9 duly 1971
Joel M. True
President Louls T. Benezet
Campus Progress Report No. 175
Completion of Planting = East-West Podium Courts, !ndlan Quadrangle,
Health and Physical Education.
An acceptance Inspection of trees, shrubs, flowering plants and ground
cover Installed by Lawn Beautiful Nurserymen at the above locations was conducted
on 8 July 1971. A®S a result of the Inspection, all planting was accepted subject to
punch list,
Under the terms of the contract, Lawn Beautiful Nurserynen are respon
sible for maintaining the planting, and replacing any materlal which may dle, until
30 June 1973.
IMT
Cot Mr. John F. Buekhoff, Jr.
Mr. Fred Mastrianni