per kW. It is collected in the pool and becomes the lowest pool price. The CC is allocated by
using a long term model with specific conditions according to regulations: Resolutions CREG-
077, CREG-082 and CREG-111 of 2000 (CREG, 2000).
The following section discusses the modelling framework that has been built to asses the effect of
the new CR mechanism that has started operation since 2007.
3 The modelling framework to assess alternative regulatory options in CEM
3.1 Methodological discussion
From a regulatory perspective, the electricity industry has been dominated by a number of
uncertainties at all levels, so stability has been an important objective. The regulator’s task is far
from simple. The regulator strives for a balance between all stakeholders and particularly
between two of them: suppliers and customers. From a simplified perspective, the regulator may
pursue goals to attain intensity in competition so that prices will reflect the incremental industry
cost, with clear signals for effective system expansion to satisfy demand at competitive prices and
good electricity quality.
Electricity markets face uncertainties and complexities which create difficulties for modelling;
where optimisations seem often unfeasible alternative, behavioural methodologies are more likely
to address a number of issues involved. Modelling causality and delays become an important
practice to account for policy effects on the system. In particular, this modelling may indicate the
need for continuous adjustment of the regulatory framework in order to attain the desired system
behaviour. Modelling causality and delays also help investigating whether policies trigger
instabilities which may affect system performance. System dynamics modelling is a tool which
incorporates these elements.
' The CC is estimated based on an indicative plan developed and executed by the Ministry of Energy and Mines. A
set of the worst scenarios is run to determine the “optimal” capacity payment and distributed among those generators
that provide reliable energy (Larsen et al, 2004).
System dynamics has been used to explore different policy issues during the last decades (Bunn
and Larsen, 1992; Nail, 1992; Dyner et al, 1995; Bunn et al, 1997; Dyner and Bunn, 1997; Ford,
1997; Ford, 1999; Dyner, 2000; Ford, 2000). With a system dynamics model, it is possible to
analyse and assess system behaviour under alternative regulatory options.
An electricity system depends on its generation, transport and supply characteristics. It possesses
underlying dominant structures. Behaviour is influenced by physical, technological and
topological considerations. Other softer structural aspects such as institutions, policies and
regulations have both short-term effects on behaviour and a long-term impact on the physical
structure of the system, which reinforce system evolution. Figure 2 indicates the main macro
structure dynamics of such electricity systems. In this case, the system dynamics model takes the
form of a system dynamic platform for policy analysis as explained in (Dyner, 2000).
Physical
Structure
Behaviour
Market “7
Structure
Figure 2. Macro-structure dynamics of electricity systems (Source: Dyner (2000); Arango (2007)).
3.2. The model
The model was built to address some of the problems that the Colombian Electricity Market is
confronting. The main objective is to asses a regulatory option. The challenges describe before
led to the development of a system dynamics model, which takes the form of a system dynamic
platform (Dyner, 2000). It allows simulating the Colombian electricity market from the regulator
point of view. All the parameters were estimated from public data. It was designed at a relatively
high level of aggregation compared to the other detailed production simulation models (see
Appendix B in Ford, 1999). For example, the simulation makes progress on monthly basis, while
the market operates on hourly intervals.
The causal diagram presented in Figure 3 provides a general overview of the model. There are
several feedback loops taken into account. The investment loop is the one that takes into
consideration investors’ behavior. It presents how investments take place in the model. The
dispatch offers market prices as output and prices are signals for investment and market
development. Following, there are investment decisions which will increase installed capacity
after a delay. The new installed capacity changes the topology of the system and therefore the
economic dispatch.
The regulator assesses the system behaviour by following the economic dispatch of the system.
Consequently, the regulator adjusts in the long run the market rules and investment incentives.
The market rules determine the bidding price and investment incentives influence the investors’
behavior and therefore installed capacity. Note that the hydrology influences both bidding
strategies and installed capacity, since it determines water availability. The hydrology is an
external factor. Next, we present a more complete description of the different components of the
model.
- aN
Installed
4 capacity
_~ price
ved
Economi
Investments in dispatch
new capacity
Regulation
intervention
Electricity price
Figure 3. General causal diagram of the system dynamics platform for policy analysis in the CEM
(Source: Arango (2007)).
Demand for electricity
Electricity demand is set according to the scenarios defined by UPME? (2006). Three scenarios
have been defined: low, intermediate and high. The intermediate scenario was taken as baseline
for simulations. The demand scenarios drive energy growth. The model represents the electricity
demand as monthly energy requirements. Hourly and daily volatility is discarded, but the model
includes seasonal variations. The model incorporates the power pool, a clearing mechanism, as it
actually operates in the Colombian Electricity Market.
? UPME: Unidad de Planeacién Minero Energético. A bureau of the Ministry of Mines and Energy in Colombia
(www.upme.gov.co).
The power pool operates as a central electricity clearing-house to dispatch generation to meet
electricity demand. Generators submit daily bids which are supposed to be based on their short-
run variable costs. Note that there is not demand-side bidding, as demand does not actively
participate in the market, in spite of its importance (Ford, 1997). If the pool cannot satisfy
demand, there will be outages and contingent plans will be undertaken. This implies that the
market clearing price will be set at the cost of the most expensive generating unit needed to meet
total demand. Under these circumstances, the model accounts for the demand that is not satisfied
and price will increase according to the maximum bid.
Power capacity
The model disaggregates installed capacity according to four technologies. These are Hydro,
Thermo, Run of River and Coal. Hydro technology represents all the hydro generators with
reservoir, which are modeled with their particular physical structure. Run of river are hydro
generators without reservoir. Gas and Coal plants are treated similarly, assuming fuel availability.
Other technologies are negligible.
The market price and economic dispatch model
The Market Price (MP) is determined by an economic dispatch that resembles the pool price
mechanism of the Colombian electricity pool. Every technology has its own supply curve for
each particular month, under particular macroclimatic conditions. The model takes the four
supply curves and makes horizontal additions in order to get the industry aggregated supply
curve. Once demand equals supply the market clears as presented in Figure 4.
10
Generators bid prices and quantities to the pool. It is expected that bids include not only the CC,
but also the costs of generation. Supply curves were estimated as average of all generators and all
bids, taken historic data since the beginning of the market. The supply curves are aggregated by
technology, seasonal and macroclimatic conditions. See the reference for details (UN-
COLCIENCIAS-ISA, 2000; Zuluaga and Dyner, 2007).
Price
$/kWh
Pool] ‘ Efficient and cheaper
Price capacity swtich
supply curve
* Demand “7
Quantity
Generation capacity kWh
Figure 4. Market clearance and movements of supply and demand curves
An inverse process is followed to estimate the dispatch of each technology. Once MP is
estimated, electricity quantities are calculated for each technology. Note that the total generation
of each technology will result from the economic dispatch plus the minimum generation for the
technology.
MP is given in terms of US$/MWh, it represents the hourly average electricity price during a
month. The process is repeated every time step during the simulation period. This method of
establishing price has been tested under a variety of conditions. Thus, a reduction in the supply
11
leads to an increase in market price, and a gradual increase in electricity demand leads to a
gradual increase in market price.
Note again that electricity demand is represented by a monthly average expressed in MW.
Consequently, the model does not keep track of the hourly or daily demand variations. Thus, we
must use the monthly average price as a market price.
Investment in new generation capacity
Investors may select from the projects registered by UPME. Thus varies from large scale hydro
power generation projects to different sizes of OCGTs (Open-Cycle Gas Turbines). This paper
focuses on OCGTs and hydroelectric projects already registered in UPME.
The investment behavior in the model takes a Real Options approach. According to the Real
Options methodology, the “critical price” -P*- is the price level at which it is profitable to have a
project under consideration (Dixit and Pindyck, 1994). The P* values were estimated externally
(UN-COLCIENCIAS-ISA, 2003). Investors consider a number of variables, including pool
prices, supply-demand balance, technology characteristics and investment incentives. We assume
that these elements are computed into the Expected Price (EP). The EP is therefore interpreted as
investors’ expectations of market development.
The investment decision rule is a comparison between P*, the price at which the project is
profitable, with the EP, the investor expected price. Thus, if P* > EP, there is an investment on
the project with lower P* as long as it satisfy the minimal entry time (construction delay). Thus,
the most profitable project will be the first to be constructed. The model assumes that investors
R
are continuously monitoring market development and price behavior, and therefore the decision
tule is applied monthly. The model satisfactory replicates the past investment decisions during
the period between 1998 and 2004 (Zuluaga and Dyner, 2007).
Hydrology: Water Inflow and ENSO
The hydrology module contains two parts. One is the model that simulates water inflows into
reservoirs. The other is a model of occurrences of the ENSO phenomena. The water inflows
component uses a stochastic autoregressive model depending on the occurrence or not of the
ENSO phenomena. The ENSO one is modelled by backwards sample techniques, which takes
advantage of the more than 100 years of data available for the phenomena and replicates past
occurrences. Both components are extensively documented in UN-COLCIENCIAS-ISA (2003).
Validation considerations
Despite the number of assumptions and constrains, the model satisfactory replicates historical
market behaviour in terms of prices (Figure 5), generation, water level and investments (UN-
COLCIENCIAS-ISA, 2003). Moreover, it resembles oscillatory pattems expected in electricity
markets - boom and bust (Bunn and Larsen, 1992; Ford, 1999; and IEA, 1999). The model was
developed in Powersim*, which includes connections to external data. Follow up research has
used this system dynamic platform at the Energy Institute at the National University of Colombia.
Thus, the model has been tested in connection with other projects. Following, we tum to show
simulation results of system performance under the RC mechanism.
3 Powersim Constructor 5.1. See the webpage for details www.powersim.com.
1B
Precio de Bolsa Real vs Simulado
120 a
2
= 80
= 60 “
G
2 LAs Se ee
# 20 — weet tee
0 r 1 T T T T T T 1
co a fo?) oO oO - = N N oO
> 2? @ o> F SS fF F F Fg
2 ¢ 2 = 2 < o c 2 <
(=) Ss a 3 0 838 oa 2
Tiempo
—+— Precio Real Precio Simulado
Figure 5. Simulated vs. real pool price
4 Policy analysis and simulation results
In this section we simulate possible outcomes of the reliability charge mechanism that has been
implemented in Colombian market since the beginning of 2007. The model allows the use of
different metrics for the evaluation of this regulatory option, including price variations
(volatility), generation capacity according to technology, and system cost.
4.1 Simulating the reliability charge (RC) mechanism
This is a market oriented solution to the problem of security of supply and is based on standard
financial instruments designed for financial markets. The basic idea is to create financial and a
tradable instrument intended to protect buyers from sudden price increases, at the expense of a
premium which the buyer pays monthly. The RC replaces the CC with a market mechanism that
4
reflects the value set by the interactions of the interest groups involved. It includes both demand
and supply, while the regulator only sets the market rules and some parameters.
The main objective of the RC is to induce supply reliability (IEA, 2002). The RC is a payment to
generators for firm energy. The value is set by the regulator in the transition period, but there
would be auctions after 2010. The obligation to supply firm energy works as an option, where the
generator has to supply energy once the pool price is higher than the strike price. The demand to
be covered with obligations is set by the regulator.
The RC is a financial instrument to be traded as call options, which provides the buyer the option
to buy energy in the pool at a given strike price. In compensation, the demand (or buyer) must
pay a premium price to the seller. The generators are the sellers and the demand is represented by
buyers (distributors and traders). However, demand is not active in the process. The generator
must compensate the demand in case the pool price is higher than the strike price; the generators
also have a commitment to provide the electricity agreed upon in the option. The options are
traded in a public auction, where all the demand must be covered. The market is expected to
define the price that electricity customers are willing to pay for reliability by clearing demand and
supply. Thus, the price should move up and down according to the balance of demand and
supply. Note that there is no need for external models that may complicate market rules. In this
case, each generator has to discover how to build a portfolio of plants to guarantee power supply
to its customers. In this manner the market will find the appropriate technology mix to reduce the
probability of electricity blackouts. The electricity price received by generators is:
RC =PR + min(PP,SP)
15
where PR is the option price or what is called the Reliability Charge, PP is the electricity pool
price, SP is the strike price and RC is the Reliability Charge; all measured in US$/MW. Note that
the generators receive the extra revenue due to the option price or premium (RC). As in the
model we use the historical supply curves to estimate pool prices. The strike price and premium
would be set by the new market.
We now present the simulation results of the base case. Figure 6 shows simulations of market
prices and dispatch by technology for the coming 10 years. We observe that the option market
manages to spread rewards to producers, reducing peaking prices during periods of low water
inflow, as it occurs during El Nino periods. Customers benefit for the same reason, and therefore,
the pool price would experience a reduction in volatility. We also observe the upward tendency
of dispatching hydroelectricity plants compared to Gas and Coal ones that remain in the same
range of variation. We may observe that the options market benefit customers in the long-run by
smoothing the effect of El Nifio, but increases the cost of electricity in the short-term.
Market prices Energy dispatch
101 iM a
5,000.
4,000:
2
F
2 <
5s 1 5
g 2 Stike price
wei
—y-Premium price 2,000 2 3 Hydro
ST
1,000. -
2
Month Month
Figure 6. Market prices and dispatch by technology with the current RC.
16
Figure 7 shows the evolution of the installed capacity and system margin under an intermediate
demand-growth scenario. We observe that investment increases, especially in gas generation. We
observe an upward tendency through the simulation. The system margin increases after an initial
reduction, but it begins to fall again at the end of the simulation period.
Installed capacity System margin
10,001 a=
oe 03
ne
2
Hydro
2 s.o0o} ao 1H
y 88s
il
Coal
% = 02!
o I
0 50 100 ° 50 100
Month Month
Figure 7. Installed Capacity and Margin of the system
Results suggest that the RC mechanism might he effective to induce investments. New capacity is
brought on line and increases the system reliability. However, simulations indicate that the
Colombian Electricity Market might rapidly reduce its margin, as the application of this
regulation mechanism might be slightly late. If the system suffers an El Nino similar to the one
registered during 1997-1998 blackouts may take place.
Figure 8 shows sensitivity analysis under different demand-growth scenarios. As observed, under
the highest demand scenarios the likely occurrence of blackouts increase while under the slow
demand-growth scenario the occurrence of outages is reduced.
17
System margin
0.40.
0.35.
: for.
2
1:
%
S$
le pd
1
0.25 =e
3 so
0.20 Og
0 50 100
Month
Figure 8. Installed Capacity under different demand scenarios (1. Base; 2. Low; 3. High)
New investments could unsafely cover, with some delay, what the system requires in terms of
capacity. Regulators should have taken this into consideration as was suggested by analysts and
consultants (TERA, 2001), institutions (Millan, 1999), and academics (UN-COLCIENCIAS-ISA,
2001). In the mean time, demand side management should be considered to reduce the
possibilities of blackouts.
As expected, RC reduces volatility of pool prices. However, the yearly auction with long term
contracts of the RC may reduce competition in the option market and new capacity may only
come on line with some time delay.
5 Final discussion
The CC has expired in 2006 and a different altenative has been implemented. We have initially
assessed the RC mechanism now in place by using a simulation platform in terms of its reliability
and price to customers and volatility.
The new altemative favours thermo electricity. We have observed that the signal resolves the
problem of new capacity, since new investments should become available. Nevertheless, the RC
might result late in its application. New investments may come just after supply problems
emerge, if one strong Nino occurs. Thus, the regulator should be aware of the potential problem
that may emerge in case that an ENSO occurs. The ENSO is not predictable; thus, the regulator
should be prepared in advance to avoid outages.
The simulation model is not intended to be a finished product. Improvements could be made by
including the grid in some detail, by taking a different approach to the load curve for demand
during the day, or by using a different investment behaviour model. Follow up research has used
the system dynamic platform presented in this paper. The Energy Institute at the National
University of Colombia has used the model in different research projects, such as the Microworld
for electricity investments in Colombia (Arango et al 2002) and it was also adapted by some
Latin-American countries (UN-COLCIENCIAS-INTEGRAL, 2000), to explore the potential of
wind technology in the CEM (EPM-COLCIENCIAS-UN, 2004). Thus, the model has been tested
in connection with other projects.
6 References
Arango, S., I. Dyner, I., and E.R. Larsen (2006). Lesson from the Deregulation in South A merica:
Understanding Hydro based Electricity Markets. Utilities Policy, 14:196-207.
Arango, S., R. Smith, I. Dyner, and S. Osorio (2002). A System Dynamics Model to Analyse
Investments in Power Generation in Colombia. 20th Intemational Conference of the
System Dynamics Society, Palermo, Italy.
Amnstrong, M., S. Cowan, and J. Vickers (1994). Regulatory reform: Economic analysis and
British experience. The MIT Press, Cambridge.
Bacon, R.W., and J. Besant-Jones (2001). Global electric power reform: privatisation and
liberalization of the electric power industry in developing countries. Annual Review of
Energy and Environment, 26: 331-359.
Bunn, D.W., and E.R. Larsen (1992). Sensitivity reserve margin to factors influencing
investments behaviour in the electricity market of England and Wales. Energy policy, 29:
420-429.
Bunn, D.W., I. Dyner, and E.R. Larsen (1997). Modelling latent market power across gas and
electricity markets. System Dynamics Review, 13: 271-288.
COMILLAS (2000). Estudio Cargo por Capacidad en Colombia informe final Asociacién
Colombiana de Generadores de Energia Eléctrica. Universidad Pontificia Comillas,
Madrid, Espatia, 10 de mayo de 2000.
Congreso de la Republica de Colombia (1994a). Ley 142 de 1994 - Ley de Servicios Publicos.
Bogota, Colombia.
Congreso de la Republica de Colombia (1994b). Ley 143 de 1994 - Ley Eléctrica. Bogota,
Colombia.
CREG (1996). Resolucion 116 de 1996. Comisién de Regulacién de Energia y Gas—CREG,
Bogota, Colombia.
CREG (1998). Resolucién 113 de 1998. Comisidn de Regulacion de Energia y Gas—CREG,
Bogota, Colombia.
CREG (2000). Resolucion 111 de 2000. Comisién de Regulacién de Energia y Gas—CREG,
Bogota, Colombia.
Dixit, A-K., and R.S. Pindyck (1994). Investment Under Uncertainty. Princeton University Press:
Princeton, NJ.
20
Dyner, I. (2000). Energy modelling platforms for policy and strategy support. Joumal of
Operational Research, 51(2): 136-144.
Dyner, I., and D.W. Bunn (1997). A system dynamic platform to support energy policy in
Colombia. In Bunn, D. W., & Larsen, E. (Eds), Systems modelling for energy policy.
John Wiley & Sons Ltd, United Kingdom, pp. 259-272.
Dyner, I., R. Smith, and G. Pefia (1995). System dynamics modelling for energy efficiency
analysis and management. Journal of Operational Research, 44: 1163-1173.
EPM, COLCIENCIAS, & UN (2004). Mercado de la Energia Edlica en Colombia: Operacion,
Riesgo y posibilidades de Expansién (Wind Energy Market: Operation, Risk, and
opportunities to expansion). Empresas Publicas de Medellin, Colombian Research
Council, and National University of Colombia, Medellin. Final Report, 311 p. (in
Spanish).
Fischer, R., and A. Galetovic (2000). Regulatory Governance and Chile’s 1998-1999 Electricity
Shortage. Serie Economia 84, Universidad de Chile, 37.
Ford, A. (1999). Cycles in Competitive Electricity Markets: A Simulation Study of the Westen
United States. Energy Policy, 29: 637-58.
Ford, A. (2000). Boom and Bust? Understanding the Power Plant Construction Cycle. Public
Utilities Fortnightly, 15th July, pp. 36-45.
Ford, A. (1997). System dynamics and the electric power industry. System Dynamics Review,
13: 53-86.
IEA. (1999). Electricity Market Reform: An IEA handbook. International Energy Agency,
OECD, 107 p.
IEA. (2002). Security of Supply in Electricity Markets: Evidence and Policy Issues. International
Energy Agency, OECD, 177 p.
ISA & XM (2006). Informes de Operacién from 1996 a 2005. Interconexion Electrica S.A.,
E.S.P., and XM, Medellin, Colombia (In Spanish).
Larsen, E.R., I. Dyner, L. Bedoya, and C.J. Franco (2004). Lessons from deregulation in
Colombia: Successes, failures and the way ahead. Energy Policy, 32(15): 1767-1780.
Millan, J.J. (1999). The Second Generation of Power Exchanges: Lessons for Latin America.
Inter-A merican Development Bank, Working paper, Washington, 17 p.
21
Naill, R. (1992). A system dynamics model for national energy policy and planning. System
Dynamics Review, 8: 1-19.
Newberry, D.M (1999). Privatization, Restructuring, and Regulation of Network Utilities.
Massachusetts, The Walras-Pareto lectures, MIT Press, 466 p.
TERA (2001). Escision del SIC - Bolsa de Energia Eléctrica de las Actividades Comerciales de
Interconexidn Eléctrica S.A. E.S.P. y Definicion del Esquema Institucional para las demas
funciones del Actual Centro Nacional de Despacho. Programa de las Naciones Unidas
para el Desarrollo (PNUD), Banco Mundial, by Teknecon Energy Risk Advisors, LLC,
February, 2001, Bogota, Colombia, 4 volumes (in Spanish).
UN-COLCIENCIAS- INTEGRAL (2003). Microworld for investemtns in electricity market in
Latin America. Research Project Report, Energy Institute, Universidad Nacional de
Colombia, Medellin (in Spanish).
UN-COLCIENCIAS-ISA (2001). Opciones de Manejo del Recurso Hidrico en el Mercado
Eléctrico Colombiano. Research Project Report, Energy Institute, Universidad Nacional
de Colombia, Medellin (in Spanish).
UPME (2006). Plan de Expansién de Referencia 2000. Ministerio de Minas y Energia, Santa Fé
de Bogota, Colombia (In Spanish).
Wolak, F. (2003). Diagnosing the California Electricity Crisis. The Electricity Journal, 16(7): 11
-37,
Zuluaga, M.M., and Dyner, I. (2007). Incentives for renewable energy in reformed Latin-
American electricity markets: the Colombian case. Journal of Cleaner Production, 15:
153-162
22