Politou, Alexandra with Patroklos Georgiadis, "Production Planning and Control in Flow Shop Operations using Drum Buffer Rope Methodology: A System Dynamics Approach", 2008 July 20-2008 July 24

ua435

This paper aims to introduce System Dynamics (SD) in applying Drum Buffer Rope (DBR) methodology of Theory of Constraints (TOC) in a three-stage flow shop system that produces a single product. To the best of our knowledge, although there are a lot of TOC applications using discrete simulation in production scheduling with DBR methodology, there are not any TOC application of DBR methodology in production scheduling using System Dynamics.

This is the whole item.

Date created
  • 2008 July 20-2008 July 24
Type
Processing Activity License

ITEM CONTEXT

Part of

6cbae5a21467df4434abbc87da443217

Scope and Contents
Part of

ce498623f0349395d0a141a0525190a0

Scope and Contents
Part of

23d738ba88f8333bc39725f9cb5bd0b8

Scope and Contents
Collection

System Dynamic Society Records

Scope and Contents
Collecting area

Elementos