Table of Contents
Go Back —_—_—
BearingPoint
Business and Systems Aligned. Business Empowered.
Insurance Claims Capacity Analysis
within System Dynamics
Framework
Greg Szwartz
215.888.7888
Robert J udson
301.802.2409
Business and Systems Aligned. Business Empowered.™
Authors
This presentation was prepared by:
Greg Szwartz, Manager
BearingPoint
One Radnor Corporate Center
100 Matsonford Road, Suite 500
Radnor, PA 19087
Tel: 215-888-7888
E-mail: gszwartz@ bearingpointnet
Robert) udson, Senior Manager
BearingPoint
1676 International Drive
McLean, VA 22102
Tel: 301-802-2409
E-mail: rjudson@ bearingpointnet
BearingPoint
Business and Systems Aligned. Business Empowered.
This document is protected under the copyright laws of the United States and other countries as an unpublished work. This document
contains information that is proprietary and confidential to BearingPoint or its technical alliance partners, which shall not be
disclosed outside or duplicated, used, or disclosed in whole or in part for any purpose other than to evaluate BearingPoint. Any
use or disclosure in whole or in part of this information without the express written permission of BearingPoint is prohibited.
© 2002 BearingP oint (Unpublished). All rights reserved.
© 2002 BearingP oint, Inc.
Decision Support Services 1
—
Business Need BearingPoint
Business and Systems Aligned. Business Empowered,
Property and casualty insurance businesses track three
key metrics for the claims process:
e Loss Adjustment Expense (costs)
e Severity (the claim amount)
e Customer satisfaction.
Historically, companies have managed the three metrics
separately with specific initiatives targeted at specific
metrics without recognizing interdependencies.
e Loss Adjustment Expense (LAE) initiatives are cost-cutting
e Severity (the loss amount) is something that can surprisingly be impacted by the
quality of the claim handler, the amount of time there is to negotiate and settle, and
the level of customer service provided. Itis clearly a function of underwriting.
e Customer satisfaction initiatives are more “talked about” than acted on, but at times
they have been successful (State Farm Insurance is a classic example)
The result has been unintended consequences on the
metrics not targeted, and a cycle of continually re-working
the three metrics as thev ké@f’témina out of alidhthant'*’
———
Modeling Response BearingPoint
Business and Systems Aligned. Business Empowered,
Understanding the relationship between the three metrics (LAE, Severity,
Customer Sat.) is the only way to make effective estimates of the impact of
initiatives targeted only at loss adjustment expense (LAE/cost = the latest
industry focus).
A system dynamics model with all three metrics and the relationship between
them allows the client to test LAE-reduction initiatives in a “risk-free”
simulation environment and expose potential un-intended consequences.
The simulation focused on finding break-points in initiative success rates
where given the uncertainty in the model parameters, it was confident to
assume the business would respond UP TO the break-point and after that it
would be difficult to expect LAE (cost) reduction benefits without knowing
more.
The simulation is delivered as part of a new process and analytical toolset to
analyze initiatives before they are fully funded
The presentation offers an analogy to the Ideal Gas Law to make a
quantitative client excited about a model without having an SD background.
© 2002 BearingPoint, Inc Decision Support Services 3
The model is part of a new process for capacity
analysis prior to changes, consolidations, and new
benefit estimates
1. New ideas or initiatives that impact the
2:
3.
4.
5:
baseline set of model conclusions are
process
identified and enter the capacity analysis a
ew
ideas,
Holistically viewing potential issues around
consolidating locales
Thinking through potential impacts of new
technologies
the initiative is “mapped” against the
physics of the business
Will locale consolidation put stress on claims
closure at new locale, and what are the potential
implications for severity and customer satisfaction?
How should new technology adoption rate be
tempered by other concerns for surrounding
severity and customer service?
Production pressure, capacity, severity, or
customer satisfaction implications are
different for different Claim Handling
Centers
—
BearingPoint
Business and Systems Aligned. Business Empowered,
es Td
The strategic vision model is reviewed and
Business /
Budget
Planning
and Metrics
How does the
initiative reconcile
with the strategic
vision model?
Update the
Benefits
Realization
Plan
After identifying how an MCO will absorb
the change, a new benefits realization plan
is negotiated (e.g. no FTE reduction BUT
severity must drop)
Benefits realization plans are tracked and
updated in a process critical to closing the
loop and actually realizing benefits
© 2002 BearingPoint, Inc
aA
v
How will MCO
Capacities Be —
Affected
the change?
“Negotiate” the
Change with the
Spreadsheet
Decision Support Services 4
> aN
BearingPoint
Business and Systems Aligned. Business Empowered,
An analogy for the “Physics of the Business” helps
engage the client
Ideal gas law applied to claims processing: P*V = n*R*T
P =production pressure
V =volume of claims that can be handled by the existing capacity
n =notice counts (number of new claims)
R =Relief valve associated with severity maintenance
T =The quality of non-core non-closure processes like reserve maintenance and
customer care
Solving for each variable:
e P =nRT/V
— When notice counts (n) increases, production pressure increases
When process improvements and technology increases the volume of claims that can be handled
by the existing capacity (V) then the production pressure drops
e R =PV/nT
— When notice counts (n) increases, the severity maintenance relief valve is opened (lowering the
value of severity maintenance [R]) IF WE WANT PRODUCTION PRESSURE TO STAY
CONSTANT
— When management puts more focus on T, R must go down, or capacity V must go up
e V =nRT/P
With a fixed claims handling capacity (V), increases in notice counts (n) must be associated with
decreases in severity maintenance (R) and / or decreases in T. IfR and T don’t go down, then the
ideal gas law applied to claims processing would predict increasing production pressure (and this
ultimately must be relieved with R, T,.oxyaria les not included like staff bum-oug, attrition, Gtes vices 5
‘earingP oil ISIOn
——
A fixed claim volume... Times9
Severity SteadyState
Maintenance (R)
7 N
2 xs
Notice Counts
(n) Co
N
“the area in this triangle~ —
/ represents a fixed clai =
¢ handling capacity (V) ~
F With a “steady state” *
y production pressure (P) ~ LAE
— — — = —Reduction
Non-Cofe Non- —————— Efforts
Closure Processes”
(Customer Sat.) (T)
Closed Claims
Come Out
© 2002 BearingPoint, Inc. Decision Support Services 6
——
BearingPoint
Business and Systems Aligned. Business Empowered.
Shortly after a reduction effort, production pressure
rises, but this is not steady state Time=|
Severity NOI SteadyState)
Maintenance (R)
¢™~
4 ~ s "
di ™
7 Nolume (V) Fixed ~ 7
é ~S Triangle is
4 PRESSURE (P) RISES : .
7 WHENLAE REDUCTION DOES NOT ™* PULLED in this
v7 ACCOMPANY PRODUCTIVITY “ direction
4 INCREASES THAT INCREASE VOLUME R a
_ . — = = =Reduction
Non-CofeNon- = 2 2 OO Efforts
Closure Pfocesses
(Customer Sat.) (T)
© 2002 BearingPoint, Inc. Decision Support Services 7
Pressure COULD be relieved by a drop in R and T to
——
BearingPoint
reach steady state Time@=2 ~~...
Severity
Maintenance (R)
Volume (V) Fixed —_——
r/ ressure (P) Relieved
L Through Increased Severity and
Decreased Customer satisfaction
Non-Core Non-
Closure Processes
(Customer Sat.) (T)
© 2002 BearingP oint, Inc.
SteadyState)
LAE
~ Reduction
_ Efforts. > => =
“SUCCESSFUL
BUT NO
CHANGE IN
PRODUCTIVE
CAPACITY (V)
Decision Support Services 8
But if we increase productive capacity (V) with _—
productivity, the new steady state is “win-win” BearingPoint
s scales Neel ncn
| ~~ COQ T@:
! § a alli, Tie I= =)
everi
j Maintenance (R) ~S “a Hew/SteadiyStata
aN
| ™*
I >.
! >
I ss
I INCREASED PRODUCTIVE ~ ~ LAE
I CAPACITY / Volume (V) Reduction
Efforts~ ~
j Pressure (P) Relieved SUCCESSFUL ~~
Non-Core Noén-
Closure Processes.
(Customer Sat.) (T)
© 2002 BearingPoint, Inc. Decision Support Services 9
Managing the “Triangle” Successfully is the Key to
Sustaining Profitability while Reducing LAE
—
BearingPoint
Business and Systems Aligned, Business Empowered.
Ead chg severity
Customer F
Satisfaction
OS ciaims we FSS
closed claims
Claims capacity
Claim
Handlers chg handlers
3 SZ be LAE Reduction
Efforts WIP
© 2002 BearingPoint, Inc
SSN OS Cash
snet premiums expense
_ positive
it at of
ron
Initiatives
‘
— percent
Delivered ie ate
LAE Per
delivering LEA |_Reduction opportunity
reduction
average time to
deliver cost
reduction
Opportunity
Decision Support Services 10
LAE reduction effort “risk” and cost may be what Be ae ie,
causes increased pressure on claim handler capacity § C@ingroint
Business and Systems Aligned, Business Empowered.
ee chg severity
cost per
v7 <LAE Reduction opportunity
if Efforts Pat oan we
sd ~
# Long-term reduction comes LAE \
Pa Se ata short-term cost reduction 7]
Ks a « effort cost -
“PRESSURE (P) RISES ™. at eae
- i cost per
claim
handler
Cash
DS claims wie ——K A exéess
closed claims
Balancing the need to meet
ing “demand’-and
spew positive
Customer <= ‘ i Pie ot
Satisfaction Claim total efforts fmigugues
Handlers Iychg handlers y underway implementation ~ 1
~ 4
a success rate percent,
Delivered
LAE Reduction LAE re BS
Efforts WIP delivering LEA | Reduction Opportunity
A survey of over 500 IT 7 asuceacenl reduchon
executives shows that large \ Implementation
IT projects have less thana * \
20% chance of coming in
successfully and on budget
a
-_-—_— =
average time to
deliver cost
reduction
opportunity
© 2002 BearingPoint, Inc. Decision Support Services 11
Drilling-down on LAE reduction effort “types”
reveals “systemic” impacts
baa chg severity
BearingPoint
Business and Systems Aligned. Business Empowered,
coe peity
- mn Opportunit
j 1 WIP
Fa LAE
ff reduction
is effort cost
a cost per
} claim
; handler
Cash
SS claims wie - ~ Set premiums ae
i new claims closed claims be
; targetkAE
/ Claim Handling ME
Customer co Te LAE gap i ositive -
Satisfaction oo handler total efforts vextton
productivity Handlers ra tata platen) initiatives
NeTG anlete 7 underway implementation 1
productivity ‘++? ( SUBCESS [ate ercent
impact per Delivered xpense
Pte! LAE Reduction LAE reese”
- - LAE reduction efforts Ettore WIP deliverin g LEA Reduction opportunity
aw <
Process apace! Unsuccessful |,
Flexibility Implementation
; =~
infrastructure
consolidation;
s
average time to
aes! ae deliver cost
Infrastructure consolidation efforts may speed delivé reduction
limit flexibility in process. How does it directly impact Handler Cos’ opportunity
© 2002 BearingP oint, Inc.
Decision Support Services 12
Another Loop is Closed through Severity
competitors
5°
chg severity
Pressure on
BearingPoint
Business and Systems Aligned. Business Empowered,
ee ee ad Price Jae cost per
i <LAE opportunity
pressure to grow z price ? LAE F tion PWIP
“oo underwriting ~~. a Efforts &m
\ a effectiveness LAE
Se expense per _—_ reduction
7 account effort cost
t accounts’ . .
_ Ws 7 associated with
- = <Accounts> transactions cost per
‘ é aaa ens claim
? average frequency ‘ani Pressure to claim
account _< ; = acu im: pe) Cash
Claims WIP . ~sShet premiums expense
closed claims Se
targetLAE
Claim Handling nny Conng \
tia Capacity hen LAE gap 7 positive
/ Customer --- i at of
Satisfaction handler ;
‘ roductivity Claim 4 total efforts fe luction
p Handlers “J chg handlers underway; ‘
Me aos nae implementation 1
productivity Pal, success rate Y cent
impact per Delivered xpense
productivity LAE Reduction LAE 6 Bet
fi oxibilty inialive LAE reduction efforts Efforts WIP. delivering LEA | Reduction Oppormunity,
lexibili ‘ reduction
ee. Unsuccessful |,
Implementation
infrastructure
consolidation
average time to
© 2002 BearingP oint, Inc.
deliver cost
reduction
opportunity
Decision Support Services 13
a.
Model Results BearingPoint
Business and Systems Aligned. Business Empowered.
Looking at two expense
scenarios
Graph for expense
LAE reduction efforts without 2,200 _.
increases in productivity result in Ne comctity Inereaee
quarter 1-6 expense decreases, 6 100
BUT THIS BENEFIT IS LOST in ’
quarters 6-12 as production
pressure (which builds without 2,000
increased capacity [V]) is relieved
by falling customer satisfaction and 1,900
lost accounts
The win-win scenario allows for 1,800
capacity increases from productivity
initiatives at the same time that LAE 1700
reduction efforts take hold. This 0 12. 3.4 5.6 7 8 9 40d 12
scenario enables maintaining the Time (Quarter)
expense reduction.
Note: the expense increase after
quarter 9 is due to increased
customer satisfaction driving
accounts up and an associated
short-term increase in costs © 2002 BearingPoint, Inc. Decision Support Services 14
> aN
BearingPoint
Business and Systems Aligned. Business Empowered,
Model “Takeaways”
The strategic view leads to new questions to ask prior to
acting on LAE reduction initiatives
e How will the initiative impact the governing equation (PV=nRT) in the short-term and
long-term?
— Before productivity measures completely take hold (thus raising V), will there be a short-term
increase in severity maintenance (R) or increase in T (the quality of non-core non-closure
processes like reserve maintenance and customer care)?
If LAE reduction opportunities result in stream-lined operations that ALSO improve customer
satisfaction and lead to account growth, how will the limited capacity respond in the long
term?
e How quickly can the initiative be delivered, and what are the implications for other
active or planned initiatives?
How does the initiative amplify or balance the effectiveness of other initiatives?
Whatis the cost of delays or limited success?
The holistic view forces new answers from the business
units
e If productivity initiatives take hold and FTEs are not reduced, what will be delivered
with respect to severity reduction and customer satisfaction?
e Whatis the minimal capacity to maintain baseline operations, and WP COANIE Flee i
notice counts and ather valiime assumntinns result in maior increases in cve
BearingPoint
Business and Systems Aligned. Business Empowered.”
Back to the Top