20 September, 1967
My. EB. W. Stevens
University Avchitech
State University of New Yoxk
10% Washington Avenue
Albany, New York 12210
Comprchensive Camus Plan Report of 23 Septendbor, 196i
Referenca: Report Tnelueive of Accompanying Drawinga end Sketches, dated
12 September, LOGY.
PARE OMe
Soments on Written Report » 13 September, 1LO6y
X. On Agenda, 1969, consideration showlé be elven alao to adding
electrical Laprovencnt ond velocation of power transmission
dines in the marrlod housing area, under utilities projects.
IZ. We concur in the competion debes Listed for all projecta under
the progronmed facilities to LOT, with the following exceptions:
As Project C126 ~ Multd-Purpose Meld House and. Chebiag Rink.
Completion date should be Septeriher LO71 insteail of Septenbex
gfe. Thin cament else applies to the Perking Structure 6
afjacent terete, Leth aff these chowld be bid in one package.
% Continuing Mucetion building should be comileted in Septem-
ber LO7O anstead of Sepbember LOTL. Budget xequests have
olready been initiated for this time phasing.
G. We concur in 60 mits of Married Student Hoysing eonpileted in
Septenber 1969, ‘but another 80 unit completion showla ‘be
scheduled im 1970. This would correspond to SUNY Central. Offlee
time scheduling for these flret two units.
D. ALL other completion dates are concurred in as shown.
TTL, Perking Capacities.
Ae we. concur in the total parking capacity wf 10,500 cars and the
‘the general. approach to the achievement of goal. There exe, however,
. some emblgulblea in the arLthmetic summation leading to the total
: of 10,500 aaxs, We suggest this be corrected.
aY. Athletic Facilities,
‘he This section is garbled and apparently essenibled in great harte.
Some evvera have therefore apparently cceurreid. A fow of thea
follow, but the whole summation should be checked:
two &
x¥e (A.) (contannct)
: sted for completion. This is in error,
ag lb whl be eoumleted in 1967.
®. Health ata! Physical, Mducatiow building Ne. 2 should be
Listed Yor campletion in 1970, aml shullerly, the Parking
Structure No. 9 adjacent thereto.
B. On top of the Parking end Reereatilon Structure, we would like
Bone comsideration siven to Lewa Bowling facllities, in ade
dition to the: other sports mentioned.
G. Under Shiase No. 3 © LOP219TL, agein Vealth and Physical Edue
cation building Nos. 2 ond @ are listed for canpletion. This
is in ervov, since building No. L will. be completed in 1967
and ullding Yo. 2 should be completed im LOPO.
D. Also under Phase No. 3, Multi-Purpose Auiitoriua le Listed
for completion lu Love. Ih ahowid be completed in 1971.
B. Under Contimutns Minerbion end Mexrrled Housing, Athletic
Pacilities have been repeated, which apparembly duplicated
those Listed for LO70«71L. Appavently this wos an erroneous
repetition.
Ve Hole & Company Ropers
Ae We conewr di tis veposrh iu ite axbircty.
VE. Mevhons
Planning Kepor
As tle concur.
Svructural and Architectural ond Bite
PAR 0
Comments on Drawings dated 12 September, 1967
i. Mastery Plan 196G«69
Ae We concur subject to the inclusion of one unit of GO Merried
Student Housing apaswtments scheduled for completion in 1969.
EX. Master Plon LOTO+'7.
de We concur except that another Married Student Housing block
of 80 wits should be listed for canpletion in 1969. This is
presently uot shown on this dreavring nox on the previous onw,
Hil. Mester Plan Loyee7h
As Multi-Purpose Auditorlyu and adjecent Parking Structure should
be listed for completion In LOT. instesd of ofa. Budget vee
guests have been processed on this basic and the need Ig Inainens.