The Effect of the New Capacity Investment Behavior in the
Korea Wholesale Electricity Market
Hyun-shil Kim, Nam-sung Ahn, Yong-Beum Yoon
Korea Electric power Research Institute
103-16 Muji-dong, Yusung-gu, Daejeon, 305-380 Korea
82-42-865-7626, 82-42-865-7619
kimhs@kepri.re.kr, nsahn@kepri.re.kr, y
Jae-kook Yu
Auju University
San 5 Wonchun-dong, Yeongtong-gu suwon, 443-749 Korea
82-42-219-2671
espresso@auju.ac.kr
Abstract
Since 2001 the generation facilities used be owned by Korea Electric Power Company
(KEPCO) have been divested to six independent firms as a part of industry
restructuring. Market mechanisms are in place that there is a competitive bidding by
these firms in the wholesale market, albeit strictly on a cost basis.
Related, Korean government continues to make use of "Basic Plan of Long Term
Electricity Supply & Demand" in order to insure (generation) resource adequacy. While
the plan is to provide insights to nation's outlook on electricity supply capability, often
addition of new generation capacities is controlled by this plan. It should be noted that
if the restructuring is to be complete, generation companies should not bear any
obligation to invest unless their profitability is guaranteed. Nevertheless, many experts
argue that government intervention is still necessary to avoid the undesirable price
spikes in the wholesale market.
In this study, simulations for two scenarios are conducted to examine whether
competitive market can help to stabilize the wholesale price in Korean market. The
simulation results show that government intervention can prevent the price spike
although the wholesale price in the competitive market turns out to be lower than that in
the regulated market due to the additional new investment. The model used in this
simulation has some significant limitations including the assumption that only gas
power plants can respond the market price.
Key word: Wholesale electricity market price; Investment Behavior; Basic Plan of long
term electricity supply & demand; System Dynamics
Introduction
The Korea electricity wholesale market is operated under the cost-based-pool system
and the government regulation, "Basic Plan of Long Term Electricity Supply &
Demand' in order to insure the resource adequacy. Addition of new generation
capacities is controlled by this plan. While the plan is to provide insights to nation's
outlook on electricity supply capability, often addition of new generation capacities is
controlled by this plan. It should be noted that if the restructuring is to be complete,
generation companies should not bear any obligation to invest unless their profitability
is guaranteed.
In competitive electricity market, the government regulation and the investors' behavior
affect the market prices. That impact lead to modification in government regulation and
new generation investment. But such dynamics effects has not yet been analyzed in
Korea electricity market.
In this paper, simulations for two scenarios are conducted to examine whether
competitive market can help to stabilize the wholesale price in Korean market using
system dynamics model. One scenario assumes that all new capacity is made based on
government plan. The other assumes that new gas plant capacity comes from investors'
investment according to their expected profitability.
The government's 'Basic Plan of Long Term Electricity Supply & Demand’
Korea government develops "Basic Plan of Long Term Electricity Supply & Demand"
every two years. The time horizon of the plan is 15 years. Figure 1 shows the 3rd Basic
Plan of Long Term Electricity Supply & Demand. The plan for construction of plants is
computed based on the simulation result of WASP (Wien Automatic System planning
Program, IAEA) which uses optimization model to calculate adequate capacity of plants
by fuel type to minimize the cost. The procedures for building the long term plan are
developed through the generation company survey. Government investigates the
intention of new investment from generation companies including IPP(Independent
Power Producer). After government considers the transmission conditions, site
acceptances, and demand growth, it decides the candidates for new investment. The
latest 3rd report was published in 2006 includes the plan for 2006-2020. Following table
1 shows outlook of the basic plan.
‘Annual avg.
Year 2006 2010 2020 cae
Demand (million kWh)
¢ ae » | 353,086 416,623 478,555 25%
Peak Demand (MWh) 58,990 64,160 71,810 18%
Table 1. Outlook for the Korea electric demand
3rd report supposes that the average demand growth rate and the peak load growth rate
will be each 2.5% and 1.8%, respectively in 2006 to 2020. Total capacities will be about
94,280MW in 2020. The nuclear and coal will be the main sources to produce the
electric power, at each 29% and 28%, respectively as shown in figure 1.
Fig.l. Outlook for the generation capacity
The goal of government's regulation is the electricity market stability by attracting
proper generation investment while keeping the reliability of system. The power
market's capacity reserve margin would be maintained about 22% level according to the
government plan.
Model Description
In this study, main modeling ideas make use of Andy Ford's study (1999, 2001). The
model assumes that Korea electric system will act as one market. In this market, price is
determined by electricity demand and supply i.e. the market clearing price for electric
energy is adjusted such that ISO schedules sufficient generation to meet the demand.
Electricity demand is used based on the government's forecasting data while electricity
supply is calculated by the generation unit's heat rate endogenously in this model. The
model simulates the spot price over the 24 hours in a typical day, with one day for each
quarter.
We assume that investors may select the only gas plants to construct depending on the
price of natural gas in competitive market while the others will be invested according to
government plan.
Figure 2 is a causal loop which shows the market price and gas plant investment. It
represents the adjustments in generation responding to the changes in the market price.
If the profitability of gas plant will be expected high, it leads to an increase of the
number of new gas plant and generation. In turn, this affects the market price
Investor's Bpected.
‘Copecty Profitability =~
i Levelized Cost of
Plant Investment Gs plants
“ Na price
New Gas Plants Meriet price
+
Total Generation Bedtricity Demand
K
. New Near & Coal
Bisting Plant's
lart's generation
omen x
Construction Plan
of @venrrent
Fig.2. Causal loop for determining the electricity market price
Figure 3 shows the stocks and flows used to simulated investor decisions on permitting
and construction. The investors estimate the market prices based on their estimate of the
future reserve margin. The estimated price is compared to the estimated cost of a gas
plant to determine if there are investors with permits who will start the construction.
Permit sheff life
Permit day inp @ in years <Corstrudion
years, Delayed Permits we Delayed completed oy in yeors>
received
\ my fa
p> Naw cas plants pe| Naw Gas parts ee a oe
Permit applications | in permritting | permits received | insite bank
. we ‘construction hcihiee capacity
eer> ‘Gs plants in
permitting and in Fraction started
Permit bank ‘each year
adustrrent time
ff Fraction started
Developers’ goal for Investors ener
MWof paperwork expected
profitability
<Gss plant's total
levelized cost> \
Investors
expected price
Fig.3 Stock and flows for new gas plant construction
The "Profitability" is the ratio of the expected price over a year to the total levelized
cost. If the ratio is 1, the investors would expect to meet their profitability goal. If the
ratio is 0.95, the price is 5% short of the value needed to meet their profitability goal.
The start of construction is simulated as an endogenous variable. The key variables for
determining the investors expected profitability are the gas plant's levelized cost and the
investors’ expected price.
Figure 4 shows the variables used to calculate the gas plant's levelized cost and Natural
gas price. The total levelized cost of a new gas-fired power plant is calculated in
$/MWh. The total cost consists of the fixed and variable costs. The levelized cost
provides a benchmark for investors to make comparisons. If their expectation of future
market prices falls below this benchmark, for example, they will be reluctant to invest.
The prices of natural gas used in this simulation are obtained from the historical data
and forward price in Korea gas market.
Gs plant total
levelized cost:
C&S variable
costs
C&S Variable’ 4
CaMast Cred : Set feet
a CC heat rate ‘ CCepeded cap
COGT fixed cost in
<Price of gas> $per
Capital cost Cred 08M
CC fred charge
rate
Fig. 4. Modeling to calculate the gas plant' levelized cost
Investors determine the expectation of reserve margin in the future using the expectation
for future demand and supply. The investors are assumed to assemble a forecast of the
supply available during the time of summer peak two years into the future. Also, they
would see additional supply and would count it in their assessment of the market. Lower
reserve margin implies tighter conditions and higher prices. Then, the model finds the
expected profitability to compare against the total levelized cost of new gas plant.
Another key endogenous variable is the fraction of approved permits to be exercised
each year. When the profitability reaches 1.0, we assume average investors will expect
to meet their goal. We assume that there is some diversity in investors' conditions. Half
of the investors will feel that their goals will be met; the other half will be unsatisfied.
So, we set the fraction of investors starting investment in this year to 50%.
Major input data
The wholesale market simulations begin in 2000 with 40,784MW of peak demand and
47,867MW of total generation capacity. There are four sets of 24 "shape factors" to
obtain the hourly loads for a typical day in each quarter. Figure 5 shows the demand
shape factors for Korea dividend Peak load in each season. The future demand is
calculated by this factor and expected future peak demand. Historical data were used for
electricity demand and capacity by 2005. For the remaining period, the government's
projected data was used.
1.2
1.0 '
08
0.6
04 Spring Sumrer Fal ' Winter
0.2 d
0.0
1 9 17 2385 3 4 499 57 6 7 81 89
Fig. 5. Seasonal demand shape in Korea
Hourly generation for non-base load plant is calculated by the spot market price and
resource's variable cost after deducting the forced outage rate and planed maintenance
rate from total capacities. The base load plan is must-run and hourly generation
multiplied by the available capacities by plant factor.
The prices vary continuously over 24 hours in a typical day. After 24 hours, we take the
day as representative of an entire quarter. This part of the model keeps track of the
prices for the quarter. When the simulation over quarter is done, the model updates the
record for the price in the previous quarter. This is done with conveyor stocks.
New gas plant's capital cost is set to $600/kw, fixed charge rate is 14.7%/year, heat rate
is 6800BTUs/kWhr, and variable O&M cost is zero. We assume that permitting delay
takes 12 months. After 24 months, the construction is completed, and newly constructed
gas plant begins its operation.
Simulation Result
Base case scenario; all new capacity will be made based on government plan
Figure 6 shows market prices from base case simulation. In hourly prices (the blue line),
price spikes represent the prices during the hourly peak demand. At the beginning of
simulation, the market prices are increased because of higher peak demand growth rate.
However, the quarterly market prices remain steady since sufficient supply is supposed
from government plan. This result represents that the wholesale market will be operated
stable without exhibiting price spikes under the government control. In addition, there is
no decrease in prices.
Woolesale Merket Price ($/MM\h)
150
100
50
2007 2006 2008 2010 aoe 24 De
Year
Fig. 6. Simulated Prices in the base case scenario
Figure 7 shows the comparison of demand with the capacity available to the system
operator in the base case. It shows a tight condition of reserve margins during all
simulation duration.
100,000
75,000
50,000
25,000
fey
2004 ‘2006 2008 2010 2012 2014 2016
Year
Demand
Capacity available
Fig. 7. Comparison of demand with capacity available in base case
Figure 8 shows the comparison of wholesale price with simulated prices and actual
SMP(System Marginal Price)in Korean wholesale electricity market. As shown in
Figure 8, the simulated wholesale price generally shows the similar agreement to the
actual SMP. However, there are some significant big gaps at the end of 2006. The main
reason is the expected gas prices which may be forecasted lower than actual gas prices.
The model doesn't consider plant's starting time or exact pumping storage generations.
oO
5
FESS. EPPS. e. en ee PS. 8. OSS gf
Fig.8 Comparison of actual SMP and simulated price
Investment scenario; the new gas plant capacity will come from Investors’ investment,
The other conditions are same as in the base case
Investment scenario reflects some competitive situation in the wholesale electricity
market. While investors may select from technologies ranging from distribution
technologies to coal and nuclear plants, only gas plants were assumed to be built
depending on the investor's decision for simplification.
Figure 9 shows the quarterly price comparison with base scenario and competitive
investment scenario. The simulation results reveal that investment scenario generates
lower prices but some peak price in 2007.If other technologies like coal can be invested
by investor, we may expect that the price volatilities may be even higher. The average
market price will be lower because the marginal cost of coal is lower than that of gas
plants.
Quaterly Market Prices($/MWnh)
130,
110
90
50
2004 2008 2008 2010 Eo 2014 2016
Basecase Scenario
Investrrent Scenario
Fig. 9. Market Price comparison for the investment scenario
The higher prices in 2007 appear when the investment in new generating capacity does
not keep pace with the growth in demand. After that the price is declining. This declines
caused by a large building boom in gas pant and higher generation capacity supply.
Figure 10 shows the simulated construction in the investment scenario. The construction
boom peaks in 2008 with over 9,000MW under construction. However, after the peak,
the construction decreases and no new capacity addition is made after 2012 because of
low expected wholesale prices. The blue curve shows the accumulated installed gas
plant capacity growing to over 20,000MW by the end of the first building boom. After
2012, there is no more increase in total installed capacity due to no additional
construction. Figure 10 shows a typical cyclical pattern of construction similar to what
is seen in real estate markets. Sterman explains that this boom and bust cycles in real
world arise from the combination of time delays in negative feedbacks and failure of the
decision maker to take the time delays into account (John D. Sterman, 2000 p.707).
New Gas Plant(MWv)
30,000
New Gas Capacity
22,500
15,000
ree es]
2006
Under Construction Capacity
Online Capacity
Fig. 10. Investor's construction of new gas plan
Figure 11 shows comparison of accumulated gas plant capacity based on government
plan, the actual survey results for intention provided by generation companies, and
simulated result. It can be seen that the survey results exhibits building two times higher
capacity than government basic plan. The accumulated gas plant capacity from survey
comes from the intention of generation companies, which reflects the investor's
behavior for their investment. The simulation results, which also consider the investor's
behavior, show similar behavior to the survey results.
2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017
[== Govenment Pian —=— Simulation Result —a— Investeor’s Survey |
Fig. 11 . Comparison of gas plant construction
Figure 12 shows the capacity reserve margin compared with two scenarios. While the
base case maintains a tight reserve margin, investment scenario increases the margin
from 8% to 45%. In the total generation company survey for government planning, the
investors respond that they will invest by 57.5% of reserve margin by 2020. From this
we infer that investors expect that profitability in the competitive wholesale electricity
market would be higher.
Reserve Margin(%)
60
45
30
15
0
2004 2006 2008 2010 2012 2014 2016 2018
Year
Basecase Scenario + + + + + -- + 4 4 4 4 4
Investment Scenario 2 2 2 2 ot — 2 2 2 2 2
Fig. 12. Comparison of the capacity reserve margin
Conclusion
This paper analyzed the regulation by government and investment behavior by market
signal in Korea electricity wholesale market using the system dynamics model. If the
present electricity market continues (especially generation capacity is controlled by
government), market will be operated stable without resulting in price spike but there is
no lower price because of maintaining the reasonable reserve margin. It also shows the
advantage in avoiding excessive investment. However, if the competition is introduced
and the new investment is determined by the investor's decision without government
intervention, the benefits from lower wholesale price are expected. Nevertheless, the
volatility in the wholesale market increases, which increases the investment risks. This
study provides important insights to Korea electricity market designers with respect to
generation adequacy issues. As usual, the market designers need to use more accurate
predictive model to capture the benefits of competitive markets and move ahead with
the on-going restructuring.
Reference
Andrew Ford, Modeling the Environment, Island Press, 1999.
Andrew Ford, "Waiting for the Boom: A Simulation Study of Power Plant Construction
California," Energy Policy, Vol 29, p. 847-869. 2001.
Andrew Ford, "Simulation Scenarios for the Western Electricity Market: A Discussion
for the California Energy Commission Workshop on Alternative Market for
California," Nov 2001.
John D. Sterman, Business Dynamics, Irwin McGraw-Hill, 2000.
Ministry of Commerce, Industry and Energy Korea. "Long-Term plan for Electricity
and Supply", Dec 2006
Namsung Ahn, Jaekook Yu. "Simulation of Power Plant construction in competitive
Electricity Market", International conference on Asian Energy in the Century,
Aug 2001.