Burns, James with Balaji Janamanchi, "Project Dynamics with Applications to Change Management and Earned Value Tracking", 2005 July 17-2005 July 21

ua435

In this paper, we present a novel project management model that incorporates several features yet to be actively addressed in the literature and focuses on earned value management. The model utilizes the basic structures employed in building project dynamics models. The effects of time-varying project team size, of training and communication overload, and of change management are incorporated into our model. With the help of our model and a hypothetical software technology project, we demonstrate how our system dynamics model can contribute beyond basic project tools like MS Project, in generating the earned value management indicators required by project managers under different scenarios and starting assumptions. Results are consistent with well-known behavior of projects in that the later the changes arrive, the longer is the delay in completing the projects. These phenomena are propagated through the earned value measures to see the actual effects upon schedule and cost performance indices. The study also focuses on the use of earned value measures as well as critical chain concepts to understand how these separately impact project duration and cost.

This is the whole item.

Date created
  • 2005 July 17-2005 July 21
Type
Processing Activity License

ITEM CONTEXT

Part of

cc5bb0ac12a5b68b26b1583548898dae

Scope and Contents
Part of

3c582e6f5cf305ef0030c7471b499022

Scope and Contents
Part of

23d738ba88f8333bc39725f9cb5bd0b8

Scope and Contents
Collection

System Dynamic Society Records

Scope and Contents
Collecting area

Elementos