Roche, U. La, "System Dynamics Analysis, a Prototyping Tool for Production System Design", 1992

Online content

Fullscreen
s ics Analysis , a Pro

Dr.U. La Roche

Consultant, Heilighusli 18
CH-8053 Zurich,Switzerland

Abstract

Streamlining a production process, shortening leadtimes and sqeezing
inventories and cost are the highlights of any company restructuring Efficient
factory planning is in the end usually good logistic system design. But to master the
many concurrent problems of an efficient logistic system design in a company it
either takes time to digest all the local improvements or one needs an integrative
method to structure these intertwined problems.

Applying SDA opens the second method, which consistently proved to be faster
and more efficient. This also includes the problem of proper embedding the MRP-
system Analysis of the process-chains of an important machine-tool production
including sales and supply is reported as an illustrative exemple.

The Problem

A profitable production and higher CIM-levels have been and are mostly
taken as synonymous There exists a well documented body on the numerous positive
and negative experiences along the way.

Wildemann (1989) in a major cooperative effort among some hundred

companies in Germany has extracted a few main critical success factors and pitfalls:

Vertical Integration of CIM and business strategy. A horizontal approach
in computer-applications to a business will create a finally non-
integratable sum of CIM-islands.

Vertical integration means a top-down application within strategic business
units,

Leadtimes and Throughput-times ace the backbone of productivity-
control. They are defined and controllable in process-chains only. A necessary
condition of reducing throughput-time is therefore getting the production
organized and imaged as a process-chain.

Chaotic production has attracted high application of MRP-systems,
centering on control of data instead of process. Typical time frames are mostly
several work-weeks.

Order of applying CIM and structuring the process should start with
structuring of the process. But it has been tried often in reverse order,
especially when only the restricted time horizons of an operational view were
considered.

In production there are at least two distinct time frames:

operational production/process:shifts to weeks
production strategy/control:quarters to years

A conclusion on some current procedures to solve the problem extracted from

the experience base of Wildemann (1989) are:

- 355 -

A. Evolution in small operational steps:
it takes a long time, resulting in a weak overall focus

B. Replace existing with new infrastructure in one turnaround
it only takes a short time, but current and future expense in notin
control, because only after installing hardware and software the
problems come up

C Integrate new structure stepwise to new production-strategy

(months to years)
it takes a stable master-plan and one has to avoid adjusting
the organisation to a software unchecked in order not to fall into the
trap of CIM-overkill (see procedure B)

What is wanted would be a method to establish a master-plan.and solve the

problem of adjustement of the CIM-systems and the organisation in a direct approach.

The Prototyping Procedure é
As Moody and Leonard (1990) show, defining a production strategy starts with

its integration into the total business-process, e.g. fig. 1

?
Parts Work_in_Process. Finished
Production Assembly Shipment
: i 83
2 2
Backlog
Orders Delivery

Fig.1 A company's simplified process-chain

The current trends of flexible manufacturing are changing the
product/process matrix from the diagonal in fig 2 to a mostly continuous flow
orientation even for unique products.

- 356 -

| | Unique product} Multiple | Major products | Standard |
! i product t | products j
{Job shop ix i i |
| Batch | x | i |
LAssembly line! i ix ! i
[Continuous fo to jo | X.0 |
flow H i i i

Fig.2 x showing traditional,o showing modern trends of
manufacturing Produkt/Process-Matrix, Moody (1990)

The goal of prototyping is assumed to define the optimum production-process.
including every step from supply until! final payments of clients.An exemple of a
target figure to attain would be the asset turnover

Maximizing asset turnover AT means therefore optimizing the whole process-
chain, not the production process only Fixed assets and current assets are influenced
differently by the requirements of capacity load, flexibility and leadtime.

An optimum capacity load does minimize fixed assets whereas short leadtimes
minimize current assets. But to arrive ata common minimum under the additional
condition of flexibility, the total business-process and its contro!-logic have to be
optimized

Modelling the Business-Process

To tackle this optimizing work in an efficient way, we need a suitable model of
the process, that keeps track of the interrelationship of the control-logic, the stocks
and the leadtimes.In addition we would favor a model which allows to cope with
repetitive operations. supporting our goal of cost minimizing We propose to use
modelling the business process as a structured process-chain. e.g. structured after the
parts-tree of an assembly operation.

Our main working assumption is.that by proper simplifying, any business-
process may be modelled as a pracess-chain of concatenated single process-steps.
By treating sub-systems, which do have variable chaining, such as discrete logistics
operations as integral entities, we arrive at homogenous quasi-continuous process-
models.By verifying the existing business-process station by station for input, output,
leadtime and cpntrol- connections, the building blocks of it are identified, see fig. 3.

2 St) 2

input

>€3

ratescurrent
i
\ 2
\ @
Ne leadtime

soe”

MRP_input

ratejnext

Fig.3 Model building block

- 357 -

Just because we concentrate on parameters such as stocks and leadtime and its
connection to the control-logic treating the process as a continuous flow isa fair
approximation even with an itemized production of individual units
(cars,machines.etc.). This is further justified in most cases by the accounting
procedures following the process proper.

A first result of such an analysis of the business-process is the model of its
different process-chains, showing all the concatenated process-steps with stocks,
‘work in progress and controls including client and supply From this model the stocks
with integrated values, operating cost and capacity loads are given at any moment in
time It is not a model of information-flow or materials-flow, but their integration
with the overall control-system.

Such a process-model. as illustrated in a much simplified version in fig | is the
basis from which to start analysis of dynamic behaviour in order to optimize
structure and control-policies To do so, we advice to follow a clean top-down approach.
Only after having arrived at an optimized structure and control-policy a more detailed
system design is started with sub-systems Especially so for sub-systems, that are not
suitably amenable to treatment by continuous simulation tools.

Such sub-systems belong to the important class of logistic distribstion and
other automatized processes, that are internally coupled by local event-logic
Simulation analysis of this class of sub-systems is to be done using the discrete
simulation tools available (SIMPLE SIMFACTORY etc.)

The top-down approach proposed supports further analysis of such discrete
sub-systems by establishing their optimum integration into an overall control-policy
of the embedding process.

Such a business model will cover the total leadtime from supply to clients
payments and will be used to show the simulated behavior over several times the total
leadtime, mostly months to years.

Referring to fig.2 we will encounter the following situations amenable to
continuous flow models:

[Type of Production Characterized by |
| Chaotic single order limited process step number

| Flexible line limited parts-tree-list number

| Mass production limited options-tree number |

The justification to bypass at the moment discrete-event modelling is drawn by
our focus of interest:We want to optimize first control-loop architecture. flows and
stocks within the long time horizons of optimum production strategy Scheduling.
capacity of equipment. etc. are treated later on subsystems-level and within the time
horizons of operational production.

MRP-system integration into the continuous model is simplified as a forward
or backward scheduled control signal at specified process-steps Going one step
further output of MPS could be detailed, resulting in variations to MRP input for test
purpose. See further comments below for embedding discrete-event submodels Fig 4
does summarize the timing situation for a backward scheduled MRP-signal.

Timing of beck-scheduled MRP/MPS

leadtime between
ry asl
|

Time

stert of planning start of real orders

back-schedule for i'th step of process

Fig.4 Timing situation MRP

The DYNEX-model

A DYNEX-model is available based on a real company case to demonstrate the

results of a process-chain-analysis with a user friendly interface. Once the
model is running, an expert prepares the input-tree of parameters that are critical
and defines the setup of a USER-GAME.

In the DEMO-DYNEX this input tree covers the following parameters

1 set input-signal of planned sales program

2.set real differences of sales plan (forecast) to actual sales

3.set man-weeks per unit

4.set leadtimes in production

5.make choice of variables display

After this operational parameters we define policy parameters also:

6.Do suppliers deliver by net-volume-control

7.or backwards-scheduling of orders to suppliers

8 choice of adding error from deviations

-with backwards smoothing filter
-by adding as capacity contro!
-with additional smoothing for assembly line

The Policy-Choices cover the methods to add an error correction toa
planning There are two choices available:

Progressive filtered deviations

In order to make a forecast, you have to go into the past an equal amount of
time To create a useful forecast for input to a back-scheduling MRP, the deviations
between planned and actual output are progressively filtered and averaged with
increasing amount of back-scheduling e.g. a stage immediately before orders gets as
correction the almost unfiltered difference.

Capacity-mode correction

Avery different policy is to add to the backwards scheduled planned operation
a simultaneous add-on control at every stage involved. (a so called "capacity-control”)
For cases where the difference of real orders and planned orders is small compared
to planned orders, such a policy is usually superior to the progressive filtering.

Fig5 and fig.6 are an exemple of the DYNEX-output,comparing the two policy
choices for a ramp-signal as difference between planning an actual orders.The
capacity-mode proves to be superior for tackling deterministic deviations because the
whole process-chain is corrected D=-demand FIV-finished inventory
sales,SRC-delivery rate at factory outlet.The first 40 weeks show filling of the
pipeline From week 40 on we have normal operation, also the ramp-deviation starts.

selection

——— M20) FIV(G. 1008,
208.— — -SALES(B,,200,) 9 seteeeeees a0 Za
1088,
150, ‘
758,
198,
500,
xa ft 1 [1 |
aay
é ! i
a ‘ | t A :

gtk
@ 18. 20, 38,48, 5B, 59,999 74.999 89,999
TIME

Fig.5 Capacity-mode correction, even SRC is following D

2 0,,200,) Se eetion FICO, ,2000,)
200, — — ~ SALi8(6,,200,) weseseees SRB, 208.)
200.
150, ey
1500, _ Cer i
1. 7 Bi rs = a “hf
la ly he
|. 7 Ns,
50. cbeted” | LT i
588,77. Ex ra | \
’ q
H { ra NLL

"B18, 28 38, 40, 5B, 59.999 74.999- 89,999
TIME

Fig.6 Progressive filtering After exhausting FIV even SALES does not
pick up in time

- 360 -

Embedding discrete-event sub models/working assumptions

Using SDA as a prototyping tool for factory-control-policy is based on the
working assumption, that for almost any production process a reasonably precise
continuous top-down mode! can be defined. As Kettenis (1992) puts it, depending on
the granularity of the model necessary. there exists always a continuous model for
any process.

This assumption is in line with two observations in the field:The trend to
continuous flow strategies for modern. efficient production. see Moody (1990) results
in process-chain structures clearly amenable to continuous models.

Asa recent treatment of the problem of combinations of discrete-event and
continuous simulation shows. it isa continuous simulation with its inherent activity
scanning every time step DT. that can be used as top-level integrating background,
see Kettenis (1992) This is concluded from Kettenis discussion of the four worldviews
of simulation below:

[Worldview ‘exemple of simulation language
| Next event SIMANSLAM

| Activity scanning DYNAMO \
| Process interaction COSMOS SIMPLE. Petri-Net |
| Transaction flows |SIMANSLAM \

With the still limited experience in the field a very preliminary assessment of
compatibility for embedding discrete-event and continuous simulation will expect less
problems with process-interaction languages than With next-event or transaction
flows languages.

We include below an abreviated definition of these four world views:

'Next-event sitting on top of process with event-

i | timer

| Activity -scanning [checking every time step allthe |
variables |

Process-interaction checking every time step the '
process interacting variables

Transacions-flows sitting on the workpieces with the
joblist

To illustrate practical embedding already used, the following cases are shortly
discussed

-MRP-systems

-a comissioning application

-smail lot size chaotic

-line-flow with different products

~general interface discrete-event/continuous

MRP-syste: delling in SDA

The MRP-systems function is coupling of the planning MRP II with the more
detailed execution MPS.

In the most simplified form, the input signal of the planning and the
execution are identical. In general MPS is a transform of the MRP II planning input,
showing volume, attribute and timing differences for the execution back or forward
scheduled contro! signals.

In a continuous model the MRP-system comprises the control signal generator
e.g. as the sum of the planning and the variances of the translation in the MPS.

With discrete-event type execution level we will image its statistical properties
into the continuous top-down model.

A commissioning applicatio:

(a typical discrete-event type of problem)

A possible continuous structure to capture a mechanized stock with
commissioning station could be as in fig.7

(GG

Hlass_s Hass_B lass_C
WZ
I ! r
i i 9 2
| 2 2
al 8 c

2

Transaction_stock

comissioning
transit_time

Fig.7 Class-separation for continuous simulation of commissioning

Small lot size chaotic production

With an upper limit to the kind of process steps used, e.g. as in producing
printed circuit cards a continuous mode! would be a stack of the different process-
chains with vertical connection of common capacities.

roduction line with different products
A common process-chain with parameters such as leadtimes and capacity-

limits controlled by the flow attributes is a possible model.In fig 8 we show the model
of the real company case simulated in the DYNEX-case.

- 362 -

'

cs

Orseyrt©

ee or ne
ere ee

<a

Fig.8 Model of the DYNEX case with sales and suppliers, compare to
the simplified model of fig.1

eral interface discrete-event/continuous
Continuous-Discrete: a unit timer operates the disaggregation of a
continuous rate
Discrete-Continuous: a smoothing operation transforms discrete
arrival of units into a continuous rate
In the experience of the author these above illustrated ideas how to cope with
modelling so called discrete-event processes in continuous fashion have usually
worked well. ”

Conclusion

The purpose of the paper has been to expose the possible contribution of top-
down SDA models of the business-process to speed up logistic system design.

The critical sucess factors for mastering the CIM-levels increasing
competitivity is asking for and the trend towards continuous flow processes
emphasize use of continuous simulation tools

The CSF's were:

CIlM-iategration should be vertical inside business units resulting in

clear models.

Time horizons have to cover several accounting periods, so top-down

models are needed to economize CPU power.

Troughput-time ts in process-chains defined oaly,a precondition to

use continuous models.

A stable verifiable masterplan for CIM-integration is needed:a

process-contro! model with simulation will fill the bill

To effectively support logistic system design by a simulation tool. there isa
choice of four world views available

Next-event

Activity-scanning

Process-interaction

Transactions-flows

As we have seen the Activity-scanning view is the choice for top-level overall
models, which means a continuous simulation ( solving a system of simultanuous
differential equations)

The need to model the control-logic first. before going to more detailed
subsystems again points to use of a continuous model.Not all world views can be
combined afterwards easely with a continuous simulation

A preliminary assessment identifies Next-event and Transactions-flows as
rather separate world views. SIMAN and SLAM belong to that class, which resembles
more to the approach taken by MPS-calculus itself. Others , such as COSMOS, SIMPLE,
and the general class of Petri-Net-Lan guages appear however to be relatively easy to
integrate with continuous models.

Speaking of control-logic we understood this to he contro!-! loops ofa
continuous model. In discrete-event models one uses the word Cantro!-strategy
meaning the logic of the discrete state changes of process elements

A main proposition explained in the paper was . that in any case of a logistic
system design we neeed to cover two rather different tasks:

A. Business-process-control with long time horizon

use a model with coarse granularity to bring out the dominant
control loops. The choice tool isa continuous model with flows,
leadtimes and stocks

B Qperations-process-contro! with short time horizon

use model! with fine detail to bring out intra-process contro!-
strategy Application of discrete-event tools for capacity and
scheduling

References
Wildemann H. editor, 1989 Einfuhrungsstrategien fur neve
Technologien/ 3 Fertigungswirtschaftliches Koloquium
Passau, 15-130

ISBN 3-906156-02-8
Moody PE. editor. 1990 Strategic Manufacturing/DOW-
JONES_IRWIN/APICS series

ISBN 1-55623-193-8
Kettenis D.L. 1992 COSMOS: A simulation language for continuous,
discrete and combined models/Simulation vol 58 No 1,32-41

Trade names
SIMAN.SLAM.SIMFACTORY COSMOS SIMPLE,DYNYMO are trade-names of
software for simulation cited in the text

= 364 =

Metadata

Resource Type:
Document
Description:
Streamlining a production process shortening leadtimes and sqeezing inventories and cost are the highlights of any company restructuring. Efficient factory planning is in the end usually good logistic system design. But to master the many concurrent problems of an efficient logistic system design in a company it either takes time to digest all the local improvements or one needs an integrative method to structure these intertwined problems.Applying SDA opens the second method, which consistently proved to be faster and more efficient. This also includes the problem of proper embedding the MRP-system. Analysis of the process-chains of an important machine-tool production including sales and supply is reported as an illustrative exemple.
Rights:
Date Uploaded:
December 13, 2019

Using these materials

Access:
The archives are open to the public and anyone is welcome to visit and view the collections.
Collection restrictions:
Access to this collection is unrestricted unless otherwide denoted.
Collection terms of access:
https://creativecommons.org/licenses/by/4.0/

Access options

Ask an Archivist

Ask a question or schedule an individualized meeting to discuss archival materials and potential research needs.

Schedule a Visit

Archival materials can be viewed in-person in our reading room. We recommend making an appointment to ensure materials are available when you arrive.