27 June, 1963
Walter M. Tisdale
Pvesident Evan R. Collins
GANPUS PROGRESS REPORT 7/7
a. Bank xun, gravel has been spread for the baee
of the perimeter road in a alaeable stretch along
Woshington Avene and Killer Roads
a. Steel vork for central heating plant was
completed today.
3 A good sovrce for blacktop soll has bean dis«
covered at the eastern end of the lake bed, and is
being exploited to augment cur top soll bank, which
is. in short supply. This will also improve the lake
ik Concrete has been poured for the outlet
spillway at the lake and forms heve been removed .
flew dan has yet to be designed and constructed.
5 Peaty and Pubrman heve installed their field
office trailer ou site and a few personnel are already
at work