Laura Black 1
Abstract
Many companies have established stage-gate processes in efforts to ensure that product
development processes remain on track and on schedule. In addition, many scholars advocate
that work for multiple years' new products proceed concurrently with staggered launch dates. In
a situation of overlapping product development efforts with stage-gate milestones, engineers
often become a scarce resource that must be allocated among projects in various phases of
development. In this context, I study the effects of allocating engineers to the main product
development activities of design, testing, and problem-solving. While, in keeping with a stage-
gate process, practitioners and researchers often structure their work and methods as though
design and testing were sequential phases, many acknowledge that design and testing emerge
iteratively. In the context of multiple projects, unanticipated cycles of testing and re-design in
one project can jeopardize other efforts' schedules, resources, and management attention. This
paper develops a simulation model in which to explore the long-term effects of testing and
prototyping in an ongoing stream of new product development. Based on research conducted at a
manufacturing company, I hypothesize that actions undertaken rationally to "solve the most
important problems first," such as allocating as many engineers as necessary to fix problems in
the products nearest to launch, systematically undermine testing activities in other development
projects. The analysis focuses on identifying policies for resource allocation that prevent
systematic underinvestment in early problem identification. Policies evaluated include the
timing of testing and prototype builds; priority of testing among other development activities;
correcting a fraction of the defects found through testing; and postponing and canceling
development efforts that fall behind schedule.
Laura Black 2
Introduction
According to a recent survey by the Product Development and Management Association, about
60 percent of U.S. companies use stage-gate processes to ensure that product development
processes remain on track and on schedule, and firms identified as using "best practices" for new
product development have established stage-gate processes to a greater degree. (Griffin 1997).
These methods often set forth a series of cross-functional checkpoints for verifying that new
product development projects are meeting certain criteria such as specification-testing, cost per
unit, or readiness well before the product's scheduled introduction to market.
With much attention on within- project management such as stage-gate or milestone methods,
fewer companies have implemented coherent plans to manage across-project management. As
customer expectations for new and improved products rise, more companies are overlapping
development of successive projects in an attempt to produce a continuing stream of new projects
for their customers. Many researchers simply take for granted that work on multiple years' new
products must proceed concurrently (Wheelwright and Clark 1992), and other scholars advocate
that work for multiple years' new products, particularly for successive product families, proceed
concurrently with staggered launch dates (Meyer, Tertzakian, and Utterback 1997).
In a situation of overlapping product development efforts with stage-gate milestones, engineers
often become a scarce resource that must be allocated among projects in various phases of
development. Griffin's (1997) report on best practices in product development asserted the need
for "tangible and visible top management support of NPD [new product development]... This
includes having a rational process at firms for allocating resources across projects..." While
many acknowledge that product development organizations are often "overloaded" with a
number of projects far exceeding the resources of the group (e.g., Wheelwright and Clark 1992),
few offer clear advice about how to prevent undertaking too many projects (other than "Don't do
it!"), and still fewer provide clues about how to recognize when a development organization has
bitten off more than it can chew (Smith and Reinertsen 1998 offers a welcome exception).
Laura Black 3
Even strategies for trimming the project list regularly or assuring adequate resources for projects
at initiation may not prove sufficient. As certain projects wax in unforeseen problems and others
wane in resources, managers face a dynamically complex situation in which no single strategy is
obviously optimal and no single action can avert with certainty snowballing troubles. As
multiple ongoing projects become more common, people are finding that managing them well
requires more than incrementally managing individual projects.
One manifestation of these poorly understand dynamics emerged from a program manager at
one of our research sites: "We don't know what we don't know until it's real late," he said,
explaining that critical issues in product development projects consistently surface in the last
months before the scheduled market introduction. Design changes to address the critical issues
then throw into furious activity development engineers, component suppliers, manufacturing
engineers responsible for tooling, and people working on dependent projects, straining
communications and jeopardizing product quality. By the time the product hits the assembly
line on the company's annual launch date, according to one wry comment, everyone involved is
holding up "the company's victory symbol--crossed fingers." This particular manufacturing
company has during the last decade established a solid development method, introduced more
rigorous project reviews, and improved in myriad ways its new product development process.
Despite these advances, and despite increasing its engineering staff, creating and staffing a
developmental purchasing group (separate from its operational purchasing group), and giving
heightened focus to new product efforts, the pattern of late testing--and late changes--persists.
Acknowledging that a situation is complex does not provide the people doing product
development with the tools they need to manage their work--admitting "It's a system" is not
enough. Some researchers have long asserted humans' difficulty in recognizing and dealing
effectively with dynamic complexity and the need for formal models to aid us in managing
dynamic operations (e.g., Forrester 1961, Sterman 1989, Sterman, Repenning, and Kofman
1997). Because product development 's work-in-process, unlike manufacturing's, is not
necessarily visible (especially in the early stages of development) and therefore not salient, and
Laura Black 4
because information about the status of new product efforts often relies on successful translation
across functional boundaries, it is likely that the dynamic complexity of multiple-project
development environments poses one of the most confounding areas managers can face. Y et
although multiproject development environments are increasingly important to companies'
market viability and almost certainly poorly understood, few formal models exist to aid
understanding of the dynamics that can emerge and under what conditions certain troubles may
appear.
One exception is Repenning’s (1999) work with a stylized model that showed that, when
development resources are scarce, overlapping projects become interdependent, as problems in
one project can steal resources needed by another. In his model, even a temporary imbalance
between work and resources--such as one bigger-than-usual launch--can lead to a permanent
decline in quality. Similarly, this paper develops a simulation model with which to explore how
within-project and across-project dynamics might relate to each other. Here, however, I
represent testing explicitly as resource-constrained (rather than as an uncapacitated delay, as in
Repenning's 1999 paper) in order to explore the long-term effects of testing and prototyping in
an ongoing stream of new product development. Based on field research at a Midwest
manufacturing company, I hypothesize that actions undertaken rationally to "solve the most
important problems first"--such as allocating as many engineers as necessary to fix problems in
the products nearest to launch--systematically undermine testing activities in other development
projects.
The next section reviews customary uses of testing in product development, and the following
section provides background on the field site on which this model is based. Then I describe the
model's structure. In the "base case" simulation I observe that a temporary increase in workload
can lead to a permanent decline in quality. I introduce structure to represent a prototype build
and observe its slightly stabilizing effect. The exploration then simulates various priorities for
allocating resources in an effort to discern what, if anything, might disrupt the permanent decline
in quality. The surprising result is that allocations that minimize resources to testing create a
more robust system in the long-run. Rather than decline gradually to a permanently lower level,
Laura Black 5
product quality dips sharply but then recovers to its original high level. Analysis reveals that, if
testing doesn't reveal the as-yet-unidentified problems in the product about to launch, engineers
are allocated instead to early phase work on the product scheduled to launch the following year.
This leads us to explore a variety of alternatives in responding to identified problems, including
postponing a portion of the model year's projects; allocating resources to fix only a fraction of
the defects found; and canceling incomplete work altogether.
Conventional Views of Testing and Prototyping
Practitioners and academics agree that testing and prototyping are necessary steps in creating a
new product of high quality. A classic product development textbook by Ulrich and Eppinger
(1995) identifies "Testing and Refinement" as the fourth of five phases portrayed
diagramatically and textually as though they are chronological and sequentially dependent.
Here, as in other writings on product development, testing proceeds based on the output of the
“detailed design" phase, which yields drawings, computer files describing geometry and
production tooling, and specifications for purchased parts (Ulrich and Eppinger, p. 17). The
phase preceding testing, design, is also the one in which manufacturing engineers design tooling
and design engineers define part geometry and choose materials. But if the testing phase
identifies problems, few design changes can be implemented without changing the geometry,
material, or production of the part: A common paradox is that we test to find errors but often
neglect to allot time sufficient to fix those errors and revisit the assumptions that created them.
Most broadly, we assume that testing identifies problems, which are then fixed; therefore testing
ought to improve the quality of the product. This assumption applies to various goals and levels
for testing, such as field testing, reliability testing, life testing, and performance testing, and
testing functionality by component as well as testing system functionality. Furthermore, we
apply this assumption to prototyping as well, which almost all people working in product
development include as part of the testing phase. Ulrich and Eppinger (1995) recommend at
least two prototype iterations during the testing and refinement stage, and Wheelwright and
Laura Black 6
Clark (1992) point out that, since prototyping conveys information across functions, prototyping
‘an "achieve integrated problem-solving...[and] surface broad issues that cut across disciplines."
(Wheelwright and Clark, p. 146). If, however, system-level testing and prototyping succeed--
that is, if they identify cross-functional issues--then project leaders may find themselves with
problems whose physical and departmental dependencies are difficult to untangle, with too few
resources to address the problems comprehensively, and with little to guide them in discerning
the best use of the time remaining before market introduction. Without a clear-cut strategy for
prioritizing problems and resource allocations, product developers lapse into a "fire-fighting"
mode.
Several model-based research efforts have put forth advice about how to reduce unwanted
iterations of design and testing. Eppinger’s Design Structure Matrix (described in Ulrich and
Eppinger 1995) seeks to order development activities so that each phase receives the information
from preceding phases needed to conduct its work. Suggestions for determining the optimal
amount of overlap for concurrent development activities and for streamlining design interfaces
can enhance the productivity within an individual new product effort (Krishnan, Eppinger, and
Whitney 1995). But normative approaches do not address the problems that arise if, as
occasionally in practice, undesirable iterations in a project become necessary. Neither do these
approaches offer insight on how undertaking multiple ongoing projects may alter optimal
practice within a single project. In contrast, this paper explores the logical consequences of the
additional rework cycles that testing and prototyping create and how those consequences play
out in the context of a continuing stream of product development work.
Overview of the Field Site
In 1998 I spent three months at a midsized Midwest manufacturing company, conducting
interviews and observing production activities and meetings in order to prepare an assessment of
the product development process and launch (at the company's request). The report summarized
33 interviews, including 10 project teams and 15 process teams in six facilities. Interview
Laura Black 7
participants represented a variety of departments, including marketing, developmental and
operational purchasing groups, design engineering, data processing, cost accounting, and
manufacturing. Among the top 15 themes identified as "what went wrong" during development
for the model year launched, design instability ranked fourth, and late testing and insufficient
testing resources ranked ninth. (Unless otherwise indicated, quotations following are from the
1998 company report.)
The data collection also included reviewing problem logs kept during development, at testing
facilities, and on the assembly line, and the number of parts officially authorized by engineering
at various points during development. By comparing these with previous years’ records, a
consistent theme emerged: The organization identifies problems in new product efforts later in
the development cycle, rather than earlier. The newly surfaced problems absorb resources
otherwise devoted to projects scheduled for later launch dates. Solving the urgent problems
necessitates changes to product design--both design and manufacturing engineers consistently
decry "late changes," design alterations that take place after a key prototype build occurring
about 8 months before launch. This prototype is, according to the company's product
development methodology, to signal the end of the design. A more recent assessment (prepared
by another researcher) of the company's development and launch activities pointed out, "Builds
serve as targets and launch is the only milestone. Problems are neither resolved nor expected to
be resolved until launch" (company report 1999). This story of late problem identification and
still later changes and of the indirect but inevitable disruption to other projects led us to
investigate more thoroughly the role that testing and prototype builds can play in an ongoing
stream of product development activity.
Symptoms of limited testing capacity emerge from interviewees' comments such as, "We were
unable to get vehicles to put test components on," "We didn't even have equipment to measure
heat--just ‘felt it getting hot,"" and engineers repeatedly encountered "not enough testing
equipment or people." Complaints of late decision-making include observations of late part
changes, migrating scope and specification criteria, "weak follow-through on project
checkpoints"; one project manager's lament, "I wish I knew we had that project earlier"; and
Laura Black 8
another engineer's assertion that the "product was really managed by ‘critical moments." One of
the most persistent complaints recorded in the interviews was that engineers felt as though they
were given mandates to violate the development methodology that they are supposed to adhere
to in order to assure smooth product preparation and launch. Rather than denigrate the
methodology prescribed, engineers expressed dismay at not being given a chance to follow the
company's normative time-lines and insisted that all development groups and functions should
be held equally accountable to adhering to its information and timing requirements. I suspect
that the refrain of "not following methodology" does not reveal managers' and engineers’
disregard for process but rather offers evidence of an underlying structural problem: that the
organization is approaching iterative work with a sequentially specified process. With these
themes from one company's experiences, then, I built a simulation model with which to explore
the timing of testing and alternative allocations of resources that can surface critical issues
earlier in the development cycle so that resources are not subsumed into crises in the work about
to launch.
Description of the Model
For simplicity and tractability, this model assumes that the product development organization
works on projects in two main phases during a period of two years. The company studied
launches new products on an annual schedule, and it works on two major groups of projects or
“model years," each at a different stage of development, at any given time. Figure 1 depicts the
scheme of overlapping product development efforts.
Laura Black 9
Product n+1
Product n+2
Early Phase if
Current Phase i
Model Years Model Years+1 Model Year s+2 Model Year s+3
Figure 1: Overlapping Product Development Efforts
In this model the unit of work is the part. Each model year begins the "early" phase, also called
Y ear -1, with a certain number of parts that must be designed, tested, and possibly revised in
order to assure high quality. The workload of parts to be designed is akin to a company's
compiling developmental part numbers assigned to components undergoing design for a
portfolio of projects to hit the market at the same time--it gives a rough idea of the size of the
model year's work under way. When the company launches Product n in Model Y ear s (market
introduction takes place at a fixed time each year), then Product n+1 transitions from the "early
phase" to the "current phase," and work on Product n+2 begins its "early phase."
The Flow of Work
The model portrays essentially the same activities and sequence of work in each of the two
development phases. In each phase, parts can exist in one of four states: parts to be designed;
prototyped parts; tested parts; and revised parts. Parts move from one state to another based on
the rate of work accomplished, and the work rate depends on the number of engineers assigned
to each activity and the average productivity per engineer in that endeavor. A simplified
diagram of a single phase, Figure 2, shows the accumulation of parts in various states and the
rates that move parts from one state to another.
Laura Black 10
engineers allocated to design engineers allocated to revisions
parts to be prototyped | S291 tested parts revised parts
designed parts
designing testing revising parts
parts prototyped parts 9
testing
revised parts
engineers allocated to testing
Figure 2: The Flow of Work Within a Development Phase
At each product launch, work in the current phase enters the market; work in the early phase
becomes current work, and the early phase begins design of new parts for the model year to
launch in 24 months. When this annual transition occurs, parts in each state of the early phase
move directly to the corresponding state in the current phase. Thus parts that were tested in
Y ear -1 do not need to be tested again in Y ear 0, unless testing discovered a problem that
necessitates revision.
In contrast to Repenning's (1999) work, which portrayed testing as an uncapacitated delay, here
testing is resource-constrained. In this model, I assume that testing takes place under two
conditions: by engineers allocated to testing or by a prototype build that takes place during the
current phase. When testing is resource-constrained, testing doesn't take place unless there are
parts whose design or revision is complete but untried and engineers are allocated to testing
those parts. When a prototype build occurs, all the designed parts are effectively tested within a
one-week period (with no allocation of engineering resources).
Elaborating on Key Assumptions
Laura Black 11
The distinction between "early" and "current" work (I sometimes call the current phase Y ear 0
work) is critical for two reasons. The first concems the probability that engineers make mistakes
when designing a part. In Y ear -1, or early work, the probability of a design error is one-third
that if the part is designed during Y ear 0. I believe this difference appropriately reflects the
benefits of early design completion accruing from fewer complicating interdependencies among
parts when the design is in an earlier stage of completion and from a longer lead time for
choosing materials and processes (although dependencies, material selection, and process design
are not explicitly represented in the model). For simplicity's sake, only one kind of "error" is
represented in the model. It assumes that, when the simulated company launches a "defective"
product, the remaining errors are cosmetic or mechanically nonoptimal but not threatening to the
product's function or the user's safety.
Second, the distinction between Y ear -1 and Y ear 0 work becomes important in resource
allocation. Priority for allotting engineers to the three main activities of designing, testing, and
problem-solving is sharply influenced by how near a project is to its scheduled launch date. This
model represents an organization in which resources are scarce and the slate of new products is
ambitious. There is little slack in the system. The model depicts the company's bias for
allocating more resources to the project nearest to launch by continuously estimating the total
amount of work to do and allocating as many engineers as needed (or as many as are available)
to the following activities in descending priority:
« Designing Y ear 0 parts;
* Testing Y ear 0 parts;
* Solving problems in Y ear 0 parts;
« Designing Y ear -1 parts;
* Testing Y ear -1 parts; and
* Solving problems in Y ear -1 parts.
Since this way of prioritizing is similar to those in the phases outlined by Ulrich and Eppinger
(1995) I call this the "Textbook" Allocation. It is a rational, robust method for allocating
engineers to work: If there is no work to be done in a particular activity, no engineers are
Laura Black 12
assigned to it. If the organization is feeling pressure from an overload of incomplete or
problematic parts when launch is imminent, it pulls engineers from other activities onto the more
urgent efforts.
Additional simplifying assumptions include the following.
¢ Parts are treated as though they are independent; a problem in one part doesn't necessitate
changes to other parts.
« Engineering resources are fungible; engineers may be allocated to any of the three activities
on any part.
¢ There is no cost to productivity when engineers are moved from one activity to another.
The "base" workload in these simulation is 700 parts, comparable to what the field site studied
actually undertakes. Diagrams and an equation listing of the model are attached as an appendix.
Most of the following simulation experiments explore the effects of a one-time increase in
workload and analyze the long-term as well as short-term impacts on the quality of products
launched. In each of the simulations below, the one-time (i.e., one model year’s) increase in
workload takes place at the beginning of the third year of simulation. Because the development
cycle represented is two years, that higher-content model year launches at year 5. I believe that
a one-year increase in parts-to-do poses a reasonable test of the product development system's
robustness. One might consider that every fifth or sixth model year, a dramatic revision of the
platform takes place, and this revision is the temporary increase in parts. Alternatively, one
could think of the transient increase in workload as resulting from implementing a new
development process or technology, rather than a simple increase in parts. In any case, it seems
appropriate to model a surge in workload in order to understand the range of possible effects on
the system and its output. Another possible interpretation is that a one-time pulse in workload
results from unusual events in the company's life. For example, in the company studied, two
new plants opened during one year, without reduction of the product development workload or
addition of staff; even though the product development facilities did not move, all the
manufacturing contacts for organizing new parts for the next model year and assuring a smooth
Laura Black 13
launch were unable to give timely attention to the developing projects. Several project teams
interviewed complained of poor new parts management in the plants. One product development
team whose output entered production at one of the newly opened plants complained specifically
of "smooth manning with a spiked workload."
To assess the "health" of the product development system, I focus on quality, proxied by a
percentage of the new model year parts designed and launched correctly. Parts that were
incompletely or incorrectly designed (in other words, parts with errors) detract from quality.
This measure of the system is also based in fieldwork. One interview yielded the assertions that
“quality is the default variable that moves" and that the team "can't move any [other] variables
[including] time, people, or dollars." Another project team suggested that expectations for low-
cost, on-time delivery came “at the expense of quality."
Model Results
Initial Results: Tilting Into a Regime of Lower Quality
Figure 3 depicts a series of simulations in which the temporary increase in workload is raised
incrementally.
Laura Black 14
Figure 3: Quality, With a Temporary Increase in Workload in Y ear 3,
"Textbook" Allocation with Resource-Constrained Testing
The vertical axis shows quality as a percent of parts launched without error; the horizontal axis
shows time in years; and the third axis (going "into" the page) indicates the temporary increase
in workload as a percentage of the base workload. If we look at the three-dimensional surface
when the temporary increase in parts is 0, we see that throughout the 15 years simulated the
quality of the product launched remains at 100 percent. As we follow the Size of Shock axis to
about 40 percent, however, we observe a slight dip in quality about year 5, when the higher-
content model year hits the market. Even more interesting, over time quality continues to
decline, even though the workload of every other model year is again its original value of 700
parts. For higher increases in workload, we observe a marked decline in quality; the higher the
temporary workload, the faster quality declines. Quality stabilizes, however, at about 86
percent, the maximum quality achievable when the organization conducts no work during the
Laura Black 15
early phase but does all design, testing, and (not quite enough) problem-solving in the 12 months
preceding launch.
An array of phase plots helps explain concisely why quality can decline permanently though the
strain on the workload-resource balance is temporary. In Figure 4, the horizontal axis shows the
fraction of parts prototyped during the early phase for Model Y ear s-1, and the vertical axis
shows the fraction of parts prototyped during the early phase the following year, for Model Y ear
s. Points along the 45-degree line indicates an equilibrium--the company will consistently
complete that fraction of early phase work year after year.
1
0.8
0.6
0.4
0.2 a
Fraction Prototyped During Year 0 for Model S
Fraction Prototyped During Year 0 for Model S-1
Figure 4: Phase Plots, "Textbook" Allocation With Resource-Constrained Testing
At one extreme (the top right), we can see that, if the organization designs in the early phase 100
percent of the parts for a model year, it can do the same the next year. At the other extreme (the
lower left), we see that if the organization designs no parts during the early phase for one model
year, it cannot "catch up" and design some parts during the early phase for the next model year.
Laura Black 16
Consider that, if no parts are prototyped during Y ear -1, then all the design must be completed
during Y ear 0. To accomplish this, all resources must be allocated to design in Y ear 0. Then,
because the probability of error in design is higher for work completed during the 12 months
before launch, all resources must be devoted to solving problems identified through testing.
Even with “all hands on deck," the group cannot correct all the defects before the launch date
arrives, and the new model year, perhaps with missing bolts, leaky oil pans, or unevenness in
paint meets the market. With the launch of that product, engineers face anew the task of
designing all the new parts for the next model year within the next 12 months, since none of
them were allocated to early phase work. In the mid-range, we see that when the organization
completes in Y ear -1 more than about 75 percent of the prototyping for a model year then it can
recover to complete slightly more of the prototyping in the early phase for the next model year,
and even more for the following one. In this way, it returns to the equilibrium at which nearly
100 percent of the design for a model year takes form during the early phase of development.
Once the early phase prototyping drops below a certain threshold, however, the percent
prototyped in Y ear -1 declines year over year.
One might call this descent into a lower regime of quality "tilting," to indicate that the initial
equilibrium, in which quality is consistently high, is unstable; with sufficient perturbation, the
system moves to a more stable equilibrium. A reduction in workload can lead to 100 percent
completion of the early phase work each year, while an increase in workload can lead to 0
percent completion of the early phase work each year. It is important to note that, once quality
declines, even though the workload returns to its initial level, quality does not improve. It is
possible for a multi-project development environment to slip into a regime of lower quality and
remain there, even though engineers work as diligently as ever. Understanding why this decline
can occur--and why it can persevere--necessitates exploring the dynamics resulting from
resource allocation priorities.
The Dynamics of Resource Allocation
Laura Black 17
Since there is little slack in the product development system, in order to complete all the work at
a high quality some work must take place during Y ear -1, when the percentage of work done
right the first time is higher. A simplified representation of the model used in this research,
shown in Figure 5, portrays the dynamic pressures (indicated by loops) that bear on resource
allocation. (In this streamlined diagram, each phase's parts to be designed, parts to be tested, and
parts to be revised are aggregated in the stock labeled "work to do.") Beginning at the lower left
of Figure 5, we see that more Y ear 0 work to do leads to an increase in resources allocated to
Year 0. This increases the Y ear 0 work rate, which reduces the accumulation of undesigned,
untested, or unrevised parts in Y ear 0. This process of balancing resources to work is referred to
as the Y ear 0 Work Completion Loop. A similar process exists for Y ear -1.
*
Year -1
Completion Loop
doing work in
resources
allocated to work to do in Year-1 coe in
Year-1 H— 4 Year-1 _———.—— Year-1
maximum possible a
number of errors in
transition in model year ' transition in work
work todo DX] ; xT" completed
Tilting Loop ' An) \ :
‘ quality '
AR) ' Error '
i/ Acceleration Y
A / Loop - +
+ . work
resources <<} work to do in SF — > completed in
allocated to Year 0 ‘i Year 0
Year 0 doing work in
Year 0
Year 0
Completion Loop
@
Figure 5: Dynamics Arising from Resource Allocation
Laura Black 18
As resource allocation to Y ear 0 increases, however, resources allocated to Y ear -1 necessarily
decrease, since resources are finite in this model. Then less work is accomplished during Y ear -
1. At the next model-year transition, incomplete work in the early phase suddenly becomes
incomplete work in the current phase. Since Y ear 0 work receives priority, resource allocation
to Year 0 increases again, perpetuating the lower Y ear -1 work rate. This phenomenon is
“tilting"--when the reinforcing dynamic that shifts resources between phases dominates the
within -phase completion dynamics and drives more and more work to be completed only in the
last months before launch.
Figure 5 shows an additional aggravating dynamic, the Error Acceleration Loop, which can
serve to destabilize further the development effort and perpetuate the lower quality output. As
stated earlier, work completed in the early phase generates fewer errors than work completed in
the 12 months immediately preceding launch. As incomplete work in Y ear 0 increases, the
possible number of errors increases--the maximum number of errors in prototyped parts can
result if all parts are designed during Y ear 0 and none are designed during Y ear -1 (although if
parts-to-do are not designed at all, quality declines still further). When errors in prototyped parts
are discovered through testing or a prototype build, engineers must be allocated to revise the
defective parts. This slows the overall completion rate for work in the Y ear 0 phase. As the
work completion rate decreases, Y ear 0 work-to-do is higher than it otherwise would have been
and the maximum possible number of errors in the model year increases. This reinforcing
feedback drives more work to be completed later in the development process.
Based on the parameters here, if the simulated company tries to complete all a model year's work
within the 12 months before its launch, it does not have sufficient resources to design (with a
higher probability of mistake) all the parts and then fix all the problems it creates. A one-time
increase in parts per model year can "tilt" a healthy product development organization into doing
a greater percentage of a model year's work during the 12 months before launch each year. Once
the company is caught in the "fire-fighting" mode, since it favors completing all Y ear 0 activities
before undertaking any Y ear -1 efforts, it is caught, continuing to operate in a lower-quality
regime long after the workload returns to its original level.
Laura Black 19
Discussion of Simulated Policies
I test several policies to see what might ameliorate or eliminate the decline in quality that
follows a temporary imbalance between workload and resources. For ease of comparison, I
explore these policies using the same test--a one-year increase in workload beginning in Y ear 3--
although other shocks to the system, such as a temporary reduction in engineers or a temporary
increase in the probability of error, would serve as well. The policies initially explored include
introducing a prototype build during the 12 months preceding launch; dedicating engineers to
testing; and altering the priorities for allocating resources.
Policy: Prototype Build During Year Before Launch
I first introduce a prototype build during the 12 months before launch (during Y ear 0). The
build acts as a test for all parts prototyped to date. Like the builds that take place on the
manufacturing line at the field site researched, the simulated builds take place over about a one-
week period, make use of all prototyped parts for the model year about to launch, and consume
no (design) engineering resources. In these simulations the prototype build takes place 34
weeks, or about eight months, before launch each year.
Laura Black 20
0.0
0.1
Size of Shock
Figure 6: With Prototype Build 34 Weeks Before Launch;
Quality, With a Temporary Increase in Workload in Y ear 3,
"Textbook" Allocation with Resource-Constrained Testing
Comparing Figure 6 with Figure 4, we see that the build has a mildly stabilizing effect. A
slightly larger shock to workload is required to tilt the system (the 100 percent surface is
marginally broader). After the temporary increase, quality declines at a slightly slower rate (the
slope to the lower left is more gradual) to a slightly higher equilibrium level (about 87 percent,
rather than 86 percent).
Since the build acts as testing, it relieves engineers of testing responsibilities and allows more
engineering-weeks to be devoted to other activities. First, when the high-content model year
enters Y ear 0, nearly 300 parts remain to be prototyped, and all engineers are removed from
other activities and allocated to Y ear 0 design. When the build occurs 34 weeks before launch,
many problems are identified, but since some parts still need to be prototyped, no engineers
Laura Black 21
immediately move to address the problems; design takes priority over problem-solving. Once
Y ear 0 parts are prototyped, then all the engineers move to the activity of the next highest
priority, problem-solving. Only after almost all problems are resolved do engineers move on to
early phase prototyping.
In contrast, in the no-build scenario, no testing of Y ear 0 prototyped parts takes place until all
parts are prototyped. As parts are tested, some engineers move to problem-solving. Testing and
problem-solving proceed currently, since testing doesn’t demand the entire engineering staff.
Meanwhile even a few engineers are allocated to Y ear -1 design. As more Y ear 0 problems
surface in testing, however, a majority of the engineering staff moves to problem-solving,
leaving fewer to continue early phase prototyping.
When the high-content model year launches, most of its problems have been corrected, but little
prototyping for the next model year has been accomplished during Y ear -1. Relatively, though,
more early phase design is completed in the scenario in which the build takes place, and this
leads to a less steep decline in quality when that model year hits the market than in the original
scenario. Introducing a prototype build eight months before launch creates a more gradual
decline in the fraction of the model year parts prototyped during the early phase and a more
gradual decline in quality than the scenario without the prototype build during the transient
phase--but at equilibrium in both scenarios, no early-phase prototyping takes place and quality is
permanently lower. The build scenario’s quality at the final equilibrium is slightly higher than
the no-build arrangement, but the marginal improvement would not lead anyone to assert that
introducing a prototype build could alleviate the dangers of the tilting dynamic in the model.
Timing of the Prototype Build
I explore the effects of build timing by creating a scenario in which the build takes place 16
weeks, or 4 months, before launch. In Figure 7, we see that the system is slightly less stable--a
smaller shock erodes productive capability--though the final equilibrium of quality settles at 88
Laura Black 22
percent, just above both the no-build scenario and the scenario in which a build takes place 8
months before launch. Nevertheless, the tilting dynamic remains.
LIZ SGN
wae d PiaZ ie -
0.94
0.85
Figure 7: With Prototype Build 16 Weeks Before Launch;
Quality, With a Temporary Increase in Workload in Y ear 3,
"Textbook" Allocation with Resource-Constrained Testing
The slight difference in stability arises because here the prototype build is late enough that
engineers complete Y ear 0 prototyping and begin testing and fixing the problems they find, so
the organization loses to testing some of the engineering-weeks freed by the other build scenario.
Then, when the build does occur in this scenario, it surfaces all remaining problems in the
prototyped parts, and all engineers move to problem-solving for Y ear 0. By the time the high-
content model year launches, most of the engineers have moved on to Y ear -1 prototyping, but
still fewer parts are prototyped during the early phase than in either of the other simulated
Laura Black 23
experiments examined thus far. This accounts for the slightly steeper face in the surface of
Figure 7 showing the sharper decline in quality after the initial imbalance between work and
Tesources.
In this model there is no distinction among types of defects; here we assume that prototype
builds and testing performed by engineers are equally capable of identifying all problems. In
reality, there are many different kinds of defects, and different forms of testing focus on
identifying particular kinds of problems. Prototype builds are often intended to identify system-
level problems and interface issues (Wheelwright and Clark 1992; Ulrich and Eppinger 1995),
while testing by engineers may focus on component-level problems, material strength, or
detailed fitment issues.
When projects fall behind schedule, however, builds that could surface system-level defects may
in effect degenerate to fitment and component testing. This, in fact, may be the case at the field
site studied, as indicated by comments such as "Builds [are] not surfacing all substantive issues--
volumes and mix of [model] builds are low" and the assertion that engineers are "thinking the
builds are just to give us test vehicles." Once expectations for prototype use begins to
deteriorate, builds quickly become used for the wrong reasons, as engineers become more lax
about having design truly completed before a prototype build takes place. "[We were] not ready
for the builds," one engineer stated. Another said, "At worst, we field-test ...at the dealers."
Policy: Dedicating Resources to Testing
Next I examine the results of dedicating resources specifically to testing activities. Figure 8
shows the results of a series of simulations in which the temporary increase in workload is raised
incrementally when one engineer is allocated only to testing. In this scenario, the engineer
dedicated to testing is the only resource to perform testing (if other engineers are available, they
work on other activities), and no matter how many engineers are needed for higher priority
activities, this one engineer remains dedicated to testing.
Laura Black 24
Figure 8: With One Engineer Dedicated to Testing;
Quality, With a Temporary Increase in Workload in Y ear 3,
"Textbook" Allocation with Resource-Constrained Testing
We note two characteristics in particular: the robustness and the overall lower quality. The
system is robust, in the sense that it can recover from the temporary imbalance between
workload and resources. The highest quality achievable in this scenario, however, is lower than
in other scenarios (96 percent, instead of 99.9 percent). To understand how dedicating one
engineer to testing brings about this result, it is helpful to compare one of the above simulation
Tuns with situations in which no engineers are allocated to testing and two engineers are
allocated to testing. Figure 9 shows a one-time 90 percent increase in parts-to-do for simulations
in which zero, one, and two engineers dedicated to testing.
Laura Black 25
1 Engineer
Dedicated to Testing
0 Engineers
Dedicated to Testing
0.84 7 2 Engineers
Dedicated to Testing
Time
Figure 9: Comparing 0, 1, and 2 Engineers Dedicated to Testing,
With a 90 Percent Temporary Increase in Workload
When two engineers are dedicated to testing, equilibrium quality is worse than when no
engineers are dedicated to testing. These examples highlight the nature of the unstable
equilibrium and the ways that any imbalance can work toward a permanent decline in quality. If
no engineers are allocated to testing, when the surge in parts-to-do occurs, engineers design
many but not all of the parts during the early phase. As the high-content model year enters Y ear
0, all engineers remain allocated to design until all 1450 parts are prototyped. Then all engineers
move to testing Y ear 0 parts, and they quickly surface many problems in the prototyped parts
(since some of the parts were prototyped during the current phase, the probability for error in
those parts is higher than for those designed during the early phase). Then all engineers move to
problem-solving in the current phase, but they are unable to correct all the errors before the
high-content model year launches. At that time, the regular-size model year that has been in the
early phase enters the current phase, with no parts prototyped (since all engineers were working
on the parts about to launch). All engineers begin designing those parts, but with the higher
probability of error of current phase prototyping, they make many mistakes, too many to correct
Laura Black 26
before the model year hits the market. Then they face again a 700-part model year with no parts
designed as of yet and 12 months until launch.
If one engineer is dedicated to testing, then when the surge in workload occurs fewer parts of the
high-content model year are designed during the early phase, since there is one less engineer
available for design activities. More parts must be designed during Y ear 0, when the error
fraction is higher, and all remaining engineers are allocated to prototyping until all parts are
designed. Since there is only one engineer allocated to testing activities, only some of the
problems in the prototyped parts are identified; some of the engineers work on addressing those
problems, but the rest move on to designing the next (regular-sized) model year during the early
phase. When the high-content model year launches, not all of the problems in design have been
identified, and not all the identified problems have been corrected. As engineers complete
design of the remaining parts of the next regular-sized model year, some then move to
addressing the problems identified by the lone tester, but the problems found do not consume all
the engineers' time. So some begin prototyping the next model year's parts during the early
phase. Each year following, more and more work is completed during the early phase, when the
error fraction is lower, and quality gradually improves.
If two engineers are dedicated to testing, when the surge in workload occurs still fewer parts of
the high-content model year are prototyped during Y ear -1, since two fewer engineers are
available for design. This means that more parts must be prototyped during Y ear 0, when the
error fraction is higher. Since two engineers are always available for testing, they quickly find
all the errors in the parts designed. Again, in the weeks before launch all engineers (except the
ones dedicated to testing) work on solving problems in Y ear 0 parts. When the high-content
model year launches, the regular-size model year that has been in the early phase then enters
Y ear 0 without any parts having been designed. Engineers cannot prototype all the parts and fix
all the problems before the regular-size model year launches, and quality declines.
Hence we observe that dedicating some engineering time to testing helps in the situation above
not so much because problems are identified sooner but because the policy works to constrain
Laura Black 27
the number of problems identified and so limits the engineers allocated to rework. This
effectively weakens the Tilting and Error Acceleration loops.
Policy: Altering the Priorities for Allocating Resources
I also varied the priorities for allocating engineering resources to the activities of design, testing,
and rework. One of the more interesting results emerged from a scheme dubbed "Urgent First,"
since engineers are devoted first to solving problems and designing parts in Y ear 0, then to
problem-solving and designing in Y ear -1, and testing in either phase receives the lowest
priority. Specifically, the priorities in descending order are:
¢ Solving problems in Y ear 0 parts;
* Designing Y ear 0 parts;
* Solving problems in Y ear -1 parts.
* Designing Y ear -1 parts;
* Testing Y ear 0 parts;
* Testing Y ear -1 parts; and
While this clearly exaggerates the bias toward perfecting the projects closest to launch and the
"fire-fighting" heroism that often accompanies working under a deadline, it serves a useful
purpose, for the simulation shows a phenomenon significantly different from those observed
before (see Figure 10).
Laura Black 28
Figure 10: Quality, With a Temporary Increase in Workload in Y ear 3,
"Urgent First" Allocation with Resource-Constrained Testing
As the high-content model year enters the market in Y ear 5, quality declines sharply, to 75
percent. The next model year, which contains the base workload of 700 parts, launches with
quality almost as low (about 77 percent). Although quality continues to improve, it doesn't
return to its original value of about 99 percent until five more model years (of 700 parts each)
have entered the market.
As before, when the workload exceeds the engineering resources, the lowest-priority activities
simply are not accomplished. In this case, the omitted activities are testing during each phase.
Without testing, there are no identified problems to solve. If problem-solving does not absorb
engineering resources, then engineers are allocated to other activities--such as designing parts
during Y ear -1. The phase plots for the simulations under this allocation scheme are particularly
Laura Black 29
revealing (see Figure 11). Clearly, no matter how large the temporary increase in workload may
be, the system doggedly recovers.
wv
gos
&
> av Voea
a ae Ee callie
Ros = NLA a
F ~ 3
: — L=
5 ~
3 .
£
0
0 02 04 06 08 1
Fraction Prototyped During Year -1 for Model S-1
Figure 11: Phase Plot, "Urgent First" Allocation With Resource-Constrained Testing
The low priority of testing means that no problems are identified in Y ear 0 parts, and so fewer
resources are allocated to completing the model year about to launch. In terms of the feedback
loops identified in Figure 5, this weakens the Y ear 0 Completion Loop, making more resources
available for the Y ear -1 work and so strengthening the Y ear -1 Completion Loop. This allows
the reinforcing Tilting Loop to work in a virtuous direction, and in the years following the surge
in workload more and more parts are designed during Y ear -1, thus gradually improving quality.
Based on these simulated experiments, I offer two assertions for consideration by people
practicing product development. First, in an ongoing stream of new products, when projects are
Laura Black 30
under development concurrently, it is possible that the effects of one project's demands--whether
stemming from outsized scope or inadequate early planning or experimental process
technologies--can exact their toll on other later projects whose scope, planning, and other aspects
may be entirely adequate. Second, this simulated scenario leads to the counterintuitive proposal
that additional testing does not necessarily improve quality--at least in the long-term. It also
suggests some reinterpretation of the dynamics of the product development system. I have
assumed that the goal of the product development system is to achieve high quality--that is, to
complete all the work with as few errors as possible. The development phases described by the
literature and practiced by companies are designed to serve that end. The “Urgent First” and
“Textbook” allocations’ results, however, reveal that the combination of modeled policies work
together in such a way that might more accurately be described as reducing the identified (Y ear
0) problems to 0. Evidently there are at least two ways to achieve that goal: to fix all the
problems found, or to find no problems.
In an organization where engineers are a scarce resource and people often feel pressure to choose
carefully how to invest their time, it is possible that problem-solving could become esteemed as
an activity more worthwhile than testing. Testing, after all, discovers problems; it brings bad
news to everyone's attention. Addressing problems, however, allows engineers to bring good
news to their colleagues and managers; and the closer the product is to launch, the more relieved
everyone is that errors have been corrected. This can lead to rewards for "fire-fighting" that
reinforce people's extraordinary efforts to improve projects close to launch rather than company-
wide investment in identifying problems early. Although this model does not represent
explicitly rewards within organization, data from case studies and my own experiences in
organizations may permit some leeway in hypothesizing what might create and sustain certain
priority schemes in an organization.
In the interviews conducted for the launch assessment, the "number one concern" expressed by
engineers was low staffing. Insufficient resources posed difficulty for design engineering,
manufacturing, and staff for support activities bridging engineering and manufacturing with new
parts support, assembly drawings, and documentation. Others framed the problem as high
Laura Black 31
workload, "overloading the product development factory," or, as one engineer said, "The harder
I work, the more I have to do." High workload and low staffing point to the same imbalance
between work-to-do and resources. Furthermore, many people in the company expressed some
understanding of the consequences of such an imbalance. "There is time for only one priority,"
one team member said. "The only priority is the current model year," another offered. "What
prevents people from raising issues?" queried a manufacturing engineer. "Short-term thinking"
dominates, conceded one project team. Another team concluded that "the pervasive culture--
we're a great fourth-quarter team--helps us and hurts us." A staff group saw only harm arising
from the norm: "[The] culture helps us get through fire-fighting but hurts us overall."
Recall that one program manager said, "We don't know what we don't know until it's real late."
These simulated scenarios and the interview data suggest that several dynamics (which reinforce
each other) contribute to late identification of problems: testing as a low-priority activity among
engineers; testing as an activity unrewarded by the organization; a low percentage of parts
designed when the prototype builds take place; and rework from late testing sabotaging early
work on subsequent product development efforts.
The Role of Prototype Builds in the Low-Priority-T esting Environment
To explore further the above assertions, I introduce a prototype build in the scenario with the
“Urgent First" allocation scheme. Figures 11 and 12 depict scenarios in which a prototype build
takes place 34 weeks and 16 weeks before launch, respectively.
Laura Black
Figure 11: With Prototype Build 34 Weeks Before Launch,
Quality, With a Temporary Increase in Workload in Y ear 3,
“Urgent First" Allocation with Resource-Constrained Testing
Quality
Figure 12: With Prototype Build 16 Weeks Before Launch,
Quality, With a Temporary Increase in Workload in Y ear 3,
"Urgent First" Allocation with Resource-Constrained Testing
32
Laura Black 33
At first glance, it may seem surprising that the earlier build does not send the system into a
permanently lower equilibrium. This does not transpire because, in the model year following the
temporary increase in work, relatively few parts are prototyped when the build occurs 34 weeks
before launch. So even though engineers move to problem-solving activities for Y ear 0, there
are so few problems found in the few parts designed that they soon move back to Y ear 0 design.
When they have designed the remaining parts, (since testing is lowest priority) they move on to
designing parts for the next model year during its early phase. In this way, gradually the system
recovers because each year more and more work is completed during Y ear-1. Even when
quality is at its lowest, it remains above 80 percent, a 5 percent improvement over the
comparable no-build scenario.
In the scenario in which the build occurs 16 weeks before launch, quality's lowest point is yet
higher--above 88 percent. But the late prototype build brings back the tilting dynamic. Here, in
the year following the high-content launch, engineers have completed prototyping nearly all of
the Y ear 0 parts when the build takes place (about four months before launch). Therefore the
build surfaces many more problems. All engineers are allocated to solving Y ear 0 problems, and
no early phase work for the next model year takes place. Hence we see the permanent decline in
quality in this scenario. The system relies on prototype builds to surface all problems; when the
build takes place, depending on how many parts have been through the first iteration of design, a
proportional number of problems will be identified, which will then demand resources that
otherwise might be devoted to preventing problems in the next model year.
Of course, one would never recommend that a company abandon testing its new products under
development. The above findings simply highlight that in multi-project environments we need
policies that prevent rework in one project from undermining work on other projects. In other
words, we need to identify policies that can help the organization withstand pressures that lead to
tilting. Since it is unreasonable to conclude that long-term quality can improve if testing
activities are simply omitted, the next steps explore alternative policies for dealing with
identified problems under the original "Textbook" Allocation of engineering resources:
Laura Black 34
postponing incomplete work; correcting only a fraction of the defects; and canceling incomplete
work.
Policy: Postponing Incomplete Work
In the interviews conducted at the field site, I found that occasionally projects were moved from
one scheduled launch date to the following model year. Often this decision emerged from one of
the project review meetings taking place between four and eight months before the originally
scheduled launch date. Several project teams complained that these postponement decisions
were made too close to the scheduled launch, and others pointed out that postponing efforts did
not always solve the project's problems and even sometimes exacerbated them. "Delaying
projects doesn't solve the resource shortage," asserted one group. In one case, the decision to
postpone a project was made after engineering resources for the next model year had already
been allocated to projects, and the team whose problematic project was delayed again faced
continuing problems with no resources available to solve them.
Convinced that it is worthwhile to simulate a policy of postponing incomplete work, in the
model I introduce a checkpoint during Y ear 0 (whose timing can be varied). At the checkpoint,
all parts that have not yet been designed are removed from the model year in the current phase
and added to the model year in the early phase. For simplicity's sake, only the parts not yet
designed are removed; parts that have been prototyped but that contain errors are not postponed.
Because we assume that postponing parts incurs no cost to productivity and because we assume
no interdependence among parts, the simulated results of postponing should appear much rosier
than those a company adopting this policy might actually experience.
Figure 13 shows the results of postponing parts that have not been designed six months before
launch. Instead of focusing on quality, however, in this three-dimensional graph we look at
performance--a measure representing the quality of the parts launched times the percentage of
the model year that actually enters the market.
Laura Black 35
Performance
Figure 13: When Undesigned Parts are Postponed 6 Months Before Launch,
Performance, With a Temporary Increase in Workload in Y ear 3,
"Textbook" Allocation with Resource-Constrained Testing
Beginning in Y ear 5, the year that the high-content model year launches, parts are postponed at
the checkpoint if the increase in workload exceeds about 40 percent. The greater the shock in
Y ear 3, the greater the number of parts postponed. These postponed parts are added to the next
model year's work-to-do. At the following year’s checkpoint, even more parts have yet to be
designed, so more parts are postponed, and the fraction of the intended model year (the base
workload of 700 parts plus the postponed parts from the previous year) declines. Each year
following, more and more parts are delayed and performance (as measured here) degrades
further as the workload, with years' accumulation of postponed parts, grows more and more
unwieldy. Always postponing and never canceling incomplete parts exaggerates the
deterioration in performance; if we ignore the backlog of postponed parts, about 90 percent of
the base workload of 700 parts launches each year.
Laura Black 36
If we look only at quality (see Figure 14), we see that it deteriorates only slightly.
Figure 14: When Undesigned Parts are Postponed 6 Months Before Launch,
Quality, With a Temporary Increase in Workload in Y ear 3,
"Textbook" Allocation with Resource-Constrained Testing
Although the results are not graphically presented here, I also simulated making the
postponement checkpoint three months before launch and one week before launch. Because
only the parts not-yet-designed are postponed (rather than parts that are designed but have
errors), the later checkpoints reveal a situation in which more parts are prototyped and so fewer
are postponed. When the postponement decision is made three months before launch,
performance (as measured here, quality times the fraction of the model year launched), does not
erode as sharply as when the checkpoint is six months before launch. Quality, however, suffers
more, though it doesn't decline as much as when no parts are postponed. When the checkpoint is
Laura Black 37
one week before launch, the simulation is identical to the one in which no postponement policy
exists.
I conclude that, even though the simulated experiments overestimate the benefits of a
postponement policy, the outcome is not favorable. Postponing a portion of the model year does
not help the engineers "catch up" after a temporary increase in workload. Furthermore, the
engineers never launch the number of parts after the shock as before the shock. Even though the
policy maintains high quality in the parts launched, postponing incomplete work does not allow
the product development system to recover fully after the temporary imbalance between
resources and work.
Policy: Fixing a Fraction of the Errors
Since the model does not distinguish among types of defects in parts under development, it may
be appropriate to simulate a policy that allocates engineers to correct only the "important" errors
rather than all the errors identified through testing. To simulate this policy, I generously assume
that the important errors are instantly recognizable and clearly communicated to all. If the
policy does not yield improved simulations under these favorable assumptions, then one can
conclude that it would not help in reality, since it is not always easy to distinguish more
significant defects from the less significant ones and since communicating across projects and
functions is often challenging. If the policy works, then we can expect to see in the model a
more severe drop in quality during the launch of the high-content model year and the year
following than observed in Figure 3 above (since a majority of the errors remain uncorrected)
but a return to high quality thereafter.
Figure 15 shows the result of this policy simulation. We see the same tilting phenomenon as in
Figure 3, though the lower equilibrium of quality is higher (89 percent rather than 86 percent as
observed in Figure 3) and on the rise, though it is nowhere near its original level of 99.9 percent
even 10 years after the single outsized model year is introduced to the market. Also, while in the
Laura Black 38
original "Textbook" Allocation scenario quality declines to 86 percents and remains at that level,
the policy of fixing only 20 percent of the errors makes the initial decline in quality dip to about
81 percent.
Figure 15: Fixing 20 Percent of the Problems Identified--
Quality, With a Temporary Increase in Workload in Y ear 3,
"Textbook" Allocation with Resource-Constrained Testing
Even though in this scenario the desired number of engineers to allocate to problem-solving in
Y ear 0 is fewer than 50, far less than the 200 desired in the base scenario, 40-plus engineers still
comprise a near majority of the engineering staff, and less than one-eighth of the possible
engineering weeks are spent on early phase design. Thus, after the shock in workload, engineers
consistently prototype only between 10 and 15 percent of parts during the early phase. Since so
great a percentage of parts must be completed during the current phase when the error fraction is
Laura Black 39
higher, engineers find many problems to correct during the 12 months before launch, and few of
the next model year’s parts are prototyped during Y ear -1.
Policy: Canceling Incomplete Work
I next simulate a policy of canceling incomplete work. Similar to the postponement policy, the
canceling policy relies on a checkpoint each year, at which the number of parts in Y ear 0 not yet
prototyped are assessed. In this scenario, however, rather than moving the undesigned parts to
the early phase of the following model year, the policy simply eliminates them. Figure 16 shows
the series of simulations resulting from a checkpoint each year 6 months before launch. Again, I
use performance, rather than quality, as a proxy for the health of the product development
system.
Figure 16: When Undesigned Parts are Canceled 6 Months Before Launch,
Laura Black 40
Performance, With a Temporary Increase in Workload in Y ear 3,
"Textbook" Allocation with Resource-Constrained Testing
For the largest shock in workload, the year that the high-content model year launches, nearly 300
parts are canceled, and performance drops accordingly, to below 80 percent. Although the
system begins to recover immediately, for increases in workload exceeding about 35 percent of
the usual number of parts, engineers are never again able to perform as much work during the
early phase as they were before the temporary increase in work. For the larger pulses in
workload, nearly 30 parts are canceled consistently each year because they have not yet been
designed by the time the checkpoint occurs, six months before launch. Even though the
temporary imbalance between workload and resources tilts the product development system into
a lower-performance regime, the stable equilibrium is considerably higher than in other
scenarios (95 percent, rather than below 90 percent).
Again, when we look only at the quality of the work launched (ignoring the percentage
completed of the intended model year), we see that quality deteriorates only slightly.
Laura Black 41
0.85 4
. 0.0
Size of Shock
Figure 17: When Undesigned Parts are Canceled 6 Months Before Launch,
Quality, With a Temporary Increase in Workload in Y ear 3,
"Textbook" Allocation with Resource-Constrained Testing
Hypothesizing that an earlier checkpoint might allow the product development system to recover
completely from a temporary imbalance between workload and resources, I move the checkpoint
to 12 months before launch. If, when work from Y ear -1 is indexed to Y ear 0, there are parts
that were not designed during the early phase, those parts are removed from the model year
scheduled to launch in 12 months. Figures 18 and 19 show the results for performance (quality
times the percent of intended model year launched) and quality (the percent of model year parts
completed correctly by launch).
Laura Black 42
Performance
Figure 18: When Undesigned Parts are Canceled 12 Months Before Launch,
Performance, With a Temporary Increase in Workload in Y ear 3,
"Textbook" Allocation with Resource-Constrained Testing
Figure 18 depicts a significant dip in performance for even small temporary increases in
workload. As Figure 19 shows, the decline in performance does not result from low quality
(uncorrected defects), since quality remains at 99.9 percent, but rather from a reduction in the
model year scope. But after the imbalance, the recovery is immediate and enduring.
Laura Black 43
Quality
Figure 19: When Undesigned Parts are Canceled 12 Months Before Launch,
Quality, With a Temporary Increase in Workload in Y ear 3,
"Textbook" Allocation with Resource-Constrained Testing
I then run simulations for earlier and later checkpoints to identify how checkpoint timing affects
quality. Figure 20, rather than depicting simulations over time, shows only the steady-state
equilibria for a variety of checkpoint times when the temporary shock is varied. Any checkpoint
ensures an equilibrium value of quality as good as or better than that of the base scenario.
Clearly, however, the timing of the checkpoint and decision-making makes a significant
difference in the long-term outcome: The earlier checkpoints assure long-term performance
better than later checkpoints, but a checkpoint can be too early. In this model, if the decision-
making checkpoint occurs more than about 45 weeks before launch, quality begins to decline
below the observed maximum of 99.9 percent.
Laura Black 44
0.95
Performance
0.90 0.3
0.5 Size of Shock
0.8
0.85
1 11
6 11 16 21 26 31 36 41 46 51
Weeks Before Launch
Figure 20: Steady-State Equilibria for Performance,
When the Checkpoint Timing is Varied
The checkpoint for making the decision to cancel part of a new product launch serves as a
thorough reassessment of work-in-process and resources available to complete it. Although in
the model I canceled work to restore balance, it would be just as possible to add resources. In
practice, however, obtaining additional resources can pose more problems than simply canceling
projects or scaling down scope of work underway. Hiring, either temporarily or permanently,
skilled resources who can contribute significantly in a short time to work already underway
proves a challenging task even in abundant labor markets. Furthermore, although reneging on
certain features or models that marketing and others depend on may have unpleasant
consequences, those consequences are likely not as long-lasting as those resulting from decisions
to deal with surplus employees. The checkpoint invites dynamic allocation of resource and work
to maintain or restore balance to the product development system. The policy of canceling work
that falls behind schedule well in advance of its launch date seems the only robust mechanism
Laura Black 45
for ensuring consistently high quality and recovering productive capability after a temporary
imbalance between work and resources.
Discussion
From this series of simulation exercises, I conclude that, in an environment of overlapping
multiple projects, the same number of resources can produce the same number of new products
with a wide range of quality, depending on whether the workload and resources have been
consistently balanced in the past. I emphasize that the variance in quality depends not on
subtleties of the process methodology nor on whether engineers "care" or "try hard" in their
work. It depends only on the assumption that design completed earlier in the product
development process has a lower probability of error and that projects nearer to launch take
precedence over projects whose market introduction is later.
The model constructed for this exploration makes critical simplifying assumptions: parts are
assumed to be independent; defects are assumed to be corrected by revising only one part;
engineers are easily transferred among the activities of design, testing, and problem-solving for
all parts; and there is no cost in reallocating people from one activity or model year to another.
While these assumptions are patently unrealistic, they err on the side of generosity. Unfavorable
results observed in this model's simulations would simply be strengthened by incorporating
dynamics resulting from interdependence among parts, uneven utilization of a specialized
workforce, and costs in shifting people from one project to another.
In Revolutionizing New Product Development (1992), Wheelwright and Clark clearly state that
many companies participating in their research unwittingly overload the product development
system by undertaking too many projects. In one case, they estimated that the work exceeded
the resources available by as much as 200 to 300 percent. While "stretch goals" have validity in
some circumstances, few managers would choose systematically to undermine the capability of
Laura Black 46
their product development organizations by inundating them with a workload that ensured low
quality output.
Two points are noteworthy here: First, the turning point at which a reasonable workload
becomes "overload" is not obvious to either managers or engineers at the time. Even if some
suspect imbalance between work and resources, they cannot unequivocally demonstrate it at the
time, because the worst deterioration in quality manifests only some time after the imbalance
occurs. Second, an unusual amount of rework in the "right" number of projects can also
overload the product development system. Anything that increases the likelihood of error during
development--such as introducing a new technology, moving to a new facility, or even
reorganizing departments--can effectively "shock" the product development system, although
workload ostensibly remains constant. This is why iterations of testing and rework can play a
particularly insidious role, especially if the organization plans its work as if development were a
linear, sequential process. Although Wheelwright and Clark speak of the dangers (and
likelihood) of overloading the development system with too many projects underway, they do
not explicitly connect "additional late cycles" of product development to overloading the system.
This paper points out: Testing and problem-solving can overload the development system as
much as too many projects can.
Dynamically balancing work to resources can maintain the viability of long-term productive
capacity. Perhaps many managers believe that they already do this; managers at the field site
studied might argue that they frequently reallocate engineers to projects needing extra help in
order to meet their scheduled launch. But balancing work to resources includes two critical
components: first, it must assess the total amount of work-in-process; second, it must balance
work to resources by reducing work to accommodate the resources available.
The total work-in-process must account for all projects under development (not just the one
nearest launch) and account for the actual state of those projects in terms of percent of testing
completed and percent of identified problems resolved. Managers cannot balance what they are
unaware of--if testing is not complete at the component, subsystem, and system levels, then
Laura Black 47
managers cannot know the workload that will emerge as problems are identified. Decision-
makers basing workload estimates only on parts per model year or on the number of projects
underway, without considering parts to be reworked, are more likely to overload the product
development system. Therefore, as testing progresses, it makes sense to update dynamically the
quantity of work-in-process based on the problems identified and as yet unresolved.
In the model, the only way unequivocally to restore balance is to eliminate identified problems
or eliminate work-to-do. This explains the counterintuitive result that no testing improves long-
term quality. In reality, eliminating identified problems by refusing to test during development
poses a poor strategy for improving long-term quality. On the other hand, canceling incomplete
work in a time-frame well in advance of launch can restore balance to the product development
system while ensuring short-term and long-term quality. Canceling projects may seem an
extreme move. Smith and Reinertsen (1998), however, relate an anecdote in which a company
reduced its product development project list from nearly 50 projects to half a dozen. Managers
have not missed the aborted projects, the authors assert, because "better opportunities have arisen
since, and they were in a position to exploit them." Additionally, when testing does identify
problems in development work that is near market introduction, carefully choosing which
problems to solve while looking at entire portfolio of work underway can ensure that resources
are available to do the critical early work on subsequent projects and guarantee continued high
quality.
Conclusion
The model presented here offers a structural reason why project problems may consistently
surface late in the product development cycle. In a company that undertakes multiple projects
and allocates engineering resources among work in various phases of development, biases for
solving the biggest problems for the nearest deadlines can effectively undermine early phase
development efforts. If testing is a low-priority activity among engineers, or if a low percentage
of parts are designed when prototype builds take place, then rework from late-surfacing projects
Laura Black 48
may claim an increasing percentage of the engineering staff. The work produced under such
conditions is often of a lower quality than that possible, and the employees producing it can
become physically and emotionally fatigued from "fire-fighting." A permanent imbalance
between workload and staff is not required to establish a persistent low-quality regime of output.
A one-time temporary shock to the system can create permanently undesirable effects. With the
model, I simulated a variety of policies in an effort to identify measures practitioners can take to
alleviate pressures that lead to tilting into fire-fighting mode. The only policy that renders the
product development organization robust to imbalances between workload and resources is that
of canceling incomplete work well before its scheduled launch date. This results in a temporary
reduction in the market introduction's size or scope but ensures consistently high quality in the
product and a full return to high productive capability in the organization.
Laura Black 49
Bibliography
weeeeecee (1998). "Launch Assessment: 1999 Model Y ear." Company report (name withheld in
accordance with researchers' confidentiality agreement).
--- (1999). "How the Rubber Met the Road: Product Development Process Assessment,
Model Y ear 2000." Company report (name withheld in accordance with researchers’
confidentiality agreement).
Forrester, J.W. (1961). Industrial Dynamics. Portland, Oregon: Productivity Press.
Griffin, A. (1997). "PDMA Research on New Product Development Practices: Updating
Trends and Benchmarking Best Practices," J ournal for Product Innovation Management,
No. 14, pp. 429 - 458.
Krishnan, V., $.D. Eppinger, D.E. Whitney (1995). "A Model-Based Framework to Overlap
Product Development A ctivities," working paper #3635, MIT.
Meyer, M.H., P. Tertzakian, and J.M. Utterback (1997). "Metrics for Managing Research and
Development in the Context of the Product Family," Management Science, Vol. 43, No.
1, pp. 88 - 111.
Repenning, N. (1999). "The Transition Problem in Product Development, " working paper.
Smith, P.G. and D.G. Reinertsen (1998). Developing Products in Half the Time. New Y ork:
John Wiley & Sons, Inc.
Sterman, J.D. (1989). "Modeling Managerial Behavior: Misperceptions of Feedback in a
Dynamic Decision Making Experiment," Management Science, Vol. 35, No. 3, pp. 321-
339.
Sterman, J.D., N.P. Repenning, and F. Kofman (1997). "Unanticipated Side Effects of
Successful Quality Programs: Exploring a Paradox of Organizational Improvement,"
Management Science. Vol. 43, No. 4, pp. 503-521.
Ulrich, K.T. and S.D. Eppinger (1995). Product Design and Development.. New Y ork:
McGraw-Hill, Inc.
Wheelwright, S.C. and K.B. Clark (1992). Revolutionizing Product Development: Quantum
Leaps in Speed, Efficiency, and Quality. New York: The Free Press.
Laura Black
50
‘Laura Black
Year 0 Parts and Problems
pulse in Year 0 problems per part
ear vork
postponed
te design part
_
a
fraction year 0 problems hed
ch pares t desion
Inal year 0
arts t
Sesion
ini tine to
adaress problem
51
ting more fooro sot
op retene r ‘weblere
Year
testing oD
aay ca i
kis problems for
oro .
‘robles es
romped ars | ascot ones erties _ Ls 5
creating problems in Serie monies. creatilg Ga
promype rare for Y are H peosere in scoring
‘ear 4 er bier nar
4 7 4 10a probleme pr pat Fai Orewsed pars
trib prbiens Toryeard
er prototyped nib problems
Part foryeur 0 verrevaed
sort aro
reste a
mh pence ‘
P| ye0r 0 pars uses orevsed
‘creating year O testing’ ‘in build or test | yest ony
proeype pats |prichyedpars | pra revising pits
riniurn te
tw revise part
ta probes
or moda yar
changing out
‘eral Pek
52
‘Laura Black
Year -1 Parts and Problems
Laura Black 53
Launch Countdown
<TIME STE
launch
weeks ina year
ay
~
; build 2 switch
te before build 1 switch
launch ge
PA f ~~
SUME> weeks between build
build 1 and duration weeks between
launch midpoint build 2 and
launch
time before
build 1 time before
build 2
using prototyped
parts in build
7 musing revised
> parts in build
f
build 2 switch>
Laura Black 54
Allocating Engineers to Activities
Laura Black
Desired Allocation to Testing
TESTING DURING YEAR 0
desired engineers
allocated to testing year 0
revised parts
desired engineers
allocated to year 0 ‘i
pa desired year
desired engineers
allocated to testing year
0 prototyped parts
minimum
Otesting rate wg time to test>
testing
productiviy> normal time
to test
todd year 0 ~~
parts to be desired time to
tested test for year 0
‘on desired time to test for
year 0 reference time for
wt ____ eesired test time
v
effect of te before launch
. function for effect of
sfimnecbefor time before launch on,
desired time to test
total desired engineers to testing
55
TESTING DURING YEAR -1
parts
desired engineers
allocated to testing
year-1 prototyped
desired engineers
allocated to testing year
1 revised parts
desired engineers
allocated to year
“Ltesting
desired year ag — cnn
-L testing rate eee
desired time to
testforyear-1
TESTING AS A DELAY
TesthsDelay switch
Laura Black
Desired Allocation to Problem-Solving
PROBLEMSOLVING DURING YEAR 0
problemsolving
desired engineers productivity
allocated to year
0 problem-solving
; ao yea
<fraction year desired
0 problems to ————,~ problemsolving rate
ss> for year 0
- ™*
0 1Dd probler
normal desired pe
time to address desired time for year 0
problems problem-solving
hl
effect of time before 5
launch on desired time ~@———— reference time
to address problems for desired
problemsolving
function for effect of time
before launch on desired
time to address problems
problem>
56
PROBLEMSOLVING DURING YEAR -1
<problemsolv
desired engineers produ
allocated to year -1
problem-solving
4
desired
problemsolving <—
rate for year “1
a
minimum time
desired time to
address problems
for year -1
Laura Black
Desired Allocation to Design
DESIGNING DURING YEAR 0
DESIGNING DURING YEAR -1
productivity>
desired engineers
allocated to year -1
design
desired engineers
aninimanctens allocated to year 0
re design
4 ‘
desired design
sain digs
pero onium popes
x esignpor> wg
weiciinan a.
design pts or corn dled ine /
_- mace
sh sce
build 1 on desired
ime to design parts
reference time for
desired design time
function for effect of
time before build 1 on
desired design time
desired time to
design parts for
year-1
aa time to design
Laura Black 58
Quality and Performance
—————™ estimated
quality
"sa
© actual quality bar
problems
because of parts
not designed quality at
launch
changing in changing out
quality at quality at
launch launch
performance
changing in changing out
performance performance
Policy Switches
fraction year
0 problems to
address
FixPercentof CancelWork CancelWorkin PostponeWorkin
Problems switch in Year 0 Year -1 switch Year0 switch
switch
vious model year>
fraction work canceled
percentage model year launched
‘Laura Black 59
Reoordkeeping of Engineering-Hours
annual engineers
time engineer a at TIME STEP>
5 ar allocated dounch> <TIME STEP> located to all work aire mi ME STE
nainees
i rat —
engineers j
accumulating Jallocated to year | ro
engineers for O design 1
year 0 design annual a
engheers accumulating
Se allocated to engineers for
naineer le year 1 work year-1 design
ao 0 enainee ccouete sre
problem-solving> 7 aii annual allo
engineers parr roi
as FP aocated to year annual engineers
accurtating Joproblersoking allocated to year 2
engineers for soca yee —K—
accumulating engineers for
problemeolving year 0 work pirate vert
seas problemsohng
riME STEP> idling
[annual engineers func
located to year
; testing reviced i
resetting TIME STEP>
accumulating: pane annual
engineers for Laceonees_. |_\
year 0 testing ‘teal a ean
nvend engineers ints reset
aieated t engineers
time year 0 testing eye esana
taboo Jannual engineers
a allocated to year
, pe otestng — ———
accumulating Prototyped parts founch> <riME STEF
agrees eryeor No
fanrual engineers
ae, locat Dar -:
‘prototyped allocated year -1
accumulating [Pwtoiyped parts | _ resetting
engineers for enginges for
ord west year-1 esting
" ‘prototyped
prototyped
Laura Black 60
(001)
(002)
(003)
(004)
(005)
(006)
(007)
(008)
(009)
(010)
(011)
(012)
“accumulating engineers for year -1 design"=
"engineers allocated to year -1 design"/time engineer allocated
Units: (people*W eek)/Week
"accumulating engineers for year -1 problemsolving"=
“engineers allocated to year -1 problem-solvin
Units: (people*W eek)/W eek
‘time engineer allocated
"accumulating engineers for year -1 testing prototyped"=
"engineers allocated to testing year -1 prototyped parts"/time engineer allocated
Units: (people*W eek)/Week
"accumulating engineers for year -1 testing revised"=
"engineers allocated to testing year -1 revised parts"/time engineer allocated
Units: (people*W eek)/W eek
accumulating engineers for year 0 design=
engineers allocated to year 0 design/time engineer allocated
Units: (people*W eek)/Week
accumulating engineers for year 0 problemsolving=
"engineers allocated to year 0 problem-solving"/time engineer allocated
Units: (people*W eek)/W eek
accumulating engineers for year 0 testing prototyped=
engineers allocated to year 0 testing prototyped parts/time engineer allocated
Units: (people*W eek)/Week
accumulating engineers for year 0 testing revised=
engineers allocated to year 0 testing revised parts/time engineer allocated
Units: (people*W eek)/W eek
"accumulating year -1 solved problems"=
"addressing problems in year -1 prototyped parts"-"creating unIDd problems in year -1
revised parts"
Units: problems/W eek
accumulating year 0 solved problems=
addressing problems for year 0-creating problems in revised parts for year 0
Units: problems/W eek
actual quality=
1-(ZIDZ(year 0 IDd problems +tyear 0 unlDd problems in prototyped parts+year 0 unIDd
problems in revised parts+problems because of parts not designed
syear 0 parts used in build or test+year 0 prototyped parts-+year 0 revised parts
+year 0 new parts to design))*parts per problem
Units: dimensionless
addressing problems for year 0=
IF THEN ELSE (launch=1,0,fraction year 0 problems fixed*MIN (year 0 IDd problems
/minimum time to address problem,"engineers allocated to year 0 problem-solving"
*problemsolving productivity))
Laura Black 61
(013)
(014)
(015)
(016)
(017)
(018)
(019)
(020)
(021)
(022)
(023)
(024)
Units: problems/W eek
"addressing problems in year -1 prototyped parts"=
IF THEN ELSE (launch=1,0,MIN(“engineers allocated to year -1 problem-solving"
*problemsolving productivity,"year -1 IDd problems"/minimum time to address problem))
Units: problems/W eek
ALLOCATION PLAN A Switch=0
Units: dimensionless
ALLOCATION PLAN B Switch=0
Units: dimensionless
ALLOCATION PLAN C Switch=1
Units: dimensionless
annual engineers allocated to all work=
"annual engineers allocated to year -1 work"+annual engineers allocated to year 0 work
Units: Week*people
“annual engineers allocated to year -1 design"=INTEG (
"accumulating engineers for year -1 design"-"resetting engineers for year -1 design",0)
Units: Week*people
“annual engineers allocated to year -1 problemsolving"=INTEG (
"accumulating engineers for year -1 problemsolving"-"resetting engineers for year -1
problemsolving",0)
Units: Week*people
“annual engineers allocated to year -1 testing"=
"annual engineers allocated to year -1 testing revised parts"+"annual engineers allocated
year -1 testing prototyped parts"
Units: Week*people
“annual engineers allocated to year -1 testing revised parts"= INTEG (
"accumulating engineers for year -1 testing revised"-"resetting engineers for year -1
testing revised",0)
Units: Week*people
“annual engineers allocated to year -1 work"=
"annual engineers allocated to year -1 design"+"annual engineers allocated to year -1
problemsolving"+'"annual engineers allocated to year -1 testing"
Units: Week*people
annual engineers allocated to year 0 design=INTEG (
accumulating engineers for year 0 design-resetting engineers for year 0 design,0)
Units: people*Week
annual engineers allocated to year 0 problemsolving=INTEG (
accumulating engineers for year 0 problemsolving-resetting engieners for year 0
problemsolving,0)
Units: people*Week
Laura Black 62
(025)
(026)
(027)
(028)
(029)
(030)
(031)
(032)
(033)
(034)
(035)
(036)
annual engineers allocated to year 0 testing=
annual engineers allocated to year 0 testing prototyped parts +annual engineers allocated
to year 0 testing revised parts
Units: Week*people
annual engineers allocated to year 0 testing prototyped parts=INTEG (
accumulating engineers for year 0 testing prototyped-resetting engineers for year 0
testing prototyped,0)
Units: people*Week
annual engineers allocated to year 0 testing revised parts=|INTEG (
accumulating engineers for year 0 testing revised-resetting engineers for year 0 testing
revised,0)
Units: people*W eek
annual engineers allocated to year 0 work=
annual engineers allocated to year 0 design+annual engineers allocated to year 0
problemsolving+annual engineers allocated to year 0 testing
Units: Week*people
“annual engineers allocated year -1 testing prototyped parts"= INTEG (
"accumulating engineers for year -1 testing prototyped"-"resetting engineers for year -1
testing prototyped",0)
Units: Week*people
base value of new parts=700
Units: parts
base value of total engineers=85
Units: people
build 1 switch=
IF THEN ELSE (time before launch>weeks between build 1 and launch-build duration
midpoint :AND: time before launch < weeks between build 1 and launch+build duration
midpoint, 1,0)*0
Units: dimensionless
build 2 switch=
IF THEN ELSE (time before launch>weeks between build 2 and launch-build duration
midpoint:AND: time before launch<weeks between build 2 and launch+build duration
midpoint, 1,0)*0
Units: dimensionless
build duration midpoint=2.5
Units: Week
build1 pressure switch=1
Units: dimensionless
canceling or postponing year 0 work=
IF THEN ELSE (time before launch=TimeToCancelOrP ostpone,(CancelWork in Year 0
switch+P ostponeWorkinY ear0 switch)*year 0 new parts to design/TIME STEP,0)
Units: parts/Week
Laura Black 63
(037)
(038)
(039)
(040)
(041)
(042)
(043)
(044)
(045)
(046)
(047)
(048)
(049)
year
"canceling year -1 work"=
IF THEN ELSE (launch=1,"CancelW orkinY ear -1 switch"*"year -1 new parts to design"
/TIME STEP,O)
Units: part/Week
CancelWork in Year 0 switch=0
Units: dimensionless
“CancelWorkinY ear -1 switch"=0
Units: dimensionless
"changing in fraction parts prototyped in year -1"=
IF THEN ELSE (launch=1,("year -1 parts prototyped plus"/new parts for next model year
recorded)/TIME STEP,0)
Units: dimensionless/W eek
changing in IDd problems for year 0=
IF THEN ELSE (launch=1,"changing out IDd problems for year -1",0)
Units: problems/W eek
"changing in last year's fraction prototyped plus in year -1"=
IF THEN ELSE (launch=1, “fraction parts prototyped plus in year -1"/TIME STEP,0)
Units: dimensionless/W eek
"changing in last year's fraction tested in year -1"=
IF THEN ELSE (launch=1,"fraction parts tested in year -1'"/TIME STEP,0)
Units: dimensionless/W eek
changing in new parts=
IF THEN ELSE (launch=1,new parts for next model year/TIME STEP,0)
Units: part/Week
changing in new parts for previous model year=
changing out new parts
Units: parts/Week
"changing in new parts for year -1"=
IF THEN ELSE (launch=1,new parts for next model year/TIME STEP,0)
Units: parts/Week
changing in new parts for year 0=
IF THEN ELSE (launch=1,"changing out new parts for year -1",0)
Units: parts/Week
"changing in parts tested in year -1"=
IF THEN ELSE (launch=1,"year -1 tested parts"/new parts for next model year recorded
/TIME STEP,0)
Units: dimensionless/W eek
changing in performance=
IF THEN ELSE (time before launch=TIME STEP quality at launch*percentage model
launched/TIME STEP,0)
Laura Black 64
(050)
(051)
(052)
(053)
(054)
(055)
(056)
(057)
(058)
(059)
(060)
(061)
Units: dimensionless/W eek
changing in prototyped parts for year 0=
IF THEN ELSE (launch=1,"changing out parts prototyped for year -1",0)
Units: parts/Week
changing in quality at launch=
IF THEN ELSE (time before launch=TIME STEP +TIME STEP,actual quality/TIME
STEP,0)
Units: dimensionless/W eek
changing in revised parts for year 0=
IF THEN ELSE (launch=1,"changing out rp for year -1",0)
Units: parts/Week
changing in tested parts for year O=
IF THEN ELSE (launch=1,"changing out tp for year -1",0)
Units: parts/Week
changing in total probs=
IF THEN ELSE (launch=1, (total year 0 unsolved problems+year 0 cumulative solved
problems)/TIME STEP,0)
Units: problems/W eek
changing in unIDd problems in prototyped parts for year 0=
IF THEN ELSE (launch=1,"changing out unIDd problems in pp for year -1",0)
Units: problems/W eek
changing in unIDd problems in revised parts for year 0O=
IF THEN ELSE (launch=1,"changing out unIDd problems in rp for year -1",0)
Units: problems/W eek
changing in year 0 cumulative solved problems=
IF THEN ELSE (launch=1,"changing out cumulative solved problems for year -1",0)
Units: problems/W eek
"changing out cumulative solved problems for year -1"=
IF THEN ELSE (launch=1,"year -1 cumulative solved problems'/TIME STEP,0)
Units: problems/W eek
"changing out fraction parts prototyped in year -1"=
IF THEN ELSE (launch=1,("fraction parts prototyped plus in year -1"/TIME STEP),0)
Units: dimensionless/W eek
"changing out IDd problems for year -1"=
IF THEN ELSE (launch=1,"year -1 IDd problems'/TIME STEP,0)
Units: problems/W eek
changing out IDd problems for year 0=
IF THEN ELSE (Switch to postpone rather than cancel unfinished work=1,0,IF THEN
ELSE (launch=1,year 0 IDd problems/TIME STEP,0))
Units: problems/W eek
Laura Black 65
(062)
(063)
(064)
(065)
(066)
(067)
(068)
(069)
(070)
(071)
(072)
(073)
"changing out last year's fraction protototyped plus in year -1"=
IF THEN ELSE (launch=1,"last year's fraction parts prototyped plus in year -1"
/TIME STEP,O)
Units: dimensionless/W eek
"changing out last year's fraction tested in year -1"=
IF THEN ELSE (launch=1,"last year's fraction parts tested in year -1"/TIME STEP,0)
Units: dimensionless/W eek
changing out new parts=
IF THEN ELSE (launch=1,new parts for next model year recorded/TIME STEP,0)
Units: part/Week
changing out new parts for previous model year=
IF THEN ELSE (launch=1,new parts for previous model year/TIME STEP,0)
Units: parts/Week
"changing out new parts for year -
IF THEN ELSE (launch=1,"year -1 new parts to design"/TIME STEP,0)*(1-
"CancelWorkinY ear -1 switch")
Units: parts/Week
changing out new parts for year 0=
IF THEN ELSE (Switch to postpone rather than cancel unfinished work=1,0,IF THEN
ELSE (launch=1,year 0 new parts to design/TIME STEP,0))
Units: parts/Week
"changing out parts prototyped for year -1"=
IF THEN ELSE (launch=1,"year -1 prototyped parts"/TIME STEP,0)
Units: parts/Week
"changing out parts tested in year -1"=
IF THEN ELSE (launch=1,"fraction parts tested in year -1'"/TIME STEP,0)
Units: dimensionless/W eek
changing out performance=
IF THEN ELSE (time before launch=TIME STEP, performance/TIME STEP,0)
Units: dimensionless/W eek
changing out prototyped for year 0=
IF THEN ELSE (Switch to postpone rather than cancel unfinished work=1,0,IF THEN
ELSE (launch=1,year 0 prototyped parts/TIME STEP,0))
Units: parts/Week
changing out quality at launch=
IF THEN ELSE (time before launch=TIME STEP +TIME STEP, quality at launch/TIME
STEP,0)
Units: dimensionless/W eek
changing out revised parts for year 0O=
IF THEN ELSE (Switch to postpone rather than cancel unfinished work=1,0,IF THEN
ELSE (launch=1,year 0 revised parts/TIME STEP,0))
Units: parts/Week
Laura Black 66
(074)
(075)
ELSE
"changing out rp for year -1"=
IF THEN ELSE (launch=1,"year -1 revised parts'/TIME STEP,0)
Units: parts/Week
changing out tested parts for year 0=
IF THEN ELSE (Switch to postpone rather than cancel unfinished work=1,IF THEN
(launch=1,(year 0 parts used in build or test-year 0 IDd problems*parts per problem)
/TIME STEP,0O),IF THEN ELSE (launch=1,year 0 parts used in build or test/TIME
STEP,0))
(076)
(077)
(078)
(079)
(080)
(081)
(082)
(083)
(084)
(085)
Units: parts/Week
changing out total probs=
IF THEN ELSE (launch=1,total problems for model year launched/TIME STEP ,,0)
Units: problems/W eek
"changing out tp for year -1"=
IF THEN ELSE (launch=1,"year -1 tested parts"/TIME STEP,0)
Units: parts/Week
changing out unID problems in revised parts for year 0=
IF THEN ELSE (Switch to postpone rather than cancel unfinished work=1,0,IF THEN
ELSE (launch=1,year 0 unIDd problems in revised parts/TIME STEP,0))
Units: problems/W eek
"changing out unIDd problems in pp for year -1"=
IF THEN ELSE (launch=1,"unIDd problems in year -1 prototyped parts'"/TIME STEP
,0)*(1-"C ancelW orkinY ear -1 switch")
Units: problems/W eek
changing out unIDd problems in prototyped parts for year O=
IF THEN ELSE (Switch to postpone rather than cancel unfinished work=1,0,IF THEN
ELSE (launch=1,year 0 unIDd problems in prototyped parts/TIME STEP,0))
Units: problems/W eek
"changing out unIDd problems in rp for year -1"=
IF THEN ELSE (launch=1,"unlDd problems in year -1 revised parts'/TIME STEP,0)
Units: problems/W eek
"changing out year -1 canceled work"=
IF THEN ELSE (launch=1,"year -1 work canceled'"/TIME STEP,0)
Units: part/Week
changing out year 0 cumulative solved problems=
IF THEN ELSE (launch=1,year 0 cumulative solved problems/TIME STEP,0)
Units: problems/W eek
creating problems in prototype parts for year 0=
creating prototype parts for year 0*year 0 problems per part prototyped
Units: problems/W eek
creating problems in revised parts for year 0O=
Laura Black
revising parts for year O*year 0 problems per part prototyped
Units: problems/W eek
67
Laura Black 68
(086)
(087)
(088)
(089)
(090)
(091)
to
(092)
(093)
(094)
(095)
(096)
(097)
creating prototype parts for year 0=
IF THEN ELSE (launch=1 :OR: time before launch=TimeToCancelOrP ostpone,0,MIN
(engineers allocated to year 0 design*design productivity, year 0 new parts to design
/minimum time to design part))
Units: parts/Week
"creating unIDd problems in year -1 prototyped parts"=
"prototyping year -1 parts"*"year -1 problems per part prototyped"
Units: problems/W eek
"creating unIDd problems in year -1 revised parts"=
"revising year -1 parts"*"year -1 problems per part prototyped"
Units: problems/W eek
design productivity=0.2
Units: part/(Week*person)
"desired design rate for year -1"=
MIN("year -1 new parts to design"/"desired time to design parts for year -1",
“year -1 new parts to design"/minimum time to design part)
Units: parts/Week
desired design rate for year 0=
MIN (year 0 new parts to design/desired time to design parts for year 0,year 0 new parts
design/minimum time to design part)
Units: part/Week
"desired engineers allocated to testing year -1 prototyped parts"=
"desired engineers allocated to year -1 testing"*ZIDZ("year -1 prototyped parts",
"total year -1 parts to be tested")
Units: people
"desired engineers allocated to testing year -1 revised parts"=
"desired engineers allocated to year -1 testing"*ZIDZ("year -1 revised parts",
"total year -1 parts to be tested")
Units: people
desired engineers allocated to testing year 0 prototyped parts=
desired engineers allocated to year 0 testing*(ZIDZ(year 0 prototyped parts,
total year 0 parts to be tested))
Units: people
desired engineers allocated to testing year 0 revised parts=
desired engineers allocated to year 0 testing*(ZIDZ(year 0 revised parts,
total year 0 parts to be tested))
Units: people
"desired engineers allocated to year -1 design"=
"desired design rate for year -1"/design productivity
Units: people
"desired engineers allocated to year -1 problem-solving"=
"desired problemsolving rate for year -1"/problemsolving productivity
Laura Black 69
(098)
(099)
(100)
(101)
(102)
(103)
(104)
(105)
(106)
(107)
(108)
Units: people
"desired engineers allocated to year -1 testing"=
"desired year -1 testing rate"/testing productivity
Units: people
desired engineers allocated to year 0 design=
desired design rate for year 0/design productivity
Units: people
"desired engineers allocated to year 0 problem-solving"=
desired problemsolving rate for year 0/problemsolving productivity
Units: people
desired engineers allocated to year 0 testing=
desired year 0 testing rate/testing productivity
Units: people
"desired problemsolving rate for year -1"=
MIN(“year -1 IDd problems"/"desired time to address problems for year -1",
"year -1 IDd problems"/minimum time to address problem)
Units: problems/W eek
desired problemsolving rate for year 0=
MIN(fraction year 0 problems to address*year 0 IDd problems/"desired time for year 0
problem-solving",fraction year 0 problems to address*year 0 IDd problems/minimum time
to address problem)
Units: problems/W eek
"desired time for year 0 problem-solving"=
normal desired time to address problems*effect of time before launch on desired time to
address problems
Units: weeks
"desired time to address problems for year -1"=
normal desired time to address problems
Units: weeks
"desired time to design parts for year -1"=
normal desired time to design parts
Units: weeks
desired time to design parts for year 0=
IF THEN ELSE (build1 pressure switch=1,normal desired time to design parts
*effect of time before build 1 on desired time to design parts,normal desired time to
design parts)
Units: weeks
"desired time to test for year -1"=
normal time to test
Units: weeks
Laura Black
(109)
(110)
to
(111)
(112)
(113)
(114)
(115)
(116)
(117)
(118)
(119)
70
desired time to test for year 0=
normal time to test*effect of time before launch on desired time to test for year 0
Units: weeks
"desired year -1 testing rate"=
MIN("total year -1 parts to be tested'/"desired time to test for year -1","total year -1 parts
be tested"/minimum time to test)
Units: parts/Week
desired year 0 testing rate=
MIN(total year 0 parts to be tested/desired time to test for year 0,total year 0 parts to be
tested/minimum time to test)
Units: parts/Week
discovering problems in prototype parts for year 0=
testing prototyped parts for year O*unIDd problems per prototyped part for year 0
testing accuracy fraction
Units: problems/W eek
"discovering problems in year -1 prototyped parts"=
"testing year -1 prototyped parts"*"problems per prototyped part for year -1"
Units: problems/W eek
"discovering problems in year -1 revised parts"=
"testing year -1 revised parts"*"problems per revised part for year -1"
Units: problems/W eek
discovering problems in year 0 revised parts=
testing revised parts for year 0*unID problems per revised part for year 0
testing accuracy fraction
Units: problems/W eek
effect of time before build 1 on desired time to design parts=
function for effect of time before build 1 on desired design time(time before build 1
/reference time for desired design time)
Units: dimensionless
effect of time before launch on desired time to address problems=
function for effect of time before launch on desired time to address problems
(time before launch/reference time for desired problemsolving)
Units: dimensionless
effect of time before launch on desired time to test for year 0=
function for effect of time before launch on desired time to test(time before launch
/reference time for desired test time)
Units: dimensionless
"engineers allocated to testing year -1 prototyped parts"=
ALLOCATION PLAN C Switch*IF THEN ELSE (special allocation to testing>0,MIN
("desired engineers allocated to testing year -1 prototyped parts",special allocation to
testing*"desired engineers allocated to testing year -1 prototyped parts"/total desired
engineers to testing),MIN("desired engineers allocated to testing year -1 prototyped
parts",total engineers after special allocation-engineers allocated to year 0 design-
Laura Black 71
engineers allocated to year 0 testing prototyped parts-engineers allocated to year 0
testing revised parts-"engineers allocated to year 0 problem-solving"-"engineers
allocated to year -1 design"))
Units: people
(120) "engineers allocated to testing year -1 revised parts"=
ALLOCATION PLAN C Switch*(IF THEN ELSE (special allocation to testing>0,MIN
("desired engineers allocated to testing year -1 revised parts",special allocation to testing
*'desired engineers allocated to testing year -1 revised parts"/total desired engineers to
testing),MIN("desired engineers allocated to testing year -1 revised parts",total engineers
after special allocation-engineers allocated to year 0 design-engineers allocated to year 0
testing prototyped parts-engineers allocated to year 0 testing revised parts-
"engineers allocated to year 0 problem-solving"-"engineers allocated to year -1
design"-"engineers allocated to testing year -1 prototyped parts")))
Units: people
(121) "engineers allocated to year -1 design"=
ALLOCATION PLAN C Switch*IF THEN ELSE (special allocation to testing>0, MIN
("desired engineers allocated to year -1 design",total engineers after special allocation
-engineers allocated to year 0 design-"engineers allocated to year 0 problem-solving"),
MIN(“desired engineers allocated to year -1 design", total engineers after special
allocation-engineers allocated to year 0 design-engineers allocated to year 0
testing prototyped parts-engineers allocated to year 0 testing revised parts-"engineers
allocated to year 0 problem-solving")
Units: people
(122) "engineers allocated to year -1 problem-solving"=
ALLOCATION PLAN C Switch*IF THEN ELSE (special allocation to testing>0, MIN
("desired engineers allocated to year -1 problem-solving",total engineers after special
allocation-engineers allocated to year 0 design-"engineers allocated to year 0 problem-
solving"-"engineers allocated to year -1 design"), MIN("desired engineers allocated to
year -1 problem-solving",total engineers after special allocation-engineers allocated to
year 0 design-engineers allocated to year 0 testing prototyped parts-engineers allocated
to year 0 testing revised parts-"engineers allocated to year 0 problem-solving"-"engineers
allocated to year -1 design"-"engineers allocated to testing year -1 prototyped parts"-
"engineers allocated to testing year -1 revised parts")
Units: people
(123) “engineers allocated to year -1 testing total"=
"engineers allocated to testing year -1 prototyped parts"+"engineers allocated to testing
year -1 revised parts"
Units: people
(124) engineers allocated to year 0 design=
MIN(desired engineers allocated to year 0 design,total engineers after special allocation)
Units: people
(125) "engineers allocated to year 0 problem-solving"=
ALLOCATION PLAN C Switch*IF THEN ELSE (special allocation to testing>0,
MIN("desired engineers allocated to year 0 problem-solving", total engineers after special
allocation-engineers allocated to year 0 design), MIN("desired engineers
allocated to year 0 problem-solving", total engineers after special allocation-engineers
Laura Black
allocated to year 0
engineers allocated to year
Units: people
design-engineers allocated to year 0 testing prototyped parts-
0 testing revised parts))
72
Laura Black 73
(126)
(127)
(128)
(129)
(130)
(131)
(132)
(133)
(134)
(135)
(136)
engineers allocated to year 0 testing prototyped parts=
ALLOCATION PLAN C Switch*IF THEN ELSE (special allocation to testing>0,MIN
(desired engineers allocated to testing year 0 prototyped parts,special allocation to
testing*desired engineers allocated to testing year 0 prototyped parts/total desired
engineers to testing),MIN (desired engineers allocated to testing year 0 prototyped
parts, total engineers after special allocation-engineers allocated to year 0 design))
Units: people
engineers allocated to year 0 testing revised parts=
ALLOCATION PLAN C Switch*(IF THEN ELSE (special allocation to testing>0,MIN
(desired engineers allocated to testing year 0 revised parts,special allocation to testing
*desired engineers allocated to testing year 0 revised parts/total desired engineers to
testing), MIN(desired engineers allocated to testing year 0 revised parts,total engineers
after special allocation-engineers allocated to year 0 design-engineers allocated to year 0
testing prototyped parts)))
Units: people
engineers allocated to year 0 testing total=
engineers allocated to year 0 testing prototyped parts+engineers allocated to year 0
testing revised parts
Units: people
estimated quality=
1-(ZIDZ(year 0 IDd problems, year 0 parts used in build or test+year 0 prototyped parts
+year 0 revised parts))*parts per problem
Units: dimensionless
FINAL TIME =1040
Units: Week
FixP ercentOfP roblems switch=0
Units: dimensionless
"fraction parts prototyped plus in year -1"=INTEG (
"changing in fraction parts prototyped in year -1"-"changing out fraction parts prototyped
in year -1",0)
Units: dimensionless
“fraction parts tested in year -1"=INTEG (
"changing in parts tested in year -1"-"changing out parts tested in year -1",0)
Units: dimensionless
fraction work canceled=
ZIDZ(("year -1 work canceled"+year 0 work canceled or postponed),new parts for
previous model year)
Units: dimensionless
fraction year 0 problems fixed=
IF THEN ELSE (FixPercentOfP roblems switch=1,4,1)
Units: dimensionless
fraction year 0 problems to address=
IF THEN ELSE (FixPercentOfP roblems switch=1,0.2,1)
Laura Black 74
(137)
(138)
(139)
(140)
(141)
(142)
(143)
(144)
(145)
(146)
(147)
(148)
(149)
Units: dimensionless
function for effect of time before build 1 on desired design time
([(0,0)-(2,2)],(0,0.2),(0.25,0.25),(0.5,0.45),(0.75,0.7),(1,1),(1.25,1.25),
(1.5,1.4),(1.75,1.45),(2,1.5))
Units: dimensionless
function for effect of time before launch on desired time to address problems
([(0,0)-(2,2)],(0,0.3),(0.25,0.35),(0.5,0.5),(0.75,0.75),(1,1),(1.25,1.25),
(1.5,1.4),(1.75,1.45),(2,1.5))
Units: dimensionless
function for effect of time before launch on desired time to test(
[(0,0)-(2,2)],(0,0.4),(0.2,0.5),(0.4,0.7),(0.6,0.85),(0.8,0.95),(1,1),
(1.5,1),(2,1))
Units: dimensionless
IDd problems per part for year 0=
ZIDZ(year 0 IDd problems, year 0 parts used in build or test)
Units: problems/part
"IDing more problems for year -1"=
"discovering problems in year -1 revised parts"
Units: problems/W eek
IDing more problems for year 0=
discovering problems in year 0 revised parts
Units: problems/W eek
IDing problems for year 0=
discovering problems in prototype parts for year 0
Units: problems/W eek
"IDing problems in year -1 prototyped parts"=
"discovering problems in year -1 prototyped parts"
Units: problems/W eek
INITIAL TIME =-208
Units: Week
initial year 0 parts to design=0
Units: parts
initial year 0 prototyped parts=0
Units: parts
"last year's fraction parts prototyped plus in year -1"=INTEG (
"changing in last year's fraction prototyped plus in year -1"-"changing out last year's
fraction protototyped plus in year -1",0)
Units: dimensionless
"last year's fraction parts tested in year -1"=INTEG (
Laura Black 75
(150)
(151)
(152)
(153)
(154)
(155)
(156)
(157)
(158)
model
(159)
(160)
(161)
(162)
(163)
"changing in last year's fraction tested in year -1"-"changing out last year's fraction tested
in year -1",0)
Units: dimensionless
launch=
IF THEN ELSE (time before launch=TIME STEP,1,0)
Units: weeks
making special allocation=
(total engineers before special allocation-special allocation to testing)
/TIME STEP
Units: people/W eek
minimum time to address problem=1
Units: Week
minimum time to design part=1
Units: Week
minimum time to revise part=2
Units: Week
minimum time to test=4
Units: Week
new parts for next model year=
base value of new parts tparts postponed from last year*(1-postpone sooner switch)
+1*(STEP ("step in year -1 new parts",-1)+"pulse in year -1 new parts"
*P ULSE(103,52))
Units: parts
new parts for next model year recorded=INTEG (
changing in new parts-changing out new parts,new parts for next model year)
Units: parts
new parts for previous model year=INTEG (
changing in new parts for previous model year-changing out new parts for previous
year,0)
Units: parts
normal desired time to address problems=3.5
Units: weeks
normal desired time to design parts=5
Units: weeks
normal time to test=10
Units: weeks
parts per problem=1
Units: part/problem
parts postponed from last year=
Laura Black
year 0 work canceled or postponed*P ostponeW orkInY ear0 switch
Units: parts
76
Laura Black 77
(164)
(165)
(166)
(167)
(168)
(169)
(170)
(171)
(172)
(173)
(174)
(175)
(176)
(177)
percentage model year launched=
1-fraction work canceled
Units: dimensionless
performance=INTEG (
changing in performance-changing out performance,0)
Units: dimensionless
postpone sooner switch=0
Units: dimensionless
P ostponeW orkinY ear0 switch=0
Units: dimensionless
postponing parts=
IF THEN ELSE (time before launch = TimeToCancelOrP ostpone-3*T IME
STEP,postpone sooner switch *parts postponed from last year/TIME STEP,0)
Units: parts/Week
problems because of parts not designed=
year 0 new parts to design*problems per part
Units: problems
problems per part=
1/parts per problem
Units: problem/part
problems per part revised=0.2
Units: problems/part
“problems per prototyped part for year -1"=
ZIDZ("unIDd problems in year -1 prototyped parts","year -1 prototyped parts")
Units: problem/part
“problems per revised part for year -1"=
ZIDZ("unIDd problems in year -1 revised parts","year -1 revised parts")
Units: problems/part
"problems per tested part for year -1
ZIDZ("year -1 IDd problems","year -1 tested parts")
Units: problems/part
problemsolving productivity=0.3
Units: problems/(W eek*person)
"prototyping year -1 parts"=
IF THEN ELSE (launch=1,0,MIN("year -1 new parts to design"/minimum time to design
part,"engineers allocated to year -1 design"*design productivity))
Units: parts/Week
pulse in total engineers=0
Units: people
Laura Black 78
(178)
(179)
(180)
(181)
(182)
(183)
(184)
(185)
(186)
(187)
(188)
(189)
(190)
(191)
"pulse in year -1 new parts"=0
Units: parts
"pulse in year -1 problems per part"=0
Units: dimensionless
pulse in Year 0 problems per part=0
Units: dimensionless
quality at launch=INTEG (
changing in quality at launch-changing out quality at launch,0)
Units: dimensionless
reference time for desired design time=60
Units: weeks
reference time for desired problemsolving=50
Units: weeks
reference time for desired test time=40
Units: weeks
resetting engieners for year 0 problemsolving=
IF THEN ELSE (launch=1,annual engineers allocated to year 0 problemsolving
/TIME STEP,O)
Units: (people*W eek)/W eek
"resetting engineers for year -1 design"=
IF THEN ELSE (launch=1,"annual engineers allocated to year -1 design"/TIME STEP,0)
Units: (people*W eek)/Week
"resetting engineers for year -1 problemsolving"=
IF THEN ELSE (launch=1,"annual engineers allocated to year -1 problemsolving"
/TIME STEP,0)
Units: (people*W eek)/W eek
"resetting engineers for year -1 testing prototyped"=
IF THEN ELSE (launch=1,"annual engineers allocated year -1 testing prototyped parts"
/TIME STEP,O)
Units: (people*W eek)/W eek
"resetting engineers for year -1 testing revised"=
IF THEN ELSE (launch=1,"annual engineers allocated to year -1 testing revised parts"
/TIME STEP,0)
Units: (people*W eek)/Week
resetting engineers for year 0 design=
IF THEN ELSE (launch=1,annual engineers allocated to year 0 design/TIME STEP,0)
Units: (people*W eek)/W eek
resetting engineers for year 0 testing prototyped=
IF THEN ELSE (launch=1,annual engineers allocated to year 0 testing prototyped parts
/TIME STEP,0)
Laura Black 79
(192)
(193)
(194)
revise
(195)
(196)
(197)
(198)
(199)
(200)
(201)
(202)
(203)
(204)
Units: (people*W eek)/W eek
resetting engineers for year 0 testing revised=
IF THEN ELSE (launch=1,annual engineers allocated to year 0 testing revised parts
/TIME STEP,0)
Units: (people*W eek)/Week
resetting year 0 cancelled parts=
IF THEN ELSE (launch=1,year 0 work canceled or postponed/TIME STEP,0)
Units: part/Week
revising parts for year 0O=
IF THEN ELSE (launch=1,0,MIN(year 0 parts used in build or test/minimum time to
part,addressing problems for year O*parts per problem))
Units: parts/Week
"revising year -1 parts"=
IF THEN ELSE (launch=1,0,MIN("year -1 tested parts"/minimum time to revise part,
"addressing problems in year -1 prototyped parts"*parts per problem))
Units: parts/Week
SAVEPER =52
Units: Week
special allocation to testing=0
Units: people
step in total engineers=0
Units: people
"step in year -1 new parts"=0
Units: parts
sum of allocated engineers=
"engineers allocated to testing year -1 prototyped parts"+'"engineers allocated to testing
year -1 revised parts"+"engineers allocated to year -1 design"+'"engineers allocated to
year -1 problem-solving"+engineers allocated to year 0 design+"engineers allocated to
year 0 problem-solving"+engineers allocated to year 0 testing prototyped
parts tengineers allocated to year 0 testing revised parts
Units: people
Switch to postpone rather than cancel unfinished work=0
Units: dimensionless
TestAsDelay switch=0
Units: dimensionless
testing accuracy fraction=1
Units: dimensionless
testing productivity=10
Units: part/(Week*person)
Laura Black 80
(205) testing prototyped parts for year 0=
(IF THEN ELSE (launch=1,0,using prototyped parts in build+MIN(engineers allocated to
year 0 testing prototyped parts*testing productivity,year 0 prototyped parts/minimum time
to test)))*(1-TestAsDelay switch)+T estAsDelay switch*(IF THEN ELSE (launch=1,0,year
0 prototyped parts/minimum time to test))
Units: parts/Week
(206) testing revised parts for year O=
(IF THEN ELSE (launch=1,0, using revised parts in build+MIN(engineers allocated to year
0 testing revised parts*testing productivity,year 0 revised parts/minimum time to
test)))*(1- TestAsDelay switch)+T estAsDelay switch*(IF THEN ELSE
(launch=1,0,year 0 revised parts/minimum time to test))
Units: parts/Week
(207) "testing year -1 prototyped parts"=
(1-TestAsDelay switch)*(IF THEN ELSE (launch=1,0,MIN(testing productivity*
“engineers allocated to testing year -1 prototyped parts","year -1 prototyped parts"
/minimum time to test)))+TestAsDelay switch*(IF THEN ELSE (launch=1,0,"year -1
prototyped parts"/minimum time to test))
Units: parts/Week
(208) "testing year -1 revised parts"=
(1-TestAsDelay switch)*(IF THEN ELSE(launch=1,0,MIN(testing productivity*
"engineers allocated to testing year -1 revised parts","year -1 revised parts"
/minimum time to test)))+TestAsDelay switch*(IF THEN ELSE (launch=1,0,"year -1
revised parts"/minimum time to test))
Units: parts/Week
(209) time before build 1=
time before launch-weeks between build 1 and launch
Units: weeks
(210) time before build 2=
time before launch-weeks between build 2 and launch
Units: weeks
(211) time before launch=
IF THEN ELSE (Time<0, -(MODULO(Time,weeks in a year)),weeks in a year-(MODULO
(Time,weeks in a year)))
Units: Week
(212) time engineer allocated=1
Units: Week/Week
(213) TIME STEP =0.0625
Units: Week
(214) _ time to build=0.007
Units: Week
(215) TimeToCancelOrP ostpone=26
Units: weeks
Laura Black
(216)
(217)
(218)
(219)
(220)
(221)
(222)
(223)
(224)
(225)
(226)
(227)
81
total desired engineers to testing=
"desired engineers allocated to testing year -1 prototyped parts"+"desired engineers
allocated to testing year -1 revised parts"+desired engineers allocated to testing year 0
prototyped parts +desired engineers allocated to testing year 0 revised parts
Units: people
total engineers=
base value of total engineers +1*(STEP (step in total engineers,-1)+pulse in total
engineers*P ULSE(-1,52))
Units: people
total engineers after special allocation=INTEG (
making special allocation,0)
Units: people
total engineers before special allocation=|INTEG (
-making special allocation,total engineers)
Units: people
total problems for model year launched= INTEG (
changing in total probs-changing out total probs,0)
Units: problems
"total year -1 parts to be tested"=
"year -1 prototyped parts"+'year -1 revised parts"
Units: parts
"total year -1 unsolved problems"=
"unlDd problems in year -1 prototyped parts"+"unIDd problems in year -1 revised parts"
+"year -1 IDd problems"
Units: problems
total year 0 parts to be tested=
year 0 prototyped parts t+year 0 revised parts
Units: parts
total year 0 unsolved problems=
year 0 unlDd problems in prototyped parts +year 0 unlDd problems in revised parts
tyear 0 IDd problems
Units: problems
unlD problems per revised part for year 0O=
Z|IDZ(year 0 unlDd problems in revised parts,year 0 revised parts)
Units: problems/part
“unIDd problems in year -1 prototyped parts"=INTEG (
“creating unIDd problems in year -1 prototyped parts"-"discovering problems in year -1
prototyped parts"-"changing out unIDd problems in pp for year -1",0)
Units: problems
“unIDd problems in year -1 revised parts"= INTEG (
"creating unIDd problems in year -1 revised parts"-"discovering problems in year -1
revised parts"-"changing out unIDd problems in rp for year -1",0)
Laura Black 82
(228)
(229)
(230)
(231)
(232)
(233)
(234)
(235)
(236)
(237)
(238)
(239)
Units: problems
unlDd problems per prototyped part for year 0=
ZIDZ(year 0 unlDd problems in prototyped parts, year 0 prototyped parts)
Units: problems/part
using prototyped parts in build=
IF THEN ELSE ( build 1 switch=1 :OR: build 2 switch=1,year 0 prototyped parts
/TIME STEP,O)
Units: part/Week
using revised parts in build=
IF THEN ELSE (build 1 switch=1 :OR: build 2 switch=1,year 0 revised parts
/TIME STEP,0)
Units: part/Week
weeks between build 1 and launch=34
Units: Week
weeks between build 2 and launch=20
Units: weeks
weeks in a year=52
Units: weeks
"year -1 cumulative solved problems"=INTEG (
"accumulating year -1 solved problems"-"changing out cumulative solved problems for
year -1",0)
Units: problems
"year -1 IDd problems"=INTEG (
+'IDing more problems for year -1"+"IDing problems in year -1 prototyped parts"
-"addressing problems in year -1 prototyped parts"-"changing out IDd problems for year -1",0)
Units: problems
"year -1 new parts to design"=INTEG (
postponing parts+"changing in new parts for year -1"-"changing out new parts for year -1"
-"prototyping year -1 parts"-"canceling year -1 work",new parts for next model year)
Units: parts
"year -1 parts prototyped plus"=
"year -1 prototyped parts"+"year -1 revised parts"+"year -1 tested parts"
Units: parts
"year -1 problems per part prototyped"=
0.1+'"pulse in year -1 problems per part"*P ULSE(103,52)
Units: problem/part
"year -1 prototyped parts"=|INTEG (
"prototyping year -1 parts"-"testing year -1 prototyped parts"-"changing out parts
prototyped for year -1",0)
Units: parts
Laura Black 83
(240) "year -1 revised parts"=|INTEG (
"revising year -1 parts"-"testing year -1 revised parts"-"changing out rp for year -1",0)
Units: parts
(241) "year -1 tested parts"=INTEG (
+"testing year -1 prototyped parts"+'"testing year -1 revised parts"-"revising year -1 parts"
-"changing out tp for year -1",0)
Units: parts
(242) "year -1 work canceled"=INTEG (
"canceling year -1 work"-"changing out year -1 canceled work",0)
Units: parts
(243) year 0 cumulative solved problems=INTEG (
accumulating year 0 solved problems +changing in year 0 cumulative solved problems
-changing out year 0 cumulative solved problems,0)
Units: problems
(244) year 0 IDd problems=INTEG (
IDing problems for year 0+1Ding more problems for year 0+changing in IDd problems for
year 0-addressing problems for year 0-changing out IDd problems for year 0,0)
Units: problems
(245) year 0 new parts to design=INTEG (
changing in new parts for year 0-changing out new parts for year 0-creating prototype
parts for year 0-canceling or postponing year 0 work, initial year 0 parts to design)
Units: parts
(246) year 0 parts used in build or test= INTEG (
+testing prototyped parts for year O+ttesting revised parts for year 0+changing in tested
parts for year 0-revising parts for year 0-changing out tested parts for year 0,0)
Units: parts
(247) year 0 problems per part prototyped=
0.3+pulse in Year 0 problems per part*P ULSE (103,52)
Units: problem/part
(248) year 0 prototyped parts=INTEG (
creating prototype parts for year 0+changing in prototyped parts for year 0
-testing prototyped parts for year 0-changing out prototyped for year 0,
initial year 0 prototyped parts)
Units: parts
(249) year 0 revised parts=INTEG (
revising parts for year 0+changing in revised parts for year 0-testing revised parts for
year 0-changing out revised parts for year 0,0)
Units: parts
(250) year 0 unIDd problems in prototyped parts=|INTEG (
creating problems in prototype parts for year 0+changing in unIDd problems in
prototyped parts for year 0-discovering problems in prototype parts for year 0-changing out
unlDd problems in prototyped parts for year 0,0)
Units: problems
Laura Black 84
(251)
(252)
year 0 unIDd problems in revised parts=INTEG (
+creating problems in revised parts for year 0+changing in unIDd problems in
revised parts for year 0-discovering problems in year 0 revised parts-changing out unID
problems in revised parts for year 0,0)
Units: problems
year 0 work canceled or postponed= INTEG (
canceling or postponing year 0 work-resetting year 0 cancelled parts,0)
Units: parts
‘Laura Black