The About 75% of the interioy parbitloning has been com
ploted iu the Commesary with concrete block. Installation of
duct work and conduit: is progressing without interference of
the subesero ¢limate we have experienced during the pant tO
weeks.
a. Yrection of kdditionel side panels for the central
heating plant te progressing slowly, Cold veather and heavy
anow have interfered somewhet with this opevetion.
3. Work on Admindatvetion Bullding "A" hes been momentae
plly suspended due to adverse weather.
he A formal, inspection was mode today by jolub represents
abives of the architect, the Construction Tund end myselt, os
agent for the University. Thle inspection Included the state of
ecampletion of the perimeter read, dam, underground stovm drains,
and site preparation on contracts now in affect. Agreement was
reeshed, and partial. payments will be made to the reapective
comberaetors, ‘based on these agreenonts,
Se Very Little work on the site will continue for the
next tvo and one-half montha owlng to the heavy snow conditlosa
amd cold temperatures.
G. Basie Construction Company have Iniieeted thet they
WLLL move in earthnoving equigient ombe the avefgole podium
on 13 dawuary, and, unless weather conditions are prohibitive,
WLLL commence thele excavations for Academia Group No. 1.
VMoterial. excavated fon the academle potiwn wilLL be used to
fALL the Low section olong Weatern Avenue, to bring Lt to
roper ererke.
T The Joke ia veelorming end ie within foue feet of the
top of the spl liway.