{ June, 1970
Walter M. Tisdale
President Allan Ay Kuuststo
Campus Progress Report No. 157 = Whiteface Atmospherte Sclences Research
‘Laboratory.
Work was resumed today, June ist, on the Whiteface Atmospheric Sclences Research
Laboratory (ASRC). Although the weather was permissive for the past two weeks on White#
face, the elevator was not put Inte operation unttl today, henee the work was delayed
unth) now.
An orlantation meeting will be called shortly with the architect and contractor,
probably on the site at Whiteface, to inspect the premises for any possible winter
damage, to note the status of the project, and to discuss this summer's schedule for
concluding The Job.
As you know, the Job ts scheduled te be finished this summer, with acceptance
scheduled for tate summer, and turnover to ASRC for operation tmmedlately thereafter,
Walter M. Tisdale
Assistant to the President
for Planning & Development
‘
Cen Dr. Vincent Schaeffer
Mr. Raymond Falconer
Barker and Henry